Cavity performance vertical test → horizontal test → CM test C.M. Ginsburg On behalf of the ILC Database Group with special thanks to Detlef Reschke, Lutz.

Slides:



Advertisements
Similar presentations
E. KAKO (KEK) 2010' Sept. 10 KEK Global Design Effort 1 Operational Results from STF-VTS and Cryomodule Tests at KEK Eiji Kako (KEK, Japan)
Advertisements

Progress of ILC cavity gradient database and yield C.M. Ginsburg On behalf of the ILC Database Group Baseline Assessment Workshop, Tsukuba/WebEx September.
US Cavities Status and Plan Mark Champion 01 October 2009.
Superconducting Accelerating Cryo-Module Tests at DESY International Workshop on Linear Colliders 2010 (ECFA-CLIC-ILC Joint Meeting) Denis Kostin, MHF-SL,
ILC PM Meeting S0 Webex Global Design Effort 1 S0/S1 Next Steps Lutz Lilje GDE.
WG3: Main Linac H. Hayano, C. Nantista, C. Pagani.
Overview of the ILC and SRF Program (With an emphasis on Px) Shekhar Mishra ILC & SRF Program Fermilab.
E. KAKO (KEK) 2010' Sept. 10 KEK Global Design Effort 1 Lorentz Force Detuning Eiji Kako (KEK, Japan)
Rong-Li Geng Jefferson Lab High Efficiency High Gradient Cavities - Toward Cutting Down ILC Dynamic Heat Load by Factor of Four R.L. Geng, ALCW2015,
SCRF WebEx Meeting May 14, Report from PMs and APMs 2.Technical Design Phase R&D plan (rev. 3) 1.High Gradient R&D guideline 2.S1-global preparation.
Cavity degradation after vert. test on the way or in the module, James Kerby ~10% agreement in results across laboratories typical ~20% degradation VT.
SRF Cryomodule 2 Cavity Test Results Andy Hocker TD/SRF Dev Dept. All Experimenters Meeting, 10-OCT-2011.
Americas S0 Plan in USA Shekhar Mishra Fermilab/GDE US Main Linac Cavity and Cryomodule WBS.
Cavity Yield Re-Evaluation Plan C.M. Ginsburg (Fermilab) July 10, 2009 (Essentially a copy of presentation June 24, 2009 to SCRF-ML WebEx meeting with.
SCRF Monthly WebEx Meeting June 30, 2010 Agenda 1.Report from PMs (5 min.) 2.General Report from Group Leaders(15 min.) 3.Special Discussions 1.TDP R&D.
Cavity Productions at DESY DESY -MPY- FNAL Overview on the cavity productions Review of cavity performance Some conclusions.
The ILCTA_MDB Horizontal Test Stand for SRF Cavities Andy Hocker FNAL-TD AEM, 25-JUN-2007.
Summary of Main Linac SCRF-part H. Hayano, ILC08 at UIC.
Cavity Gradient for the R&D and ILC Operation Akira Yamamoto ILC-GDE SCRF Presented at the AD&I meeting held at DESY, Dec. 2-3, 2009 A, Yamamoto,
R.L. Geng, KEK September 9, 2010 Global Design Effort 1 Near Term ILC Gradient R&D R&D Specification and Standardization Gradient Gradient Yield/Scatter.
Americas Region: T4CM Status and Plans H. Carter TD SRF Dev. Dept. July 14, 2006.
Global Design Effort 1 S0 Status High-Gradient cavities Lutz Lilje DESY supplement by H. Hayano 04Sep2008 EC
Beijing ILC Workshop Global Design Effort 1 High-Gradient Module Test Lutz Lilje.
R.L. Geng, 5/27-31,2013 ECFA LC2013, DESY 1 Update on Raising Q0 at Ultra-High Gradient via Large-Grain Niobium Material Rongli Geng Jefferson Lab ECFA.
Rongli Geng March 4, th LCC ILC Cavity Group Meeting
Fermilab 2 Dec 2009CM Ginsburg Global Cavity Database Report C.M. Ginsburg (Fermilab) On behalf of the database group (as part of S0 effort):
Harry Carter – LCFOA Meeting 5/1/06 1 LCFOA Technical Briefings: Cryomodules H. Carter Fermilab Technical Division.
Americas Main Linac Cavity and Cryomodule WBS X.9 Resource Proposal.
SRF Processing at ANL: Progress and Plans ANL: Mike Kelly, Scott Gerbick FNAL: Dan Olis, Allan Rowe Speaker: Mike Kelly November 17, 2008.
