Moriond 2003M. Benedikt, S. Hancock Injection and Accumulation in a High Energy Ion Storage Ring Michael Benedikt, Steven Hancock AB Division, CERN.

Slides:



Advertisements
Similar presentations
Mats Lindroos Will we ever do a beta-beam design study beyond the present CERN-Frejus baseline? Mats Lindroos.
Advertisements

RAL 27 April 2006The beta-beam task, EURISOL1 Status of the beta-beam study Mats Lindroos on behalf of the EURISOL beta-beam task.
Proton / Muon Bunch Numbers, Repetition Rate, RF and Kicker Systems and Inductive Wall Fields for the Rings of a Neutrino Factory G H Rees, RAL.
Ion Accelerator Complex for MEIC January 28, 2010.
NNN05, 8/4/05 1 A BASELINE BETA-BEAM Mats Lindroos AB Department, CERN on behalf of the Beta-beam Study Group
Osaka, 25/07/04NuFACT’04 - Beta Beam R&DM. Benedikt 1 BETA-BEAM R&D in EUROPE Michael Benedikt AB Department, CERN on behalf of the Beta-Beam Study Group.
Thomas Roser Muon collaboration meeting February 8-10, 2002 AGS beam intensity upgrades What has been achieved Sextupole power supply upgrades Bunch manipulation.
Paul Derwent 30 Nov 00 1 The Fermilab Accelerator Complex o Series of presentations  Overview of FNAL Accelerator Complex  Antiprotons: Stochastic Cooling.
(ISS) Topics Studied at RAL G H Rees, RAL, UK. ISS Work Areas 1. Bunch train patterns for the acceleration and storage of μ ± beams. 2. A 50Hz, 1.2 MW,
Loss problems associated with the acceleration of radioactive beams and what we can do about it A.Jansson f fermilab Loss issues (and ideas for solutions)
3 GeV,1.2 MW, Booster for Proton Driver G H Rees, RAL.
First measurements of longitudinal impedance and single-bunch effects in LHC E. Shaposhnikova for BE/RF Thanks: P. Baudrenghien, A. Butterworth, T. Bohl,
Proton Driver: Status and Plans C.R. Prior ASTeC Intense Beams Group, Rutherford Appleton Laboratory.
1 Muon Acceleration and FFAG II Shinji Machida CCLRC/RAL/ASTeC NuFact06 Summer School August 20-21, 2006.
NUFACT05 1 A BASELINE BETA-BEAM Mats Lindroos AB Department, CERN on behalf of the EURISOL Beta-beam task
Synchronization Andrew Hutton Slava Derbenev Yuhong Zhang.
R.G. 7/09/20101 Options for neutrinos. R.G. 7/09/20102 Conventional beam from the SPS (1/3) Neutrinos using the SPS Nominal CNGS 732 km baseline from.
0 1 Alternative Options in the Injectors – Preliminary Summary H. Damerau LIU-TM#8 18 October 2013 Many thanks for discussions and input to T. Argyropoulos,
Electron Model for a 3-10 GeV, NFFAG Proton Driver G H Rees, RAL.
BEAM TRANSFER CHANNELS, BEAM TRANSFER CHANNELS, INJECTION AND EXTRACTION SYSTEMS OF NICA ACCELERATOR COMPLEX Tuzikov A., JINR, Dubna, Russia.
Andreas Jansson, Neutrino Workshop, ANL, March 3-4, 2004 Possible beta beam scenario(s) in the US Andreas Jansson Fermilab.
NuFact'06 WG3, Aug. 2006A. Fabich, CERNBeta-beam Ion Losses, 1 The EURISOL Beta-beam Acceleration Scenario: Ion Losses A. Fabich, CERN NuFact’06, UCIrvine.
The SPS as a Damping Ring Test Facility for CLIC March 6 th, 2013 Yannis PAPAPHILIPPOU CERN CLIC Collaboration Working meeting.
CERN, 15/03/05EURISOL - Beta Beam Task1 EURISOL and the Beta-Beam Task Status and Planning Michael Benedikt Mats Lindroos AB-Department, CERN.
J. Bouchez CEA/DAPNIA NuFact 03 June 5,2003 BETA BEAMS : design update and physics reach Physics motivation Recent progress on design Expected performances.
Synchronization Issues in MEIC Andrew Hutton, Slava Derbenev and Yuhong Zhang MEIC Ion Complex Design Mini-Workshop Jan. 27 & 28, 2011.
The Introduction to CSNS Accelerators Oct. 5, 2010 Sheng Wang AP group, Accelerator Centre,IHEP, CAS.
Lecture17(Course Summary).PPT - E. Wilson - 3/3/ Slide 1 COURSE SUMMARY A Design Study of a Compressor ring for A Neutrino Factory MT 2009 E. J.
Robert R. Wilson Prize Talk John Peoples April APS Meeting: February 14,
LER Workshop, Oct 11, 2006Intensity Increase in the LER – T. Sen1 LHC Accelerator Research Program bnl-fnal-lbnl-slac  Motivation  Slip stacking in the.
Pushing the space charge limit in the CERN LHC injectors H. Bartosik for the CERN space charge team with contributions from S. Gilardoni, A. Huschauer,
Longitudinal Painting S. Hancock p.p. G. Feldbauer.
F Project X: Recycler 8.9 GeV/c Extraction D. Johnson, E. Prebys, M. Martens, J. Johnstone Fermilab Accelerator Advisory Committee August 8, 2007 D. Johnson.
Parameter scan for the CLIC damping rings July 23rd, 2008 Y. Papaphilippou Thanks to H. Braun, M. Korostelev and D. Schulte.
Longitudinal aspects on injection and acceleration for HP-PS Antoine LACHAIZE On behalf of the HP-PS design team.
ELENA RF Manipulations S. Hancock. Apart from debunching before and rebunching after cooling, the principal role of the rf is to decelerate the beam and.
Summary of ions measurements in 2015 and priorities for 2016 studies E. Shaposhnikova 3/02/2016 Based on input from H. Bartosik, T. Bohl, B. Goddard, V.
Optics considerations for PS2 October 4 th, 2007 CARE-HHH-APD BEAM’07 W. Bartmann, M. Benedikt, C. Carli, B. Goddard, S. Hancock, J.M. Jowett, A. Koschik,
Update on RF parameters A.Lachaize11 th HPPS design meeting04/09/13.
HP-PS beam acceleration and machine circumference A.LachaizeLAGUNA-LBNO General meeting Paris 18/09/13 On behalf of HP-PS design team.
Orsay, 03/Feb/05EURISOL - Beta Beam TaskM. Benedikt 1 The Beta-Beam Task Status and Planning 02/2005 to 01/2006 Michael Benedikt AB-Department, CERN.
Investigation of Injection Schemes for SLS 2.0
BEAM TRANSFER CHANNELS, INJECTION AND EXTRACTION SYSTEMS
A.Lachaize CNRS/IN2P3 IPN Orsay
A BASELINE BETA-BEAM Mats Lindroos AB Department, CERN
Alternative/complementary Possibilities
Alternative/complementary Possibilities
Electron Cooling Simulation For JLEIC
Large Booster and Collider Ring
Status of the beta-beam study
Multiturn extraction for PS2
CASA Collider Design Review Retreat Other Electron-Ion Colliders: eRHIC, ENC & LHeC Yuhong Zhang February 24, 2010.
The EURISOL Beta-beam Steven Hancock
Collimation for beta-beams
Progress towards Pulsed Multi-MW CERN Proton Drivers
LHC (SSC) Byung Yunn CASA.
ELENA Extra Low ENergy Antiproton Ring
Collider Ring Optics & Related Issues
A Design Study of a Compressor ring for
Status of the BETA-BEAM Task within the EURISOL Design Study
Negative Momentum Compaction lattice options for PS2
Joint session – Beta-beams
Kicker and RF systems for Damping Rings
Injection design of CEPC
JLEIC ion fullsize booster (2256m) space charge limit (Δν=0
Update on ERL Cooler Design Studies
JLEIC 200 GeV ion beam formation options
HE-JLEIC: Do We Have a Baseline?
Updated MEIC Ion Beam Formation Scheme
JLEIC Ion Beam Formation options for 200 GeV
Presentation transcript:

