CUORE LNGS Review, November 2008Karsten Heeger, Univ. Wisconsin 1 Calibration Slides for the CUORE Review at LNGS.

Slides:



Advertisements
Similar presentations
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Advertisements

Participants: C-1:Cryogenic last-stage suspensions (interferometers) (F.Ricci-G.Frossati) Objectives: -Design new suspension elements for the last stage.
19th – 20th of September 2007Cryogenic Expert Meeting at GSI, Jan Patrick Meier1/11 Cryogenic Experts Meeting at GSI, 2007 The SIS 100 Cryogenic Jumper.
Manchester 09/sept/2008A.Falou & P.Cornebise {LAL-Orsay}1 CALICE Meeting/ Manchester Sept 2008 SLAB Integration & Thermal Measurements.
Test Chamber Assembly, 1.5M Long (59.00”) Vacuum Tube, 4.00 OD x 3.50 ID Vacuum Tube, 3.75 OD x 3.51 ID 3.375” CFF, Non-Rotatable Feedthrough, Ceramtec.
Interim Design Amy Eckerle Andrew Whittington Philip Witherspoon Team 16.
4m Undulator Design Concepts Amanda J Brummitt CCLRC RAL On behalf of the HeLiCal Collaboration.
LARP LQX and MQX Cold Mass Testing at Fermilab Overview and Required Test Stand Upgrades Cosmore D. Sylvester.
R. Lemrani CEA Saclay Search for Dark Matter with EDELWEISS Status and future NDM ’06 Paris, September 3-9, 2006.
AWG 36, 0.2 A 0.3 mm Heat Shrink Tubing t = 0.38 mm Silicone Coating t = 0.2 mm D = 3 mm Shielding: Copper Tape AWG 26, 2.2A 0.6 mm AWG 26, 2.2A 0.6 mm.
Daniel Lenz, University of Wisconsin, Madison 11/05/ APS DNP Cryogenic search for neutrinoless double beta decay Daniel Lenz on behalf of the CUORE.
1 Presented at ColUSM by D. Ramos on behalf of the Cold Collimator Feasibility Study Working Group Longitudinal.
Critical Current Probe Mid-Point Review Amy Eckerle Andrew Whittington Philip Witherspoon Team 16 NHMFL Applied Superconductivity Center 1.
TOTEM Collaboration Meeting, Feb. 2005, F. Haug, CERN Cooling System for TOTEM Friedrich Haug and Jihao Wu Cryogenics for Experiments CERN TOTEM Collaboration.
Alignment and assembling of the cryomodule Yun He, James Sears, Matthias Liepe MLC external review October 03, 2012.
Mechanical Work Plan Discussion Bill Cooper Fermilab.
1 Cryostat assembly, integration and commissioning procedures M.Olcese Version: 07 May 2008.
Stefano Pirro LRT-2004 Sudbury December 13, 2004 Cleanliness backgrounds and surface contaminations in Cuore Stefano Pirro INFN-Milano.
Majorana collaboration meeting, Seattle, Aug.7 - Aug. 9 Béla MajorovitsGERDA detector mounting 1 GERDA Detector Mounting The Detector Holders Detector.
CUORICINO and CUORE Chiara Brofferio Università di Milano – Bicocca and INFN, Sez. di Milano NOW 2004 – Otranto 12 – 17 September 2004 On behalf of the.
First neutrinoless double beta decay results from CUORE-0
LBNL Test Cryostat Preliminary Design Review Tuning – Field Correction Soren Prestemon, Diego Arbelaez, Heng Pan, Scott Myers, Taekyung Ki.
R&D Status and Plan on The Cryostat N. Ohuchi, K. Tsuchiya, A. Terashima, H. Hisamatsu, M. Masuzawa, T. Okamura, H. Hayano 1.STF-Cryostat Design 2.Construction.
Cygnus 2013/06/05 Nagoya univ. H.Uchida for XMASS collaboration 1.
MQXF Cold-mass Assembly and Cryostating H. Prin, D. Duarte Ramos, P. Ferracin, P. Fessia 4 th Joint HiLumi LHC-LARP Annual Meeting November 17-21, 2014.
Assembly Scenarios Draft 1 MODEL simulation based on CXUO-CRY-AP-001.
Electrostatic Septum For AGS C. Pai Brookhaven National Laboratory Collider-Accelerator Department
SCU Layout Concept - Minimal Segmentation Joel Fuerst (ANL) SCU 3-Lab Review Meeting Dec. 16, 2014.
CRESST Cryogenic Rare Event Search with Superconducting Thermometers Max-Planck-Institut für Physik University of Oxford Technische Universität München.
SCU Segmented Cryostat Concept M. Leitner, S. Prestemon, D. Arbelaez, S. Myers September 2 nd, 2014.
