Goals and Status of MICE The International Muon Ionization Cooling Experiment J.S. Graulich.

Slides:



Advertisements
Similar presentations
1 MICE Beamline: Plans for initial commissioning. Kevin Tilley, 16 th November. - 75days until commissioning Target, detectors, particle production Upstream.
Advertisements

Progress in the construction of the MICE cooling channel and first measurements Adam Dobbs, EPS-HEP, 23 rd July 2011.
FIGURE OF MERIT FOR MUON IONIZATION COOLING Ulisse Bravar University of Oxford 28 July 2004.
ISIS Related Issues for MICE Adam Dobbs Proton Accelerator Development Meeting, RAL 24 th March /03/20111A. Dobbs.
MICE the Muon Ionization Cooling Experiment Emilio Radicioni, INFN EPS-HEP Aachen 2003.
Particle ID in the MICE Beamline MICE Collaboration Meeting 30 March Paul Soler, Kenny Walaron University of Glasgow and Rutherford Appleton Laboratory.
International Muon Ionization Cooling Experiment Edward McKigney Imperial College RAL March 25, 2002 Physics Motivation and Cooling Introduction.
Changing the absorbers: how does it fit in the MICE experimental programme? Besides the requirement that the amount of multiple scattering material be.
CHIPP Sept 2005Jean-Sébastien GraulichSlide 1 What is MICE  Muon Ionisation Cooling Experiment  What is Ionisation Cooling ? Cooling = Reduction of Beam.
Alain Blondel MICE: Constraints on the solenoids 2.Field Homogeneity: or ? this will be dictated by the detector requirements. TPG will be.
March 2003 Paul Drumm MICE Collaboration Meeting, CERN 1 Beam Line & Installation Plans Paul Drumm CLRC Rutherford Appleton Laboratory.
Kirk McDonald Monday, 28th May Report of the International Working Group on Muon Beamlines Bruno Autin, Roberto Cappi, Rob Edgecock, Kirk McDonald,
MICE: The International Muon Ionization Cooling Experiment Diagnostic Systems Tracker Cherenkov Detector Time of Flight Counters Calorimeter Terry Hart.
DPNC Sept 2007Jean-Sébastien Graulich MICE The international Muon Ionization Cooling Experiment o o Introduction o o Beam Line o o Cooling Channel o o.
Mark Rayner, Analysis workshop 4 September ‘08: Use of TOFs for Beam measurement & RF phasing, slide 1 Use of TOFs for Beam measurement & RF phasing Analysis.
CMPB Alain Blondel 14 April STATUS OF MICE.
INExT – Henry Nebrensky – 24 September 2010 slide 1 Goals and Status of MICE the international Muon Ionization Cooling Experiment Henry Nebrensky (Brunel.
Emittance measurement: ID muons with time-of-flight Measure x,y and t at TOF0, TOF1 Use momentum-dependent transfer matrices iteratively to determine trace.
Emittance measurement: ID muons with time-of-flight Measure x,y and t at TOF0, TOF1 Use momentum-dependent transfer matrices to map  path Assume straight.
Status of the Muon Ionization Cooling Experiment (MICE) Yagmur Torun Illinois Institute of Technology April 1, 2013.
Particle Production in the MICE Beam Line Particle Accelerator Conference, May 2009, Vancouver, Canada Particle Production in the MICE Beam Line Jean-Sebastien.
MICE: The International Muon Ionization Cooling Experiment Ulisse Bravar University of Oxford ICHEP ‘04 1 MICE: The International Muon Ionization Cooling.
2002/7/02 College, London Muon Phase Rotation at PRISM FFAG Akira SATO Osaka University.
2002/7/04 College, London Beam Dynamics Studies of FFAG Akira SATO Osaka University.
The status of the construction of MICE Step IV K. Long, on behalf of the MICE collaboration.
Results from Step I of MICE D Adey 2013 International Workshop on Neutrino Factories, Super-beams and Beta- beams Working Group 3 – Accelerator Topics.
MICE Beam-line and Detectors Status Report 16 th October 2009 Chris Booth The University of Sheffield.
MICE : the Muon Ionization Cooling Experiment M. Yoshida (Osaka Univ.) for the MICE Collaboration Osaka - Overview and Status -
MICE Step 1: First Emittance Results with Particle Physics Detectors Linda R. Coney EuCARD Meeting – 10 May 2011.
ICHEP 2012 Melbourne, 7 July 2012 Paul Soler on behalf of the MICE Collaboration The MICE Beam Line Instrumentation (Trackers and PID) for precise Emittance.
Takashi Matsushita Imperial College T. Matsushita 1 MICE Status Excerpt from talks at MuTAC review:
