Raw Material & Sub-Assembly QA (Tim) 25/09/14 25/09/2014Material & Sub-assembly QA1.

Slides:



Advertisements
Similar presentations
Fibre Volume Fraction and Laminate Thickness
Advertisements

Stave Vacuum Tool Tim WP4 Face to Face Liverpool, 13/11/14.
Stave 130 Tooling John Carrol & Tim Jones. Status First generation stave assembly tool model modified to incorporate… – Stave Geometry Length 1277mm Width.
Lecture 2 SANDWICH COMPOSITES
SHAPING PROCESSES FOR PLASTICS Chapter 13- Part 2 Injection Molding
9/17/2003 1LRM Spec Review LRM Material and Process Spec Review Cindy Cole Certification Manager The Lancair Company.
FAA Specification Meeting Steven Peake FiberCote Industries Waterbury, CT.
Operations Management Week 01 Adapted from Operations Management by William J. Stevenson.
QA during Stave Core Assembly Stephanie Qing Yang (Oxford) 25 th Sept 2014 WP4 f2f meeting at RAL.
Tube to Foam Interface (Tim). Outline Discuss what’s known about the tube to foam interface – Describe problem – Issues – Theoretical Calculations – Anecdotal.
Stave core assembly Stephanie Yang WP4 face to face meeting, Lancaster University 20 Feb 2014.
Discussion examples Andrea Zhok.
1 Outer Tracker Mechanics, indico: May 2014, A.Onnela 21 May 2014 Thermally conductive carbon-fibre composite material for module and mechanics.
How to fabricate optimum/complex materials from single materials
MECH L 12 Hybrid Materials (2/2) 1/25 Lecture 12, Design of Composites / Hybrid Materials, or Filling Holes in Material Property Space (2/2)
SAMPLING PROCEDURES.
Manufacturing Input Ingredients Process Mixing, chopping, baking
Material calculation of petal core variants Sergio Díez Cornell with input from many people CERN AUW, 3 rd Nov 2014.
1 Reading Assessments. 2 EAs often assist with student assessments by conducting ______________________ assessments of language skills.
Stave Core QC Peter Sutcliffe RAL 24 th Sept 2014.
Some Recent BNL, LBNL and Yale Work 1.Honeycomb flatness from manufacturer 2.Commercially fabricated C-channel 3.VCR Fittings 4.BN powder thermal evaluations.
High strength materials are being increasingly used in designing critical components to save weight or meet difficult service conditions. Unfortunately.
US Stave Core Production D. Lynn (BNL), LBNL Mechanical Meeting, Sep
OBTAINING QUALITY MILL PERFORMANCE Dan Miller
All rights reserved © AEM - ALMA EUROPEAN CONSORTIUM All rights reserved Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
Ideas for LC mechanics (we will work on sensors as well – particular CMOS)
WP4 – Plans for next 6 months
A thermo-mechanical petal Sergio Díez Cornell Petal discussion, 24 Oct 2014.
Strip Stave cores Stephanie Yang ATLAS upgrade Oxford activities, January 2015.
Radiation Tolerant Electronics Expected changes Ph. Farthouat, CERN.
Thermo-mechanical petal status Sergio Díez Cornell 23Jan 2015.
Welding Inspection and Metallurgy
Operations Management Optimising operations. The aim of an OM system is to extract maximum productivity and quality from the production process. This.
 What type of Inspection procedures are in use  Where in the process should inspection take place  How are variations in the process detected before.
Lecture 22: The mechanism of plastic deformation, part 2
Plank #7 and beyond. 2 What was new for plank#7? Carbon-fibre jig Oversize (by 10mm) facesheets during stave core build –Facesheets now at the very limit.
Stave C channel side closeout gluing jig S Yang WP4 monthly meeting at Liverpool University 26 th March 2014.
Stave 130 Geometry Peter Sutcliffe ATLAS Strips WP4 Meeting 26 th March 14 Liverpool.
Materials R. Bates. Contents What we said that we would do What we have done – What is left to do from original list New things to add.
Local Supports to IDR Discussion ATLAS Upgrade Week November 2014.
Stave Core Thermo-mechanical and Electrical Performance Requirements (Tim) 10/07/2013Liverpool WP4 Meeting (11/7/13)1.
Stave130 Assembly Jig (Tim). Current Tooling Components – CF jig + ‘C’-channel jig & various face-sheet positioning aids It works! – Seems to produce.
Task 4.2 Stave Core Assembly (Tim). Task 4.2 Outline Year 1: Design and construction of staves and stavelets suitable for 130nm ASICs which will be used.
“The Goal” and Agile An attempt at mapping concepts from “The Goal” by Eliyahu Goldratt (Theory of Constraints) to the Agile Software Development Process.
Stave production.
Dr. Dipayan Das Assistant Professor Dept. of Textile Technology Indian Institute of Technology Delhi Phone:
A hollow stave Ian Wilmut – August LBL stave At the March UG week LBL showed a prototype asymmetric stave. This prompted consideration of the strip.
Mechanics R&D Ian Wilmut. Talk Scope This talk is to provoke conversation – not to direct activities. The slides should do no more than start the conversation.
Some Comments on the Use of CGL for the Foam-Pipe Interface 1 D. Lynn (BNL), LBNL Mechanical Meeting, Sep 2012 We have been using CGL exclusively in the.
The first question is really "Why do you need a control system at all?” Consider the following: What good is an airplane if you are a pilot and you.
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
1.2 m Stave with Co-cured Facings Using Low Areal Density Fiber G. Viehhauser (Oxford) C. Haber (LBNL) T. Hurteau, W. Emmet (Yale) R. Rurns, D. Lynn (BNL)
WP4 Liverpool 21 June 2012 Graham Beck 1 Summary/Update of Steady State FEA: Perfect Plank and Plank with a small fault. New: Simulation of Transient behaviour.
Stave #12 This stave core was built together with William Emmet, Tom Hurteau, and Jeffery Ashenfelter from Yale University in the week of November.
Stave Tooling & Plans for Future Stave-building (Tim)
Thermo-mechanical petals Volker Prahl, Sergio Díez, on behalf of the petal community CERN AUW, 3 rd Nov 2014.
Elements of Fabrication II - Material Properties Developed and Testing LBNL Composites Workshop February 29-March 3, 2016.
(Tim Jones).  Who am I? ATLAS-UK Tracker Upgrade work-package leader for WP4 (Mechanics)  Materials, Cooling, Stave Core Assembly, Module Mounting,
Stave 130 (Intermediate Thermo-mechanical Stave) Tim.
Quality is the totality of features and characteristics of product or services that bear on its ability to satisfy the stated needs.  In simple words.
Your Electricity Expenses During Winter and Summer Cooling fans are an essential component of any electronic system. The reason for this is that electronics.
Strip Stave Status & Plans at Yale Yale: Paul Tipton, Will Emmet, Tom Hurteau.
1. Our Presentation Topic: Importance Of Validation & Qualification In Pharmaceutical Industries Presented By: Md. Tanjir Islam (Group C) 2.
Thermal modeling, interfaces, test results LBNL Composites Workshop February 29-March 3, 2016.
Summary LBNL LSWG meeting
Are there better ways to build a stave?
A comparison of Some Properties of Sandwich Test Tokens with Various Core Materials (Tim)
Mechanics: (Tim).
Overview of processes.
Testing & Modification Suggestions
Presentation transcript:

Raw Material & Sub-Assembly QA (Tim) 25/09/14 25/09/2014Material & Sub-assembly QA1

Scope Stave Core Assembly needs raw materials and sub-assemblies Raw Materials (things that come as a ‘batch’, things which originate in industry?) – CFRP pre-preg - roll of 11” width – Hysol EA9396 – 1USQ packs – Boron-nitride powder – End closeouts – ‘C’-channels – Positioners & locking points – Bus Tapes – Honeycomb – Thermally-conducting foam Assemblies – Cooling loops – Co-cured face-sheets? 25/09/2014Material & Sub-assembly QA2

Schematic 25/09/2014Material & Sub-assembly QA3

During Pre-production Need to understand how potential defects in raw materials might translate into a measurable change in final stave core performance. Eg: – 10% decrease in thermal conductivity of foam – Gaps & wiggles in the 45gsm pre-preg – 10% lower honeycomb shear modulus – Effect of variation in 100:30 Hysol glue mix (95:35 to 105:25 say) – Effect of ‘C’-channel twist on final stave core geometry We have to rely on FEA for this as it is impractical to procure small batches of raw material with such property variations – Need to make sure the FEAs are up-to-date and validated by performance comparisons with ‘perfect’ objects Then we can place meaningful tolerances on critical parameters. Eg; – ‘C’-channel twist: torque needed to make a twisted ‘C’-channel flat is < some limit – Need to mix Hysol to (100+/-2:30-/+2) and therefore need measuring systems accurate enough to guarantee the +/-2 – Reject sections of pre-preg where there is a gap of more than 3mm over a length of more than 30mm Then we can develop easy-to-use test systems which can measure critical parameters to better than (say) 1/3 of the permitted tolerance. – i.e. we shouldn’t set specification which are so tight making the measurements becomes too onerous – conversely the test systems must have sufficient resolution to avoid rejecting perfectly good items through random error. 25/09/2014Material & Sub-assembly QA4

During Production Apply the test systems developed consistently and in a timely manner – Very important that we give rapid feed-back to the suppliers of any changes in quality A batch comes in and we need to check it out immediately Therefore may need multiple test systems to come with the spike & some fraction of the effort is naturally ‘pulsed’ – Very tight link with procurement, stock control & payment Especially important for long lead-time & single-source supplies (eg. Allcomp foam, CF honeycomb, pre-preg) 25/09/2014Material & Sub-assembly QA5

Sub-Assemblies Here I considered two; cooling loop & co-cured face sheets – Each is a composite item made from several components, each of which would have its own parts flow & quality control systems From a Stave Core Assembly point of view they’re just a ‘raw material’ except that ‘we’ manufacture them – We can ensure that the proper QC happens during sub- assembly manufacture However….. We may (be asked/choose to) manufacture more of these than the UK share in return for some other in-kind contribution – We will therefore carry a much greater burden of scrutiny as a quality control failure here will propagate to the whole barrel strip stave assembly project 25/09/2014Material & Sub-assembly QA6

So… what to test? ItemTests K13C2U/EX-1515 pre-pregWaviness, gaps, laminate density, CPT, areal weight, degree of cure (DSC), FTIR Tensile modulus (0/90), tensile strength (0/90), thermal conductivity K9 FoamDensity, Thermal Conductivity, compressive modulus, shear modulus… HoneycombDensity, shear modulus, cell uniformity… Hysol EA9396Tensile strength at nominal & slightly wrong mixes. Degree of cure after 3days at RT (DSC)… ‘C’-channelsChannel geometry, mass, straightness, resistance to flattening if twisted… 25/09/2014Material & Sub-assembly QA7

Comments The list becomes quite long! – But we shouldn’t worry – it’s good to start with a long list and then go though each item and take a critical view of each test to see if we think it’s sensible – For those tests which we would like to keep we nee to ensure that the required facilities exist and would be accessible to us during production – remember we really do need rapid feedback so we can’t have ‘I might be able to do it next week sometime!’ Ideally we want the minimum number of tests during production to guarantee quality plus a couple more just in case! – Likely that equipment cannot exist in one place (might even not be preferable) Should compile a list of facilities (together with access constraints) which can be used in both the pre-production and production phases. My inclination is that during production we don’t necessarily need to have access to state-of-the-art equipment but need something which is capable of resolving variations which we might be sensitive to. 25/09/2014Material & Sub-assembly QA8

Next Steps 25/09/2014Material & Sub-assembly QA9