Stefano Pirro, IDEA Meeting -Zaragoza November 7, Nd Project High Temperature Thermistors News about NdGaO 3 Scintillating Bolometers Conclusions.
THE CUORE EXPERIMENT: A SEARCH FOR NEUTRINOLESS DOUBLE BETA DECAY Marco Andrea Carrettoni on behalf of the CUORE collaboration 2 nd International Conference.
Karsten Heeger, Univ. of Wisconsin UW, June 3, 2010 The DM-Ice Test Detector Detector Concept Mechanical Assembly Vessel Options Logistics Considerations.
LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 06 June 2006 No 1 /17 LARP Phase II Secondary Collimator RC1 Collimator Test Program Plan Forward Revised.
Marc Anduze – 09/09/2008 Report on EUDET Mechanics - Global Design and composite structures: Marc Anduze - Integration Slab and thermal measurements: Aboud.
Arnaud Vande Craen (TE-MSC) 27/02/20131 EUCARD : ESAC Review – CEA Saclay.
1 WANG,Li/SINAP WANG Li, WANG ShuHua, LIU YiYong, SUN Sen, HU Xiao, YIN LiXin Shanghai Institute of Applied Physics, CAS, Shanghai , China Shanghai.
Status of Surface Sensitive Bolometers University of Insubria – Como, Italy INFN – Milano, Italy Prague, Chiara Salvioni.
Brookhaven - fermilab - berkeley US LHC ACCELERATOR PROJECT LHC IRQ Inner Triplet Review Q1, Q2, and Q3 Mechanics T. Nicol April 24-25, 2007.
Removal of 3 He from 4 He (R&D) David Haase, Franklin Dubose, Travis McCaw and Paul Huffman North Carolina State University.
Claudia Nones CEA/IRFU/SPP GDR Neutrino Meeting – Saclay – 4/11/15 The bolometric way towards the inverted hierarchy of the neutrino mass: CUORE-0 → CUORE.
9/17/07IRENG071 Cryogenic System for the ILC IR Magnets QD0 and QF1 K. C. Wu - BNL.
Status of the HV Test System Purposes of the HV test system Design and assembly progress Vacuum enclosure Projected assembly and test milestones (short-term)
LCGT f2f meeting/ICRR, 04/Aug./2011 N. KIMURA Status of the Cryogenics Design N. KIMURA A, S. KOIKE B, T. KUME B, T. OHMORI D, Y. SAITO C, Y. SAKAKIBARA.
Alignment and assembling of the cryomodule Yun He, James Sears, Matthias Liepe.
The integration of 420 m detectors into the LHC
Mike Struik / LHC-CRI INSTRUMENTATION FEEDTHROUGH SYSTEM FOR LHC MACHINE ARC QUADRUPOLE MAGNETS. 123rd LHC Vacuum Design Meeting 19 April 1999.
Proposed integration of cryo BLMs in LHC during LS1 V.Parma, CERN, TE-MSC With contributions/input from: M.Sapinski (BE-BI) Th.Renaglia (EN-MME) N.Bourcey.
ILC Cryogenic System Shallow versus Deep Tunnel Tom Peterson Dubna Meeting 5 June 2008.
8/29/07K. C. Wu - Brookhaven National Lab1 Major Components in ILC IR Hall Interchangeable Detectors.
-1- Steve Virostek (LBNL) and Li Wang (SINAP) Instrumentation for the MICE Coupling Coil Steve Virostek Lawrence Berkeley National Lab February.
MICE Prototype Coupling Coil Cooling Circuit Design Dan Cheng Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
Karsten Heeger, Univ. of Wisconsin UW, June 3, 2010 The DM-Ice Test Detector Detector Concept Mechanical Assembly Vessel Options Logistics Considerations.
Teleconf ACS – FREIA 28th March 2017
Teleconf ACS – FREIA 13th March 2017
Panda Solenoid Content Interface Box Cold Mass Layout Cooling Lines
X PS Internal Dump Core Review François-Xavier Nuiry Giulia Romagnoli
Update on He3 Services design since the ORNL meeting
HFM Test Station Main Cryostat
A. Vande Craen, C. Eymin, M. Moretti, D. Ramos CERN
Teleconference ACS – FREIA 17th October 2017
Teleconference ACS – FREIA 31st October 2017
The 11T cryo-assembly: summary of design and integration aspects
Teleconference ACS – FREIA 20th February 2018
WP3 Meeting – December the 10th 2015 H. Prin
CUORE Detector Calibration System
Uppsala University Contract UH2015/09 - UA2016/05 Job nr. 5973/7200
Cryostats Some ideas for the new Q1 to Q3 Hi-Lumi WP3 meeting
CEPC-650MHz Cavity Cryomodule
SC1R Cold Box PDR Assembly Sequence
Presentation transcript:

CUORE LNGS Review, November 2008Karsten Heeger, Univ. Wisconsin 1 Calibration Slides for the CUORE Review at LNGS

CUORE LNGS Review, November 2008Karsten Heeger, Univ. Wisconsin 2 Detector Calibration System vertical cross section of the cryostat Pb shield 300K 40K 4K 0.7K 80mK 10mK ~10mK Pb shield motion system: insertion and extraction of sources in and out of cryostat Source Deployment in between crystal towers to allow calibration of all bolometers guide tubes: no straight vertical access source strings: move under own weight in guide tubes top view of detector array with source positions source locations

CUORE LNGS Review, November 2008Karsten Heeger, Univ. Wisconsin 3 Detector Calibration System Mass of source crimps (x 30 crimps): Copper bead (1.8mm OD): 2.9 g PTFE sleeve: 0.5 g Fe 0.5mm dia wire: 0.3 g Motion Box and Drive Spool System load cell vacuum feedthrough with shaft vacuum flange motor electrical feedthrough narrow spool for spiral winding guide pulley drive spools can be removed for individual source exchange ~1m guide tubes detectors motion box

CUORE LNGS Review, November 2008Karsten Heeger, Univ. Wisconsin 4 Detector Calibration System Mass of source crimps (x 30 crimps): Copper bead (1.8mm OD): 2.9 g PTFE sleeve: 0.5 g Fe 0.5mm dia wire: 0.3 g radioactive source wire 56 Co: proton activated Fe wire 232 Th: Thoriated Tungsten wire Kevlar string Cu crimp PTFE heat shrink source wire flexible, moves in guide tube under own weight small mass: < 5 grams vertical distribution of source activity can be adjusted Source String Guide Tubes stainless and/or machined from solid, low-background copper ~1m ~10mm

CUORE LNGS Review, November 2008Karsten Heeger, Univ. Wisconsin 5 Calibration System: Cryogenic Challenges Calibration system must be integrated with complex detector cryostat Must meet available cooling power requirements at all thermal stages 300K 40K 4K 0.7K 80mK 10mK StageT [K]Calibration system cooling power budget [W] 40K40 – 50~ 1 IVC4 – 50.3 STILL0.6 – m HEX0.05 –  MC  TSP0.01 < 1  guide tubes bolometric detectors → Cooldown of source string → Friction heat during insertion/extraction → Static heat load of guide tubes: thermal conductance&radiation emission lead shield

CUORE LNGS Review, November 2008Karsten Heeger, Univ. Wisconsin 6 Detector Calibration System Radioactive Sources: 56 Co and/or 232 Th, both have been used in Cuoricino Schedule –Q4/2008: review of preliminary design of calibration system –Q1-Q3/2009: cryogenic tests of prototype source system with guide tube section at Wisconsin –Q4/2009: installation of 2 full-scale prototype guide tube routings in the CUORE cryostat at LNGS; tests at 300K and < 4K. –2010: installation and commissioning of the calibration system in the CUORE cryostat Simulations ~100 events over background per peak are required for successful calibration

CUORE LNGS Review, November 2008Karsten Heeger, Univ. Wisconsin 77