Moriond 2003M. Benedikt, S. Hancock Injection and Accumulation in a High Energy Ion Storage Ring Michael Benedikt, Steven Hancock AB Division, CERN

Moriond 2003M. Benedikt, S. Hancock Beta Beam Accelerator Complex Neutrino Source Decay Ring Ion production ISOL target & Ion source Proton Driver SPL Decay ring B  = 1500 Tm B = 5 T C = 7000 m L ss = 2500 m 6 He:  = Ne:  = 60 SPS Bunching and acceleration to medium energy Cyclotrons Storage ring and RCS PS Acceleration to final energy PS & SPS Experiment

Moriond 2003M. Benedikt, S. Hancock Desired beam parameters in the decay ring 6 Helium 2+ –Intensity: 1.0x10 14 ions –Energy: 139 GeV/u –Rel. gamma: 150 –Rigidity: 1500 Tm 18 Neon 10+ –Intensity: 4.5x10 12 ions –Energy: 55 GeV/u –Rel. gamma: 60 –Rigidity: 335 Tm The neutrino beam at the experiment will have the “time stamp” of the circulating beam in the decay ring. We need to concentrate the beam in as few and as short bunches as possible to maximize the number of ions/nanosecond. (background suppression) Clearly 6 He is the more demanding ion and considered further on.

Moriond 2003M. Benedikt, S. Hancock What can we get from the injector chain Overall cycling time of the injector chain is determined by the SPS to about 8 seconds. Number of ions per bunch at SPS injection is limited by space charge effects (we should have many bunches….). Baseline scenario foresees 8 bunches arranged in 2 trains of 4 bunches on opposite sides in the SPS. 6 Helium 2+ at SPS ejection energy –Intensity: 8 bunches of 1.2x10 12 ions –Tr. emit: 0.6  m (geometrical) –Longit. emit: ~1 eVs –Bunch length: ~1 ns Though optimistic, the number of ions per batch (8 bunches) is a factor 10 below what is needed in the decay ring!

