ATU-ITU|TATU-ITU|T Preparing for WTSA Issues on SG Structure Gary Fishman ITU-T TSAG Chairman Preparatory Meeting for Africa for WTSA-04 Victoria Falls,

Slides:



Advertisements
Similar presentations
Business Transaction Management Software for Application Coordination 1 Business Processes and Coordination.
Advertisements

GSC: Standardization Advancing Global Communications Home Networking in ITU-T An overview of the Home Networking studies in ITU-T and of the Joint Co-ordination.
GSC: Standardization Advancing Global Communications ITU-T Status Report on standardization of Networked RFID P.A. Probst/Chairman of ITU-T SG16 SOURCE:ITU-T.
GSC: Standardization Advancing Global Communications 1 ITU-T Status Report on Disaster Relief and Early warning SOURCE:ITU-T TITLE:ITU-T Status Report.
INTERNATIONAL TELECOMMUNICATION UNION Document 27 – E TELECOMMUNICATION STANDARDIZATION SECTOR TSB Directors Consultation Meeting on IPTV standardization.
International Telecommuniction Regulations 1 WG-ITR Council Working Group on ITRs General Overview Alaa M. Fahmy Chairman.
Thema: Menü Ansicht, Master, Folien-Master 1 ITU - IP Telephony Workshop June Standards for IP-telephony P.A.Probst, External Relations Swisscom.
ATU-ITU|TATU-ITU|T Preparing for WTSA Major Issues Related to Work Programme Gary Fishman ITU-T TSAG Chairman Preparatory Meeting for Africa for WTSA-04.
Geneva 9-11 Dec 2002ITU Workshop on Satellites in IP and Multimedia 1 IP over Satellite: Standardization activities in ETSI/TC-SES ITU Workshop on Satellites.
ATU-ITU|TATU-ITU|T Preparing for WTSA Major Issues Related to Working Methods Gary Fishman ITU-T TSAG Chairman Preparatory Meeting for Africa for WTSA-04.
Summary of Results Study Period ITU-T Study Group 3 Tariff and accounting principles including related telecommunication economic and policy.
Contact: African Region Involvement in ITU-T Activities and Africa’s Participation in WTSA 12 Raynold C. Mfungahema Contact:
Information Document 20-E ITU-T Study Group 2 March 2003 QUESTION:ALL SOURCE:TSB TITLE:NGN activities in ITU-T (by Y-H. Choe, Engineer, ITU-T SG4)
International Telecommunication Union Preparatory Meeting of African Countries for WTSA-04 Victoria Falls, Zimbabwe, June 2004 Numbering, naming,
WTSA-04 issues for Developing Countries Saburo TANAKA WTSA preparatory meeting for Africa, Victoria Falls, June 2004 The views expressed in this presentation.
International Telecommunication Union Workshop on Standardization in E-health Geneva, May 2003 Basic requiremenst to Quality of Service (IP centric)
International Telecommunication Union TSAG Newbie Session, July 2004 TSAG Newbie Session TSAG Chairman
ITU and Standards Arthur Levin Chief, Operations and Planning
Committed to connecting the world Major issues related to work programme and working methods of ITU-T Africa Regional Preparatory Meeting for WTSA-12 Durban,
Committed to connecting the world Major issues related to working methods of ITU-T WTSA-12 Regional Preparatory Meeting Tashkent, Uzbekistan 3 April 2012.
International Telecommunication Union ITU-T Seminar – Madrid, December 2002 Main standardization areas Gary Fishman ITU-T Telecommunication Standardization.
Fostering worldwide interoperabilityGeneva, July 2009 Home Networking in ITU-T Global Standards Collaboration (GSC) 14 DOCUMENT #:GSC14-GTSC-022.
International Telecommunication Union ITU-T Seminar – Lisbon, 25 June 2002 ITU-T Activities Greg Jones ITU Telecommunication Standardization Sector (ITU-T)
ITU-T Study Group 13 Structure and Responsibilities Brian Moore Study Group 13 Chairman Lucent Technologies.
ITU-T ITU-T Standardization Areas Tatiana Kurakova, Telecommunication Standardization Sector Engineer 7 October 2003, Tashkent.
ITU-T Workshop on Security : ITU-T Special Study Group on IMT-2000 and Beyond John VisserKrishna Sirohi ChairmanVice-Chairman SSG IMT-2000 and Beyond Tel