A Satellite Meeting at IPAC-2010 SCRF Cavity Technology and Industrialization Date : May 23, 2010, a full-day meeting, prior to IPAC-2010 Place: Int. Conf.
Cavity Yield Re-Evaluation Plan C.M. Ginsburg (Fermilab) June 24, 2009.
TILC09 SCRF Session Global Design Effort 1 EU Status TILC09 SCRF Session Lutz Lilje DESY.
E. KAKO (KEK) 2009' Oct. 26 ILC KEK Global Design Effort 1 Cavity Preparation for S1-Global Eiji Kako (KEK, Japan)
HiGrade-Kickoff DESY Global Design Effort 1 ILC-HiGrade WP6 High-Gradient cavities Lutz Lilje DESY.
SCRF Cavity WebEx Meeting May 17, 2010 Reports from PM (10 min.) – Brief report from ILC-PAC – Industrialization workshop as IPAC satellite meeting, Kyoto,
LHC vacuum chamber dust High Pressure pure water rinse –Developed at CERN for LEP sputtered SCRF NEG Coating –Most likely must be re-applied Nozzles and.
2014/3/25TTC Meeting Beam Operation Experience at Quantum Beam Project in STF Kirk.
S1-Global status report KEK Norihito Ohuchi 2008/11/171ILC08-GDE-Meeting-Chicago.
JLab Update Rongli Geng April 30, th LCC ILC Cavity Group Meeting.
High Q 0 preservation Andy Hocker Fermilab TTC CW Workshop, 13-JUN-2013.
FNAL SRF Program: 1.3 GHz Camille M. Ginsburg (FNAL) Fermilab Accelerator Advisory Committee November 7-9, 2011.
Recent FNAL/ANL Cavity Performance C.M. Ginsburg (FNAL) On behalf of the FNAL/ANL Cavity Crew TTC Meeting - Milano 28.Feb.-3.Mar
Gradient Degradation Experience at Fermilab (NML/CM-1) Elvin Harms TTC Meeting, Beijing 5-8 December 2011.
A Proposal for FJPPL (TYL) Development of Frequency Tuners Optimization and Cryomodule Integration for 1.3 GHz SRF Cavities G. Devanz, F. Nunio, O. Napoly.
Hans Weise, DESY TTC Meeting, Milano, February 28 – March 3, 2011 Technical Board Meeting TESLA Technology Collaboration Meeting Milano, February 28 th.
1.3 GHz Cavity/Cryomodule Performance Camille M. Ginsburg (FNAL) FNAL-LBNL joint meeting on SRF Cavities and Cryomodules March 15, 2012.
Americas Report C.M. Ginsburg (FNAL) for the FNAL/ANL, JLab, and Cornell (no report this time) cavity teams S0 Meeting 7.June 2011.
Start of S2 Milestone Work H. Padamsee. Intro At KEK S2 meeting we decided to make a list of milestones and eventually cost S2 activities I tried to start.
Experiments on thermal cycling
for the FNAL/ANL, JLab, and Cornell cavity teams
Evolving an ILC focused SCRF Facility from the XFEL Infrastructure
Infrastructure inventory and use
European-XFEL summary: Cavities/Modules performance
Magnetic shields inside and outside LHe tank in S1-Global cryomodule assembly at KEK E. KAKO (KEK) 2011' Dec. 07 TTC meeting in Beijing.
Charge for the Technical Board Members of the Tesla Technology Collaboration (TTC)
BAW Prep S1 Global Status Pilot Plant Status
2. SCRF General Preparation for the AD&I Preparation for AAP Review
2nd TTC Topical Workshop on « SRF Cryomodule Clean Room Assembly »
WG3: Main Linac SCRF(cavity,cryomodule)
Degradation and possible sources Statistic of resonators
ADS Accelerator Program in China
Performance of Superconducting Cavities for the European XFEL
Performance of Large Grain TESLA cavities
Update on Dark current generation in ILC Main Linac
Development of Large Grain Cavities at DESY
EU-XFEL summary of performance degradation
Retreatment of Superconducting Cavities for the European XFEL
TTC meeting at Milano, 2011' Feb. .28
Cryomodule Performance in FLASH and XFEL
TTC Meeting, July , Saclay, France.
Presentation transcript:

Cavity performance vertical test → horizontal test → CM test C.M. Ginsburg On behalf of the ILC Database Group with special thanks to Detlef Reschke, Lutz Lilje and Jim Kerby for their assistance Baseline Assessment Workshop, Tsukuba/WebEx September 10, Sep.20101CMGinsburg BAW

Cavity performance vertical test -> horizontal test -> cryomodule test At IPAC10 in May 2010, for the Sept.9-10 Baseline Assessment Workshop, the ILC Database Group was charged to provide data on performance change vertical test (VT) -> horizontal test (HT) -> cryomodule (CM) test using: (1) Existing data from DESY (e.g., Denis Kostin, SRF2009) (2) Additional data from Fermilab/JLab for vertical test -> horizontal test This is a status report. The work is in progress. 10.Sep.20102CMGinsburg BAW

DESY/FLASH Cavity Performance Data are courtesy of DESY Source: D.Kostin, Grömitz These cavities are installed in FLASH; the data are easily accessible 10.Sep.20103CMGinsburg BAW

DESY/FLASH upgrade module Data are courtesy of DESY Source: D. Kostin et al., SRF PXFEL1 These cavities are installed in FLASH; the data are easily accessible 10.Sep.20104CMGinsburg BAW

DESY VT vs. CM Test Performance Data are courtesy of DESY Source: L. Lilje et al., EPAC Four CM from p.2: ACC1=M2*, ACC2=M1*, ACC4=M4, ACC5=M5 included here Additional data exist, but are less easily accessible. Have to be careful not to double-count cavities for re-assembled CMs Our goal is to make a similar updated plot, to compare performance 10.Sep.20105CMGinsburg BAW

more international data available soon backup S1G: CM test by end-Sept.2010 CM1: CM test by end-Dec.2010 CM2: horizontal tests by Dec.2010; CM test in Sep.20106CMGinsburg BAW

VT/HT/CM Test Comparison Summary/Plans  Available data 56 cavities from 7 cryomodules easily accessible M1*, M2*, M4, M5, M6, M7, PXFEL1 Comparing VT/CM test: 20 gradients go up, 25 go down, 11 are mixed or same Several types of surface processing (#bcp=35, #ep=17, #ep+=4) All cavities have VTs and CM tests; some do not have HTs <56 add’l cavities from 7 cryomodules available, but data less accessible M1, M2, M3, M3*, M3**, M8; must be careful not to double-count any cavities PXFEL2 results not yet publicly available Near-future data: PXFEL3, S1-Global, Fermilab-CM1, Fermilab-CM2  Issues Surface processing type: We assume this comparison is a test of the assembly rather than surface processing, and we use all process types for comparison Gradient meaning limits comparison Get different gradients for different input power (CW, pulsed w/different rep rates) Field emission effects not included so far Measurement error in gradient: 10-16% HT, 5-10% in VT  Plan Sebastian is getting the DESY data and confirming consistency of the data set with DESY colleagues, then the ILC database group will make requested plots 10.Sep.20107CMGinsburg BAW