Particle Production in the MICE Beamline IPAC10 Linda Coney, UC Riverside, Adam Dobbs, Imperial College London, Yordan Karadzhov, Sofia University The.
MICE at STFC-RAL The International Muon Ionization Cooling Experiment -- Design, engineer and build a section of cooling channel capable of giving the.
Magnet vacuum vessel w/radiation shield and cold mass in place Magnet leads (left) and the three cryocoolers on the top of the spectrometer solenoid service.
MICE TARGET OPERATION C. Booth, P. Hodgson, P. J. Smith, Dept. of Physics & Astronomy University of Sheffield, England. 1 – The MICE Experiment2 - The.
MICE Status & Plans MICE-UK paul drumm 15 th September 2004.
MICE RF Workshop Alain Blondel MICE = critical R&D for neutrino factory and muon collider 1 neutrino factory: accelerate muons and store to produce.
MICE: The International Muon Ionisation Cooling Experiment MOPLT106 Abstract The provision of intense stored muon beams would allow the properties of neutrinos.
1M. Ellis - NFMCC - 31st January 2007 MICE Analysis.
Instrumentation and Simulations for Target Test MICE Collaboration Meeting 22 October Bill Murray 1, Paul Soler 1,2, Kenny Walaron 1,2 1 Rutherford.
IDS-NF Accelerator Baseline The Neutrino Factory [1, 2] based on the muon storage ring will be a precision tool to study the neutrino oscillations.It may.
29 September 2006M.Sakuda NuFact06 Asian Regional Outlook (Japan) -by Y.Kuno (Osaka) (1) SuperBeam (T2K) (2) J-PARC current upgrade plan (3) T2HK or T2KK.
Progress in the construction of the MICE cooling channel and first measurements Adam Dobbs, EPS-HEP, 23 rd July 2011.
CHIPP Aug 2010J.S. GraulichSlide 1 MICE and the Neutrino Factory Jean-Sebastien Graulich, Geneva.
- MICE - The Muon Ionization Cooling Experiment Jean-Sebastien Graulich, Univ. Genève o Introduction: Aims And Concept o Design o Infrastructure: Hall,
MICE RF review Alain Blondel 1   MICE The International Muon Ionization Cooling Experiment.
MICE CM20 Alain Blondel 10 February The International Muon Ionization Cooling Experiment MICE CM20 Spokesmouse remarks.
ch/~bdl/lepc/lepc.ppt 1 MICE Status and Plans Rikard Sandström Université de Geneve International Scoping Study CERN,
CHIPP Oct 2007Jean-Sébastien Graulich Status of MICE Jean-Sebastien Graulich, Univ. Genève o o Introduction o o Beam Line o o Technical Design o o PID.
CARE08 Dec 2008Jean-Sebastien GraulichSlide 1 MICE, a facility for precision beams and muon cooling o MICE in EuCARD o MICE Facility: Beam, Infrastructure.
Monte Carlo simulation of the particle identification (PID) system of the Muon Ionization Cooling Experiment (MICE) Mice is mainly an accelerator physics.
A Student on MICE Adam Dobbs, Imperial College Goldsmith’s Particle Physics Summer School 21 st July 2009.
(one of the) Request from MPB
MICE S TEP IV P HYSICS ‘D ELIVERABLES ’ V. Blackmore MAP 2014 Spring Meeting 30 th May, /15 AKA “What will we learn from Step IV?”
S TATUS OF THE P HYSICS A NALYSIS V. Blackmore MICE Project Board 29 th April, /30.
K. Long, 28 June, 2016 Introduction to MICE — and the role of the Hydrogen Delivery System.
MICE. Outline Experimental methods and goals Beam line Diagnostics – In HEP parlance – the detectors Magnet system 2MICE Optics Review January 14, 2016.
Research and development toward a future Muon Collider Katsuya Yonehara Accelerator Physics Center, Fermilab On behalf of Muon Accelerator Program Draft.
1May, IPPP- Imperial College, London1 NF activities at IC (part II) m. apollonio.
MICE. Outline Experimental methods and goals Beam line Diagnostics – In HEP parlance – the detectors Magnet system 2MICE Optics Review January 14, 2016.
Experimental Tests of Cooling: Expectations and Additional Needs
Muon Ionisation Cooling Experiment Overview
TOF Software and Analysis Tools
MICE The International Muon Ionisation Cooling Experiment
MICE: First Beam Emittance Results w/Particle Detectors
(Muon Ionization Cooling Experiment)
The Muon Ionization Cooling Experiment: Controls and Monitoring
K. Tilley, ISIS, Rutherford Appleton Laboratory, UK Introduction
Particle ID Diagnostics in the MICE Beamline
The Detector System of the MICE Experiment
Presentation transcript:

Goals and Status of MICE The International Muon Ionization Cooling Experiment J.S. Graulich

Plan  Motivations  Muon Cooling  MICE Design and Challenges  MICE’s current status Beam Line Detectors Simulation and Analysis Software  Preparing for the future  Conclusion WIN 11J.S. GraulichSlide 2

WIN 11J.S. GraulichSlide 3 Motivations: Neutrino Physics  Fundamental questions raised by neutrinos Do they conserve the lepton number? Are they their own anti-particle ? Do they have Majorana masses ? Do their oscillations violate CP ? Why masses are so small ?  A strong need for precision measurements Mixing angles, Mass differences, Mass Hierarchy,  CP  Requires a new generation of facilities Among the options: Super beam, Beta beam and Neutrino factory Neutrino factory is not the simplest offers the best potential: performance and flexibility See Boris Kayser’s talk: “Seeking CP violation in neutrino oscillation is now a worldwide goal.”

Motivation: The Neutrino Factory Slide 4 High energy & intensity Very well defined beam content ( , e ) or ( , e ) Start to End Simulation exists IDS ! see A. Cervera 3 essential R&D needed - High power Target - Muon Cooling - FFAGs The neutrino factory is the ultimate tool for precise neutrino studies Sensitivity to  CP CERN Scientific Policy Committee, March 2010

Muon Cooling  Large divergence > < efficient acceleration  Beam Cooling = Emittance reduction  What is emittance ? ≠ divergence In the 2D case (oversimplified) a beam is defined by a set of x i (z) x’ = dx/dz = Px/P WIN 11J.S. GraulichSlide 5 In the absence of dissipative forces,  is conserved !

Ionization Cooling  How to reduce emittance ? -> Frictions  Standard techniques don’t work for muons They need >> 2.2  s  Two steps Energy loss by ionization (dE/dX) Forward re-acceleration by RF cavities WIN 11J.S. GraulichSlide 6 Cooling is achieved only for low Z material ! Mult. Scat. < dE/dx -> Liquid Hydrogen

Cooling Cell  Easy in principle…  In practice, the emittance is so large that Need to contain the beam Not single pass -> iterations  Technical Challenges An extended liquid Hydrogen cryogenic system High gradient RF cavities in strong magnetic field Large number of Superconducting coils strongly coupled to each other  That’s why we need R&D -> MICE WIN 11J.S. GraulichSlide 7

MICE WIN 11J.S. GraulichSlide 8  Muon Ionisation Cooling Experiment Design, build and operate a realistic section of cooling channel Measure its performances (in different modes)

MICE Step By Step Commission beam line & detectors Precisely measure incoming emittance & compare trackers Precisely measure muon cooling Test sustainable cooling Ultimate MICE goal: operate full cooling channel Slide 9 J.S. Graulich 2012 Complete ! (This talk)

WIN 11J.S. GraulichSlide 10 MICE RAL  Rutherford Appleton Laboratory, UK Brand new muon beam line Obtained from ISIS (800 MeV proton Synchrotron)

WIN 11J.S. GraulichSlide 11 MICE Beam Line Design Specifications: - ~ - ~ 1 Spill / 2 seconds - ~ - ~ 3 ms Spill duration muons / Spill - Muon momentum between 140 to 240 MeV/c - p D2 = p D1 /2 (backward muons) D1 D2 Q1-Q3 Q4-Q6Q7-Q9