International Telecommunication Union ITU-T Seminar – Lisbon, 25 June 2002 ITU-T Activities on Security Greg Jones ITU Telecommunication Standardization.
ITU-D STUDY GROUPS A unique and neutral worldwide Forum where developed and developing countries meet to study through Questions matters of priority to.
Joint ITU/ECA Regional Workshop on Information and Communication Technologies (ICT) Indicators Gaborone, Botswana October 2004
19/04/2001 Abossé AKUE-KPAKPO TOGO TELECOM 1 Abossé AKUE-KPAKPO Telecommunication Manager Chief, Internet and Business Services Division Tel. : (228) 21.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
0 - 0.
Addition Facts
Around the World AdditionSubtraction MultiplicationDivision AdditionSubtraction MultiplicationDivision.
BT Wholesale October Creating your own telephone network WHOLESALE CALLS LINE ASSOCIATED.
1 Quality of Service Issues Network design and security Lecture 12.
IP Multicast Information management 2 Groep T Leuven – Information department 2/14 Agenda •Why IP Multicast ? •Multicast fundamentals •Intradomain.
Omniran wsdn 1 ITU-T Joint Coordination Activity on Software Defined Networking Max Riegel Nokia Networks.
Committed to connecting the world Overview of ITU-T Study Group 5 “Environment and Climate Change” Ahmed ZEDDAM France Telecom Orange Chairman, ITU-T Study.
ITU Activities on Bridging the Standardization Gap (BSG) ITU Regional Standardization Forum for Africa (Kampala, Uganda, June 2014) Vijay Mauree,
Maputo, Mozambique, April 2014 Standardization activities on optical access transport systems in ITU-T SG15 Hiroshi OTA Study Group Engineer, ITU/TSB.
Maputo, Mozambique, April 2014 ITU Activities on Bridging the Standardization Gap (BSG) Hiroshi OTA Study Group Engineer, ITU/TSB
ACMA/ITU INTERNATIONAL TRAINING PROGRAM 2006 Dr Bob Horton 8 September 2006.
Adding Up In Chunks.
SIMOCODE-DP Software.
Addition 1’s to 20.
25 seconds left…...
Week 1.
We will resume in: 25 Minutes.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
PSSA Preparation.
GSC-8024 SOURCE:TSACC TITLE:ITU-T Study Group Restructuring AGENDA ITEM:GTSC 11 07/09/2015 ITU-T Study Group Restructuring J. MacFie Tel
International Telecommunication Union eInfrastructures Open Workshop (Internet & Grids), 15 April 2004) What ITU-T can do for GRIDs – or ITU-T in an 8-minute.
International Telecommunication Union Preparation for WTSA-08 Malcolm Johnson Director, TSB International Telecommunication Union ASTAP March 2007.
International Telecommunication Union Eighth Global Standards Collaboration (GSC) Meeting - Ottawa, Canada, 27 April-1 May 2003 Security Standardization.
1 International Telecommunication Union ITU CHALLENGES AND RESPONSES (Fabio Bigi – TSB Deputy Director) (
International Telecommunication Union Accra, Ghana, June 2009 AN AFRICAN VIEW ON THE OUTCOMES OF WTSA-08 Joshua Peprah Director, Regulatory Administration,
Mr. Cleveland Thomas Vice Chairman Working Party 2/3 Study Group 3 ITU-T.
World Telecommunication Standardization Assembly (WTSA-08) DOCUMENT #:GSC13-GTSC6-10 FOR:Presentation SOURCE:ITU AGENDA ITEM:GTSC, 8.1 CONTACT(S):Malcolm.
World Telecommunication Standardization Assembly (WTSA-08) DOCUMENT #:GSC13-XXXX-nn FOR:Presentation or Information SOURCE:ITU AGENDA ITEM:GTSC, 8.1 CONTACT(S):Malcolm.
International Telecommunication Union 5th Annual Meeting for Telecom Development Beirut, May 2003 ITU-T standardization directions Greg Jones ITU.
Inter-American Telecommunication Commission
Inter-American Telecommunication Commission
14th CJK NGN-WG (Status of New SG 13) Chae Sub Lee
ITU Telecommunication Standardization Sector (ITU-T)
Independent Telecommunications Consultant
ITU-T Products & Services
The ITU-T and the Action Line C2 - WSIS
COMMITTEE 4 ITU-T Structure: Points of agreement and
Presentation transcript:

ATU-ITU|TATU-ITU|T Preparing for WTSA Issues on SG Structure Gary Fishman ITU-T TSAG Chairman Preparatory Meeting for Africa for WTSA-04 Victoria Falls, June 2004

ATU-ITU|TATU-ITU|T WTSA Preparatory Group for Africa Victoria Falls June What work should be done in ITU-T? How should this work be organized? What are the objectives for restructuring the Study Groups (SGs)? How will SG structure stay relevant? What is the issue?

ATU-ITU|TATU-ITU|T WTSA Preparatory Group for Africa Victoria Falls June TSAG examined the work of all the SGs and work for the future Identified about 40 Blocks of work that should be treated as indivisible units. For example: Block 3A: tariff & accounting principles Block 5A: EMI Block 13B: architecture, interworking and multi-protocol networks except Ethernet What work should be done in ITU-T?

ATU-ITU|TATU-ITU|T WTSA Preparatory Group for Africa Victoria Falls June How should this work be organized? Related Blocks are being associated into about Functional Groupings. For example: Related Blocks are being associated into about Functional Groupings. For example: Performance FG = Block 12A (all of SG12) + Block 13A (WP4/13) Performance FG = Block 12A (all of SG12) + Block 13A (WP4/13) EMI = Block 5A (all of SG5) EMI = Block 5A (all of SG5)

ATU-ITU|TATU-ITU|T WTSA Preparatory Group for Africa Victoria Falls June What are the objectives for restructuring the SGs Efficiency, relevance, clear mandates Efficiency, relevance, clear mandates Visibility to outside world Visibility to outside world Many different views and objectives have been introduced by the membership Many different views and objectives have been introduced by the membership See recent report on restructuring work in TSAG TD/340 Rev.1 See recent report on restructuring work in TSAG TD/340 Rev.1

ATU-ITU|TATU-ITU|T WTSA Preparatory Group for Africa Victoria Falls June ITU-T should have a strong presence in certain areas Critical areas for future work must include: Next Generation Network (NGN) Security Mobility E-Everything Network infrastructure: Optical Transport, IP- based Networks, Network Management, Signalling, Performance, EMC, Architecture, Interoperability, etc.

ATU-ITU|TATU-ITU|T WTSA Preparatory Group for Africa Victoria Falls June What seems to be nearly agreed? Continue the SG as is Continue the SG as is SG3 – Tariff and accounting principles SG3 – Tariff and accounting principles SG5 – Electromagnetic compatibility SG5 – Electromagnetic compatibility SG6 – Outside plant SG6 – Outside plant

ATU-ITU|TATU-ITU|T WTSA Preparatory Group for Africa Victoria Falls June What seems to be nearly agreed? Core work of a SG to continue, with possible additions Core work of a SG to continue, with possible additions SG4 – Network management SG4 – Network management SG12 – End-to-end performance SG12 – End-to-end performance SG15 – Transmission systems SG15 – Transmission systems SG16 – Multimedia SG16 – Multimedia

ATU-ITU|TATU-ITU|T WTSA Preparatory Group for Africa Victoria Falls June What seems to be nearly agreed? Other SGs that are being treated as Blocks Other SGs that are being treated as Blocks SG11 – Signalling SG11 – Signalling SSG – IMT-2000 and beyond SSG – IMT-2000 and beyond

ATU-ITU|TATU-ITU|T WTSA Preparatory Group for Africa Victoria Falls June Trends in Functional Groupings Consolidate Network Operations: combine WP2/2 and Network Management (SG4) Consolidate Network Operations: combine WP2/2 and Network Management (SG4) Consolidate Performance: combine WP4/13 and SG12 Consolidate Performance: combine WP4/13 and SG12 Build an NGN SG: discussion continues on what and how much to include Build an NGN SG: discussion continues on what and how much to include Build a Security SG Build a Security SG