Moriond 2003M. Benedikt, S. Hancock SPS SPS as injector 2 x 4 bunches injected from the PS. Transverse blow-up before transfer and additional 40 MHz rf system to increase bunch length to reduce space charge effects. PS SPS PS Bunch spacing: 0.25  s Train distance:  s

Moriond 2003M. Benedikt, S. Hancock Stacking in the decay ring There is an absolute need for stacking in the decay ring. –Not enough flux from source and injection chain. –Life time is an order of magnitude larger than injector cycling (120 s as compared to 8s). –We need to stack at least over 10 to 15 injector cycles. Cooling is not an option for the stacking process: –Electron cooling is excluded because of the high electron beam energy and in any case far too long cooling times. –Stochastic cooling is excluded by the high bunch intensities. Stacking without cooling creates “conflicts” with Liouville.

Moriond 2003M. Benedikt, S. Hancock Asymmetric bunch pair merging Try to cheat Liouville macroscopically by: –Stacking longitudinally in the centre of the existing beam. –Using the fact that “older” parts of the stack are naturally loosing density because of beta decay. Asymmetric bunch pair merging moves the fresh bunch into the centre of the stack and pushes less dense phase space areas to larger amplitudes until these are cut by the momentum collimation system. The maximum density is always in the centre of the stack as required by the experiment.

Moriond 2003M. Benedikt, S. Hancock Requirements for asymmetric merging Dual harmonic RF systems: –Decay ring will be equipped with 40 and 80 MHz system. –Gives required bunch lengths of < 10 ns for physics. Stack and fresh bunch need to be positioned in adjacent “buckets” of the dual harmonic system (12.5 ns distance!) Adjustment of phase and voltage ratios allows merging.

Moriond 2003M. Benedikt, S. Hancock Asymmetric bunch merging (SPS model)

Moriond 2003M. Benedikt, S. Hancock Full scale simulation with SPS as model Simulation conditions: –Single bunch after injection and ¼ turn rotation. –Stacking again and again until steady state is reached. –Each repetition, a part of the stack (corresponding to  -decay) is removed. Results: –Steady state intensity was ~85 % of theoretical value (for 100% effective merging). –Final stack intensity is ~10 times the bunch intensity (~15 effective mergings). –Moderate voltage of 10 MV is sufficient for 40 and 80 MHz systems for an incoming bunch of < 1 eVs.

Moriond 2003M. Benedikt, S. Hancock Injection into the decay ring Bunch merging requires fresh bunch to be injected at ~10 ns from stack! –Conventional injection with fast elements is excluded. Off-momentum injection on a matched dispersion trajectory. Rotate the fresh bunch in longitudinal phase space by ¼ turn into starting configuration for bunch merging. –Relaxed time requirements on injection elements: fast bump brings the orbit close to injection septum, after injection the bump has to collapse within 1 turn in the decay ring (~20  s). –Maximum flexibility for adjusting the relative distance bunch to stack on ns time scale.

Moriond 2003M. Benedikt, S. Hancock Injection into the decay ring

Moriond 2003M. Benedikt, S. Hancock Horizontal aperture layout Assumed machine and beam parameters: –Dispersion:D hor = 10 m –Beta-function:  hor = 20 √m –Moment. spread stack:  p/p = ±1.0x10 -3 (full) –Moment. spread bunch:  p/p = ± 2.0x10 -4 (full) –Emit. (stack, bunch):  geom = 0.6  m Septum & alignment 10 mm Stack: ± 10mm momentum ± 4 mm emittance Beam: ± 2 mm momentum ± 4 mm emittance Required separation: 30 mm, corresponds to 3x10 -3 off-momentum. Required bump: 22 mm Central orbit undisplaced

Moriond 2003M. Benedikt, S. Hancock SPS Decay ring operation SPS Stack: four bunches, concentrated in ~1/20 of the circumference. Full bunch length for physics: < 10ns. Every 8s four fresh bunches injected off-momentum, phase rotated and merged to stack. Immediately after first merging, the procedure is repeated with second batch of 4 bunches. Total injection and merging time for 2x4 fresh bunches ~1s. Afterwards 7s in physics mode and again injection.

Moriond 2003M. Benedikt, S. Hancock Decay ring design issues Main design issues: –Superconducting for high bending field (~5T) to have large useful straight section. –Low transition gamma for high synchrotron frequency and fast merging. –Special insertion for off-momentum injection (large normalized dispersion D/√  ). –Sophisticated collimation system for loss protection and momentum collimation.

Moriond 2003M. Benedikt, S. Hancock Acknowledgements We would like to especially thank all our colleagues in the “beta beam study group” for their support and helpful discussion. Conclusions Asymmetric bunch merging is a promising method for stacking beams of radioactive ions. Simulations give excellent results, an experimental proof of principle is under way. For a beta beam decay ring, an off-momentum injection with bunch merging seems at present the favorable injection an stacking scenario.