The Beamline is Operational WIN 11J.S. GraulichSlide 12 Pion Decay Solenoid (during installation) Q7-Q9 Q4-Q6 D2 Downstream Muon Beam Line Mice Target System in ISIS Upstream Pion Beam Line Q1-Q3 D1

The Target is pulsing Stator Position reading Bearing Ti Target Water Cooling MICE Ti Target inside the ISIS beam pipe  Critical active part  Parasitic mode: no perturbation to ISIS Users  80 g acceleration !  Magnetic “gun”  Hz

Slide 14 Instrumentation for Step 1 All detectors for Step 1 are operational TOF0 after the 2 nd triplet TOF1 after the 3 rd triplet TOF2 at the very end (will move) Luminosity Monitors 3 Time of Flight Stations Calorimeter 2 Cherenkovs Downstream Monitor (GVA1) Beam Profile Monitors

Detector Rates WIN 11J.S. GraulichSlide 15 Detector Rates scale linearly with Beam Loss

Lyon, Octobre 2009Slide 16 All TOF installed  Two crossed layers of scintillator slabs, 1” thick  Fast PMTs on both sides  Muon/pion/electron PID  Measure the RF phase when muon arrives  Magnetic shielding is crucial for TOF1/2 TOF1 installed at RAL TOF Scintillator

TOF Resolution WIN 11J.S. GraulichSlide 17

WIN 11J.S. Graulich Particle Identification Very precise Time of Flight measurement between TOF0 and TOF1 Allows separation between Electrons / muons / pions / For all momenta up to 280 Mev/c

WIN 11J.S. Graulich Selecting Backward Muons We want a muon beam ! We tune the second dipole (D2) to select muons going backward (in C.M. frame) w.r.t. to the original pions’ direction P  ≈ P  / 2

Pure muon Beam WIN 11J.S. Graulich20 Selecting backward muons Pions are not transported Electrons are depleted MICE has a muon beam ! ~ 30 muons/spill/ V.ms

Lyon, Octobre 2009Jean-Sébastien GraulichSlide 21 Simulation and Analysis Software: G4MICE  Based on GEANT 4 for the simulation A deliverable by itself  Also used for beam transport optimization In competition with G4Beamline  Reconstruction of events from both simulation and data Calculate elaborated quantity like  In particular: momentum G4BeamLine Transport G4Mice Simulation and Analysis

WIN 11J.S. GraulichSlide 22

Q789 = -30% Phase Space and Momentum Reconstruction: Q789 scan runs m. apollonio Simulation Data

Phase Space and Momentum Reconstruction: Q789 scan runs m. apollonio Q789 = -20% Simulation Data

Phase Space and Momentum Reconstruction: Q789 scan runs m. apollonio Q789 = -10% Simulation Data

Step 1 Program: beam optics  3 momenta 140, 200, 240 MeV/c  3 input emittances 3, 6 10  mrad  A lot of data on tape  Next run in June 2011 WIN 11J.S. Graulich26

Slide 27 Next Step: Spectrometer Construction problems with the superconducting solenoids Tracker Ready, tested with cosmics, meet resolution specs Installation scheduled for 2012

Lyon, Octobre 2009Jean-Sébastien GraulichSlide 28 Absorbers - FC  Each Absorber contains 20 L of Hydrogen  Produced at KEK, Japan  Thin Aluminum widows, all doubled for safety  The module integrates the absorber with the superconduction focus coil in production at Tesla  Integration to Step IV in st absorber complete at Mirapro

Lyon, Octobre 2009Jean-Sébastien GraulichSlide 29 RFCC Module  Each module contains 4 RF cavities and a superconducting coupling coil  Water cooled copper cavities, 201 MHz  Each module compensates for MeV energy loss in the absorbers  High Gradient (8 MV/m) in strong magnetic field (~4 Tesla)  Manufacturing in progress  Expected for 2013

Summary  The Neutrino factory is the best tool for future precise neutrino studies  MICE is exploring muon ionization cooling which is a key R&D toward the NF  MICE has completed its first step at RAL, UK  The muon beam and the detectors have been successfully commissioned  A particle by particle analysis has already been used to measure the beam emittance, using TOFs  The spectrometers and the first absorber will be installed in 2012  MICE could be completed by 2013 WIN 11J.S. GraulichSlide 30

WIN 11J.S. GraulichSlide 31