ATU-ITU|TATU-ITU|T WTSA Preparatory Group for Africa Victoria Falls June BUT – to make it interesting Two approaches: Change for change sake vs. If it aint broke, dont fix it Two approaches: Change for change sake vs. If it aint broke, dont fix it Balance between: massive consolidation into a few large Study Groups vs. Study Groups based on specific topics and expertise Balance between: massive consolidation into a few large Study Groups vs. Study Groups based on specific topics and expertise

ATU-ITU|TATU-ITU|T WTSA Preparatory Group for Africa Victoria Falls June Some issues to be resolved Numbering, Naming, Addressing, Routing: Block 2A (mostly the current WP1/2) – where to place? Numbering, Naming, Addressing, Routing: Block 2A (mostly the current WP1/2) – where to place? Keep Cable Broadcast together (SG9), make small modifications or split it up completely? Keep Cable Broadcast together (SG9), make small modifications or split it up completely? Signalling – a SG or part of another SG? Signalling – a SG or part of another SG? Keep a Mobility SG (SSG) or merge with other work? Keep a Mobility SG (SSG) or merge with other work?

ATU-ITU|TATU-ITU|T WTSA Preparatory Group for Africa Victoria Falls June Some issues to be resolved What goes into the NGN Study Group? What goes into the NGN Study Group? What goes into the Security Study Group? What goes into the Security Study Group? Numerous details of work allocation among 150+ study questions Numerous details of work allocation among 150+ study questions

ATU-ITU|TATU-ITU|T WTSA Preparatory Group for Africa Victoria Falls June Considerations Some consolidation of work will help Some consolidation of work will help Avoid divergent solutions Avoid divergent solutions Share time of experts among study items Share time of experts among study items Reduce need for liaisons Reduce need for liaisons Too much consolidation of work will hurt Too much consolidation of work will hurt Less time per study item during meeting Less time per study item during meeting Parallel meetings cannot be covered by experts Parallel meetings cannot be covered by experts External liaison relationships become less clear External liaison relationships become less clear

ATU-ITU|TATU-ITU|T WTSA Preparatory Group for Africa Victoria Falls June Consequences...or Why do we care? Make ITU-T THE most attractive place to do international standards Make ITU-T THE most attractive place to do international standards Make best use of experts time and resources Make best use of experts time and resources Avoid duplication and overlap of work Avoid duplication and overlap of work Lower costs to membership and to ITU Lower costs to membership and to ITU A bad structure will slow down or stop work; a good structure can speed up work A bad structure will slow down or stop work; a good structure can speed up work

ATU-ITU|TATU-ITU|T WTSA Preparatory Group for Africa Victoria Falls June Maintaining Future Relevance TSAG is responsible to review progress of the work programme, the allocation of work among ITU-T SGs and between ITU-T and ITU-R TSAG is responsible to review progress of the work programme, the allocation of work among ITU-T SGs and between ITU-T and ITU-R WTSA Resolution 22 gives TSAG authority to change study group structure between WTSAs and to create groups with short life- times WTSA Resolution 22 gives TSAG authority to change study group structure between WTSAs and to create groups with short life- times

ATU-ITU|TATU-ITU|T WTSA Preparatory Group for Africa Victoria Falls June Background Information

ATU-ITU|TATU-ITU|T WTSA Preparatory Group for Africa Victoria Falls June ITU-T Study Groups SG2:Operational aspects of service provision, networks and performance SG3:Tariff and accounting principles including related telecommunications economic and policy issues SG4:Telecommunication management, including TMN SG5:Protection against electromagnetic environment effects SG6:Outside plant SG9:Integrated broadband cable networks and television and sound transmission SG11:Signalling requirements and protocols SG12:End-to-end transmission performance of networks and terminals SG13:Multi-protocol and IP-based networks and their internetworking SG15:Optical and other transport networks SG16:Multimedia services, systems and terminals SG17:Data networks and telecommunication software SSG:IMT-2000 and Beyond

ATU-ITU|TATU-ITU|T WTSA Preparatory Group for Africa Victoria Falls June Contacts SG Restructuring Mr. Jacques Boulvin (France Telecom) Chairman TSAG WP2 (Work Programme) Tel: Fax: General TSAG Matters Mr. Gary Fishman (Lucent Technologies) Chairman TSAG Tel: Fax: