Nairobi, Kenya, 26 – 27July 2010 Regulatory Monitoring and interventions on Quality of Service Derick simiyu khamali Compliance and Enforcement Officer.

Slides:



Advertisements
Similar presentations
Requirements Engineering Processes – 2
Advertisements

1
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
Chapter 1 The Study of Body Function Image PowerPoint
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 6 Author: Julia Richards and R. Scott Hawley.
Author: Julia Richards and R. Scott Hawley
Properties Use, share, or modify this drill on mathematic properties. There is too much material for a single class, so you’ll have to select for your.
Objectives: Generate and describe sequences. Vocabulary:
ELECTRONIC DATA COLLECTION SYSTEM Howard Hamilton.
UNITED NATIONS Shipment Details Report – January 2006.
RXQ Customer Enrollment Using a Registration Agent (RA) Process Flow Diagram (Move-In) Customer Supplier Customer authorizes Enrollment ( )
for Cabin Safety Inspectors
Business Transaction Management Software for Application Coordination 1 Business Processes and Coordination. Introduction to the Business.
1 Introducing the Specifications of the Metro Ethernet Forum MEF 19 Abstract Test Suite for UNI Type 1 February 2008.
Nairobi, Kenya, 26 – 27July 2010 Role of ITU-T & ITU-R Ahmed ZEDDAM Ahmed ZEDDAM, ITU-T SG5 Chair France Telecom Orange ITU-T Workshop on Delivering Good.
Nairobi, Kenya, 26 – 27July 2010 EMF MEASURING IN KENYA Derick simiyu khamali Compliance and Enforcement Officer Communications Commission of Kenya ITU-T.
Nairobi, Kenya, 26 – 27July 2010 Quality of Service Monitoring Tool Tahitii OBIOHA Network Planning & Optimisation Engineer Planet Network International.
1 RA I Sub-Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Casablanca, Morocco, 20 – 22 December 2005 Status of observing programmes in RA I.
Nairobi, Kenya, 26 – 27July 2010 Maintaining Equipment Standards to ensure good QoS Mwende Njiraini Engineer I/NT/LCS Communications Commission of Kenya.
Joint ITU/ECA Regional Workshop on Information and Communication Technologies (ICT) Indicators Gaborone, Botswana October 2004
Module N° 9 – SMS operation
State of New Jersey Department of Health and Senior Services Patient Safety Reporting System Module 2 – New Event Entry.
Create an Application Title 1A - Adult Chapter 3.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
1 Click here to End Presentation Software: Installation and Updates Internet Download CD release NACIS Updates.
Excel Functions. Part 1. Introduction 2 An Excel function is a formula or a procedure that is performed in the Visual Basic environment, outside the.
Site Safety Plans PFN ME 35B.
1 According to PETROSAFE safety policy, the company is keen that: Introduction All Egyptian Petroleum companies and foreign companies working in A.R.E.
REVIEW: Arthropod ID. 1. Name the subphylum. 2. Name the subphylum. 3. Name the order.
1 Chapter One Introduction to Computer Networks and Data Communications.
Chapter 5 – Enterprise Analysis
Red Tag Date 13/12/11 5S.
PP Test Review Sections 6-1 to 6-6
Direct Benefit Transfer Beneficiary List Management System.
EU market situation for eggs and poultry Management Committee 20 October 2011.
Bright Futures Guidelines Priorities and Screening Tables
EIS Bridge Tool and Staging Tables September 1, 2009 Instructor: Way Poteat Slide: 1.
CS 6143 COMPUTER ARCHITECTURE II SPRING 2014 ACM Principles and Practice of Parallel Programming, PPoPP, 2006 Panel Presentations Parallel Processing is.
2 |SharePoint Saturday New York City
Exarte Bezoek aan de Mediacampus Bachelor in de grafische en digitale media April 2014.
VOORBLAD.
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
1 RA III - Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Buenos Aires, Argentina, 25 – 27 October 2006 Status of observing programmes in RA.
Factor P 16 8(8-5ab) 4(d² + 4) 3rs(2r – s) 15cd(1 + 2cd) 8(4a² + 3b²)
Basel-ICU-Journal Challenge18/20/ Basel-ICU-Journal Challenge8/20/2014.
1..
CONTROL VISION Set-up. Step 1 Step 2 Step 3 Step 5 Step 4.
© 2012 National Heart Foundation of Australia. Slide 2.
Adding Up In Chunks.
1 © 2004, Cisco Systems, Inc. All rights reserved. CCNA 1 v3.1 Module 2 Networking Fundamentals.
Note to the teacher: Was 28. A. to B. you C. said D. on Note to the teacher: Make this slide correct answer be C and sound to be “said”. to said you on.
Model and Relationships 6 M 1 M M M M M M M M M M M M M M M M
Analyzing Genes and Genomes
Prof.ir. Klaas H.J. Robers, 14 July Graduation: a process organised by YOU.
1 Titre de la diapositive SDMO Industries – Training Département MICS KERYS 09- MICS KERYS – WEBSITE.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
Essential Cell Biology
1 Phase III: Planning Action Developing Improvement Plans.
Intracellular Compartments and Transport
PSSA Preparation.
Essential Cell Biology
Immunobiology: The Immune System in Health & Disease Sixth Edition
1 Chapter 13 Nuclear Magnetic Resonance Spectroscopy.
Energy Generation in Mitochondria and Chlorplasts
Profile. 1.Open an Internet web browser and type into the web browser address bar. 2.You will see a web page similar to the one on.
TCP/IP Protocol Suite 1 Chapter 18 Upon completion you will be able to: Remote Login: Telnet Understand how TELNET works Understand the role of NVT in.
Presentation transcript:

Nairobi, Kenya, 26 – 27July 2010 Regulatory Monitoring and interventions on Quality of Service Derick simiyu khamali Compliance and Enforcement Officer Communications Commission of Kenya ITU-T Workshop on Delivering Good Quality Telecommunication Service in a Safe Environment in Africa (Nairobi, Kenya, 26 July – 27 July 2010 )

Nairobi, Kenya, 26 – 27 July Introduction The regulatory body for Kenya is called the Communications Commission of Kenya CCK which handles all issues of monitoring and interventions in the Communications industry. CCK Was established by an ACT of parliament in 1998 and started operations in July 1999.

MONITORING Is a powerful and most effective tool for the regulator. It keeps the operator awake. Works on an established standards and procedures Done through: Compliance returns Inspections Using of monitoring tools and instruments. 2/23/2014 8:15 AM 3

4 Need for Monitoring There are many license categories with QoS obligations There is need for quality and good business practices. There is need to confirm accuracy of Compliance returns There is need for independent QoS verification. Need for consumer protection.

2/23/2014 8:15 AM 5 Objectives of Monitoring Independently verify QoS. Determine QoS in specific geographical areas Determine operational status Identify and stop illegal operations

2/23/2014 8:15 AM 6 License categories The Commission has a unified licensing framework: ASP- Application Service Providers. NFP – Network Facilities Provider. CSP – Content Service Providers. BPO – Business Process Outsourcing. IGS – International Gateway Services. TEC – Technical Equipment Contractors. Technical Personnel License.

2/23/2014 8:15 AM 7 Other License categories A few licensees are still on the old regime including: ISP, PDNO, IBGO, VSAT, PVSAT, DCNO, LLO, Vendors and Contractors.

Mode of Monitoring Based on the ACT, Regulations and License Condition. Scheduled Inspection throughout the country within the year as per the performance contract. Adhoc inspection as need arises. This is either reported or is perceived and ordered by the Commission. For specific issues to be inspected/Enforced. Use of Checklists and Questionnaires. 8

2/23/2014 8:15 AM 9 Adopted Procedures The Commission follows the procedure below: Schedules for licensees to inspect are Prepare considering; regions, license categories and any letters raised with issues and any new licensees. Approval for the inspection. The inspection tools are set. The inspection team visits the licensees as schedule. The findings are shared with the Licensee and the checklist is signed.

Post Processing (Internal) After the inspection as scheduled, the inspection team converges in the office to evaluates the checklist and any other findings. Information received is collated with facts in the office and necessary action checked The reports are done for each licensee and then sent to management for action/advise on recommendations. 10 2/23/2014 8:15 AM 10

Regulatory Interventions Defined as: A deliberate and timely decision (s) made on case to case basis. Activated at the point of interest either following a complaint, change of operating regime or regulatory action on identified irregularity. SLAs enforcement. 2/23/2014 8:15 AM 11

Interventions Management gives direction on the action to take on each of the proposed recommendations by the inspection team. The inspection team then embarks on implementation of the recommendations including but not limited to; 1. Sending letters with Compliance instructions 2. Levying Penalties 3. Re-inspecting after the datelines. 2/23/2014 8:15 AM 12

Common Concerns and Areas of Regulatory interventions: Market and Regulatory trends in ICT. Connectivity, Openness & Vulnerability Impact on investment /investors. Effective regulation stimulus plan. Co-existance of traditional and IP Interconnection. Tarrifs, termination rates. Consumer protection 2/23/2014 8:15 AM 13

2/23/2014 8:15 AM 14 Final Reports These are filed in the inspection reports file and also kept in soft copy. Each case stays as an open case until follow-ups on compliance are finalized. Future inspections are pegged on the basis filed and any new developments.

