Additionality - Module 2.1 Challenges of the new Additionality Tool 6.0 and related questions 24 th March 2012 Dr. Sven Kolmetz Executive Committee Member,

Slides:



Advertisements
Similar presentations
Assessment II. 2 The Research Cycle Formulation Generate Hypothesis/Questions Model Design Research Collect Data Sell Solution Assess Reliability/Validity.
Advertisements

The Western Electricity Coordinating Council Document Categorization Project Steve Ashbaker February 19, 2009 RPIC Meeting – February 19, 2009.
REGIONAL ENERGY MARKET IN SOUTH EAST EUROPE (REM) GRID CODE 3 rd Athens Forum October 24&25 Philippe RUSSE (EDF) Christian LAUNAY (EDF)33.
| | Learning from EuroHealthNets Health Inequalities Projects.
CONOR BARRY, Team Lead OSD UNFCCC Secretariat SDM programme Setting expectations of the workshop Bonn, 7- 8 May 2011 Workshop on Programme of Activities.
Presented by: Lex de Jonge Vice-Chair CDM Executive Board Clean Development Mechanism EB perspective on recent developments, with a focus on Registration.
Global GHG Market Update Daniele Violetti Team Leader Registration and Issuance Unit Sustainable Development Mechanisms Programme UNFCCC Carbon Forum America.
SDM programme, UNFCCC secretariat Kishor Rajhansa, Programme Officer STATUS AND WAY FORWARD ON STANDARDIZED BASELINES UNFCCC Joint coordination Workshop.
JI Governance – review of JI Guidelines
A Project Developers view on lessons learned and challenges with PoAs (module 2.2) 24 March 2012 Mischa Classen Executive Committee, Project Developer.
Key recent developments in the CDM and JI Joint Coordination Workshop Bonn, Germany, March 2012 Andrew Howard, UNFCCC secretariat.
The CDM Policy Dialogue Margaret Mukahanana-Sangarwe Member, High-level Panel on the CDM Policy Dialogue FIRST SDM JOINT COORDINATION WORKSHOP Bonn, Germany,
GUIDELINES ON: (A) COMMON PRACTICE (B) ADDITIONALITY OF FIRST-OF-ITS KIND SDM JOINT COORDINATION WORKSHOP Bonn, Germany, March 2012.
UNFCCC, SDM/Standard Setting Unit Janak Shrestha, Programme Officer Current Status- Extension of simplified modalities for demonstration of additionality.
Wrap-up session for Module 2.1 (Additionality) Presenters: UNFCCC secretariat, MP member, PD Forum, and TÜV SÜD 1 st Sustainable Development Mechanisms.
Wrap-up session : Global and Local Stakeholder Consultation Process 1 st Sustainable Development Mechanisms Joint Coordination Workshop Maritim Hotel Bonn.
Recent Improvements of the mechanisms 24 th March 2012 Susanne Häfeli-Hestvik Member of the PD-Forums Executive Committee VP, Director Technical Department,
Validation and verification report templates
Wrap-up session 1 st Sustainable Development Mechanisms Joint Coordination Workshop Maritim Hotel Bonn Germany, March 2012.
A Project Developers view for post 2012 carbon market (Plenary IV) 25 March 2012 Mischa Classen Executive Committee, Project Developer Forum First Climate.
Wrap-up session IV Module 4.1, Extension of simplified modalities for demonstration of additionality Mr. Peer Stiansen, CDM EB member 1 st Sustainable.
Validation and Verification Report Templates 25 th March 2012 Susanne Häfeli-Hestvik Member of the PD-Forums Executive Committee VP, Director Technical.
UN Climate Change Secretariat, SDM Dhirendra Kumar MODULE 3.1 DIRECT COMMUNICATION ON CASE SPECIFIC ISSUES 1 st SDM Joint Coordination Workshop Bonn, Germany.
Presentation title 1st Sustainable Development Mechanisms Joint Coordination Workshop Module 2.4 Materiality Bonn, Germany, 24–25 March 2012 Marsha Cheddi.
SDM programme, UNFCCC secretariat Wenxin Li, Programme Officer Overview of PoA Standards SDM JOINT COORDINATION WORKSHOP Bonn, Germany, March 2012.
Dhirendra KUMAR UNFCCC Secretariat, Sustainable Development Mechansims Programme New Registration and Issuance Procedures 7 th CDM Joint Coordination Workshop.
UNFCCC secretariat, programme Fleur Newman, Programme Officer Breakout session 4.2 Procedure on significant deficiencies CMP & EB Mandates and 2012 Process.
Maritim Hotel Bonn Germany, March 2012 Wrap-up session I Module Regional Distribution/Nairobi Framework Mr. Giza Martins, Co-Chair of the DNA.
Wrap-up session 1 st Sustainable Development Mechanisms Joint Coordination Workshop Maritim Hotel Bonn Germany, March 2012.
Wrap-up session: Suppressed Demand Gajanana Hegde, UNFCCC Secretariat Carolyn Luce, SSC WG Anja Kollmuss, CDM Watch Steve Thorne, SouthSouthNorth Steve.
SDM programme UNFCCC secretariat Implementation of new procedures, standards, tools and guidelines 1 st Sustainable Development Mechanisms Joint Coordination.
Wrap-up session 1 st Sustainable Development Mechanisms Joint Coordination Workshop Maritim Hotel Bonn Germany, March 2012.
International Telecommunication Union An Insight into BDT Programme 3 Marco Obiso ICT Applications and Cybersecurity Division Telecommunication Development.
Completing the cycle: an investigation of structured reflection as a tool to encourage student engagement with feedback Jackie Pates Lancaster Environment.
Automatic additionality for CDM micro-scale project activities. DNA Help Desks Step-by-step guide for DNA on How to submit a recommendation.
UNEP/DCC – CDM Capacity Building Initiative – Nigeria PDD Capacity Building Workshop Durando Ndongsok S2 Services Bolade Soremekun BAS Consulting.
For(int i = 1; i
Proposals for Verification of A/R Projects Alvaro Vallejo Rama Chandra Reddy Roundtable on Validation and Verification Issues in LULUCF projects Carbon.
Module 1: Introduction and recap M1. M1. Introduction and recap This first workshop covers all the following contents – as per work plan: CDM modalities.
Kendle Implementation of Clinical Data Acquisition Standards Harmonization Dr Elke Sennewald Kendle 9th German CDISC User Group Meeting Berlin, 28 September.
An Introduction to the: Carbon Markets & Investors Association Promoting efficient market solutions to combat climate change A project developer’s.
Overview and Introduction
Satie Airam é Bren School, Assistant Dean for Academic Programs Winter 2012 Group Project Defense Guidelines.
Implementing an ELP in Thuringia, Germany Project C5 of the ECML 2nd medium-term programme (IMPEL)
PRESENTATION TO THE PORTFOLIO COMMITTEE ON AGRICULTURE AND LAND AFFAIRS ON THE LAND USE MANAGEMENT BILL (LUMB) 31 JULY 2008 ______________________________________________________________________________________________________________________.
Portfolios Introduction to Engineering Design
Conclusions Buenos Aires, – December 5 th, 2004 CDM Methodologies and Project Design Workshop for CDM Project Developers.
Introducing Assessment Tools. What is an assessment tool? The instrument/s and procedures used to gather and interpret evidence of competence: –Instrument.
Trademark Fee Cost Analysis TPAC Status Briefing #2 – Public August 28, 2009.
SDOs and Patent Offices : Towards a better interface Dr Michel Goudelis, Director Telecommunications, EPO GSC-14, July 2009 Geneva, Switserland.
Problem?.  Why are we studying it?  Why do some people feel it is a problem?
Portfolio Committee on Environmental Affairs Deidré Penfold Executive Director 22 September 2015.
TÜV SÜD Industrie Service GmbH SEVENTH CDM JOINT COORDINATION WORKSHOP PLENARY SESSION SESSION III Transparency and Promotion of the CDM Thomas Kleiser.
Insert Nonprofit Logo Project Name Final Presentation.
The Role of Designated Operational Entities in the CDM High-Level Roundtable on CDM Reform World Bank Carbon Finance Business Washington, D.C., October.
ITS Meeting Sept 2006 New Developments at the OECD: The Common Processing Application (COPRA) ITS Experts Meeting – September 2006 Trevor Fletcher ITN/CBS.
Energy Security dimension in the EU CSDP: guidelines for the future 12 September 2013 Dr. Aleksandras SPRUOGIS Energy vice-minister, Lithuania 1.
Capacity assessment tool for land policy implementation – Experience from Kenya, Mozambique and Uganda Prof. dr.ir. Walter T. de Vries - TUM / Munich.
Contents Major issue states and transitions Tools.
. Steering Group on Climate Change-Related Statistics Purpose and objective Expert Forum for producers and users of climate change-related statistics 2-3.
IT Steering Committee 6/9/2018 BEGIN - CONTINGENCY.
Strengthening Economic Statistics in Lao PDR
Population Problem?.
ایالات متحده آمریکا ایالات متحده آمریکا United States of America
Absolute Value inequalities
캐나다.
Accredited Standards Committee C63® - EMC
Pathways Take Up Rates Statistics to assist members of the District 90 Executive Committee “Success for Our Members”
Accredited Standards Committee C63® - EMC
The GEOSTAT project Work Package 2 Geostatistics Working Party/Meeting
Presentation transcript:

Additionality - Module 2.1 Challenges of the new Additionality Tool 6.0 and related questions 24 th March 2012 Dr. Sven Kolmetz Executive Committee Member, Project Developer Forum Project Portfolio Manager, Climate Bridge GmbH, Munich

9th September 2009 | 2 NEW COMMON PRACTICE GUIDELINES HAVE UNCLEAR RULES AND THE TIMELINE FOR INTRODUCTION IS NOT CLEAR Problem 1. From when should we apply these new guidelines? Solution 1. The new tool must be used only for projects with GSP after publication of the tool. All other can use the old one up to 25 July The additionality tool supersedes the guideline as the guidelines are incorporated now. Issue New common practice guidelines were introduced at EB63, the new additionality tool at EB65. The timeline of validity has been theoretically clarified by introduction of the new AT version but it is still not clear to all DOE when the new tool must be used. 2.Should we use the whole country as the common practice area (particularly in large countries like China, India etc.) 2.Common practice in large countries can still be considered at the provincial/state level e.g. if different tariff/grid/regulat… justified 3.Is it required to fully investigate the statistics of N all / N diff or is it sufficient to resolve the inequation F<20% = 1- N diff /N all ? 3.E.g. if it can be shown that there is no similar project, N diff =N all and F=0% < 20% q.e.d. and unavailibility of data to be justified

9th September 2009 | 3 MORE UNCLEAR RULES: Problem 1. Do greenfield projects such as new hydro or wind projects have to use this tool? Solution 1. Yes, but to be explicitly clarified by the secretariat. Issue New common practice guidelines introduced at EB63 and incorporated into the new additionality tool at EB65 raise more questions: 2.What is considered to be a significant change in investment climate? 2.(i) Access to technology; (ii) Subsidies or other financial flows; (iii) Promotional policies; (iv) Legal regulation Privatisation, policy change, …?

9th September 2009 | 4 THERE IS UNCERTAINTY ABOUT WHAT HAPPENS REGARDING GAPS IN PRIOR CONSIDERATION DOCUMENTATION Problem 1. If one informs the secretariat on the progress 2 years and 1 day after the first notification even if there is a clear evidence of actions to achieve CDM status such as ERPA or DOE contracts? Solution 1. If clear evidence (ERPAs, DOE contracts) is provided, the EB should accept that continuous action was made, even if a notification was not presented to the EB in time. At least if the letter has been sent in time but received after the deadline. There may be a limit of 1 year exceeding the deadline where exemptions are possible if justified. Issue For project activities for which a PDD has not been published for global stakeholder consultation or a new methodology proposed or request for revision of an approved methodology is requested, every subsequent two years after the initial notification the project participants shall inform the UNFCCC secretariat of the progress of the project activity. Is this rule set in stone, or can it be ignored if other clear evidence of prior consideration is provided

9th September 2009 | 5 HOW CAN WE PROVE THAT CDM FINANCE ALLEVIATES BARRIERS IN CASE OF FOIK Problem 1. If we show that a new technology bears a high technological risk (no financial analysis), which can be cross-checked by the fact there is no such plants in the country operating on commercial basis, is this enough to show that CDM is needed? Or do we still have to demonstrate how CDM helps to overcome the barrier exactly? 2. For other barriers it has to be shown how CDM overcomes the barrier. Solution 1. By the way it is mentioned in the new additionality tool that projects falling under paragraph 6 which apply FOIK as a barrier do not have to show how CDM overcomes this barrier (they also do not have to show that the FOIK barrier would actually prevent the implementation of the project)). 2. This is extremely difficult. Issue For projects that dont use financial analysis, 3a of the additionality tool states: If the CDM does not alleviate the identified barriers that prevent the proposed project activity from occurring, then the project activity is not additional.

9th September 2009 | 6 Thank you for listening The Project Developer Forum (PD-Forum) is a collective voice to represent the interests of companies developing greenhouse gas (GHG) emission reduction projects in international markets under the Clean Development Mechanism (CDM), Joint Implementation (JI) and other carbon emission reduction schemes and programs. See our members at: Project Developer Forum – December 2011