Field work Nairobi, Kenya, 26 – 27 July

MONITORING TOOLS The Commission uses the following tools: 1. QSMS - QVOICE SYSTEM 2. RAHAM – Radaition Hazard Metre 3. Spectrum Analyzer – FSH 18 2/23/2014 8:15 AM 16

QVOICE CELLULAR MOBILE QUALITY OF SERVICE MONITORING SYSTEM (QSMS) - FOR GSM/WCDMA) VOICE DATA SMS 2/23/2014 8:15 AM 17

2/23/2014 8:15 AM 18 Objectives Independently verify mobile QoS offered by operators Determine QoS/QoE in specific geographical areas and days Determine QoS from a users perspective Provide for consumer protection mechanism.

2/23/2014 8:15 AM 19 Qvoice System Consists of three modules; QVoice Mobile –(Vehicle mounted), QVoice Mobile –Portable or back pack QVoice Stationary (QVS, simulates PSTN/ISDN lines) Qvoice Post processing units

2/23/2014 8:15 AM 20 Qvoice Architecture LAN Network License user Server Client-1 Vehicle Mounted Portable Stationary

2/23/2014 8:15 AM 21 Call Configurations Three modes of call configurations can be achieved 1. Mobile – Mobile (QVM-QVP) 2. Mobile - fixed (QVM/P-QVS) 3. Fixed – Mobile (QVS-QVM/P) Four networks simultaneously 2 1 3

PARAMETRS MEASURED Speech Quality Call Block rate Call completion rate Call drop rate Call set up time Signal strength Handover Data transfer speeds. SMS Delivery 2/23/2014 8:15 AM 22

23 2/23/2014 8:15 AM 23 Sample Field Screen (B)

Post Processing Zone 2/23/2014 8:15 AM 24

DATA ON KENYA MAP Nairobi, Kenya, 26 – 27 July

DATA ON SATELLITE IMAGE Nairobi, Kenya, 26 – 27 July

2/23/2014 8:15 AM 27 Mapped Speech Quality

2/23/2014 8:15 AM 28 Reports Automatic reports on selected parameters. Technical reports on network conditions Measurement routes on digital maps Management reports for direct evaluation of network performance for each operator.

2/23/2014 8:15 AM 29 Sample Statistics

2/23/2014 8:15 AM 30 Benefits of Qvoice Sustained Consumer protection mechanism. Verification of Compliance return. Available information for Public Disclosure. Easy complaint resolution mechanism.

Interventions: The Commission has adopted the following. Inspections Public Consultations Issuance of Compliance notices Levying penalties License revocation Embargos Nairobi, Kenya, 26 – 27 July

OTHER AREAS OF QUALITY MONITORING AND MEASUREMENT Nairobi, Kenya, 26 – 27 July

Non Ionising Radiation Measurements - NIR Measuring EMF Radiation levels from Communication installations countrywide. The aim is to ascertain human safety, health and environmental welfare. Done by Random sampling of masts and antenna installations. 2/23/2014 8:15 AM 33

Measurements Tools The Commission has two units for NIR exercise: 1. Radiation Hazard Metre – RAHAM 2. Spectrum Analyzer – FSH 18 2/23/2014 8:15 AM 34

Raham - (Radiation Hazard Metre) 2/23/2014 8:15 AM 35

Raham main frame and probes 2/23/2014 8:15 AM 36

Spectrum Analyzer (Main Frame) 2/23/2014 8:15 AM 37

Spectrum Analyzer (Mounted A) 2/23/2014 8:15 AM 38

Results Data collected is analysed using specialised software and the reports are automatically generated. The results are compared with WHO & ICNIRP Thresholds to determine site Compliance & Non Compliance. 2/23/2014 8:15 AM 39

2/23/2014 8:15 AM 40 Thank you!