World Meteorological Organization Working together in weather, climate and water Working Together at Regional Level for a better future W. Zhang, D/OBS;

Slides:



Advertisements
Similar presentations
World Meteorological Organization Working together in weather, climate and water WMO OMM WMO Climate & Water Department Side Event I: The Role.
Advertisements

Global Framework for Climate Services 1 World Meteorological Organization Working together in weather, climate and water ER 2:Enhanced Capabilities of.
Regional Association V (South-West Pacific) Fifteenth Session Bali, April/May 2010 Briefing on key WMO issues (Presented by the Secretary-General)
World Meteorological Organization Working together in weather, climate and water Our Planets Future Hub for Weather, Climate & Water Observations --For.
1 World Meteorological Organization WMO Information System (WIS) Managing & Moving Weather, Water and Climate Information in the 21 st Century WORLD METEOROLOGICAL.
XV-RA V/Doc. 5.2(2) Expected Result: 11 EFFECTIVE AND EFFICIENT MANAGEMENT PERFORMANCE AND OVERSIGHT OF THE ORGANIZATION Strategic Plan for the Enhancement.
World Meteorological Organization Working together in weather, climate and water Review of relevant documents to the WMO capacity development activities.
Report by the President of RA I Dr. Lamine BAH Cg – XVI / Doc. 2.4 Geneva, 2011.
World Meteorological Organization Working together in weather, climate and water WMO OMM WMO Monitoring and Evaluation of Capacity Development.
World Meteorological Organization Working together in weather, climate and water WMO OMM WMO GFCS Governance proposal Process of development.
Progress on the WIGOS R-WIP in RA II JIAO Meiyan Representative of RA II China Meteorological Administration.
WMO WIGOS Implementation & (WIP) RA I Sub-Regional Workshops for WIGOS and WIS for West / North Africa Nov 2013 Dr I. Zahumensky, WIGOS-PO.
WMO WMO Integrated Global Observing System (WIGOS) CBS EXPERT TEAM ON AIRCRAFT-BASED OBSERVING SYSTEMS 1st Session (Geneva, September, 2013) Dr I.
Path forward to Cg-17, EC-67 EC-PORS-5, Wellington, Feb.2014
WMO WMO INTEGRATED GLOBAL OBSERVING SYSTEM (WIGOS) REPORT TO EC-66 (Dr S. Barrell, Chair, ICG-WIGOS Prof B. Calpini, Co-chair) WMO; OBS.
WMO WIGOS in support of DRR 2013 Coordination Meeting of DRR FP October 2013, Geneva Dr S. Barrell, Chair, ICG-WIGOS Dr I. Zahumensky, WIGOS-PO.
© World Meteorological Organization World Meteorological Organization Working together in weather, climate and water 2013 COORDINATION MEETING OF DISASTER.
© World Meteorological Organization Recommendations of the First Technical Workshop on Standards for Hazard Monitoring, Database/Metadata and Analysis.
World Meteorological Organization Working together in weather, climate and water Cg-XVI / Doc. 2.4 Geneva, 16 May to 3 June 2011 Report by the President.
World Meteorological Organization Working together in weather, climate and water Pilot Project V Integration of marine meteorological and other appropriate.
World Meteorological Organization Working together in weather, climate and water World Weather Watch (WWW) Programme Doc.3.1 WMO/OBSwww.wmo.int WMO Wenjian.
19/5/2011 Cg-XVI, Doc. 3.1(4) World Meteorological Organization Working together in weather, climate and water WWW Programme Instruments and Methods of.
World Meteorological Organization Working together in weather, climate and water Other Cross-Cutting Matters WMO Polar Activities and Global Cryosphere.
8/25/20141 World Meteorological Organization Working together in weather, climate and water Cg-XVI / Doc WMO I ntegrated G lobal O bserving S ystem.
World Meteorological Organization Working together in weather, climate and water WIGOS R-WIP-RA VI Jochen Dibbern, RA-VI Focal Point WMO Regional Association.
WIGOS/WIS and other WMO activities relevant to PORS
World Meteorological Organization Working together in weather, climate and water WMO OMM WMO WMO Strategic Plan and Regional Operating.
World Meteorological Organization Working together in weather, climate and water Quality Management Scylla Sillayo, S.O AeM Division WDS Department CBS.
WMO RA VI Response to the WMO Strategic and Operational Planning Ivan Čačić President RA VI EC WG/SOP, Geneva, February 2014.
World Meteorological Organization Working together in weather, climate and water WIGOS Framework Implementation Plan RA VI WORKING GROUP ON TECHNOLOGY.
Gender Mainstreaming Report
WMO WIGOS in support of DRR 2013 Coordination Meeting of DRR FP October 2013, Geneva Dr S. Barrell, Chair, ICG-WIGOS Dr I. Zahumensky, WIGOS-PO.
WMO Survey Analysis on Institutional Arrangements for NMHSs & Identification of Future Priorities of RA V WMO; DRA/RAP.
Potential role of WMO in Space Weather Jerome LAFEUILLE WMO Space Programme Office World Meteorological Organization Geneva.
WMO OMM WMO World Meteorological Organization Working together in weather, climate and water WMO Integrated Global Observing System (WIGOS) Dr Wenjian.
WMO INTEGRATED GLOBAL OBSERVING SYSTEM (WIGOS)
World Meteorological Organization Working together in weather, climate and water RA VI Workshop on the Implementation of WIS Sofia, Bulgaria, 1 – 3 November.
Surface Transport Service Delivery Dr Tang Xu Director, WDS WMO WMO; Name of Department (ND)
WMO OMM WMO World Meteorological Organization Working together in weather, climate and water Global Framework for Climate Services (GFCS) Dr Wenjian ZHANG.
World Meteorological Organization Working together in weather, climate and water WIGOS Implementation in Region VI WMO Jochen Dibbern, Chair CBS OPAG IOS.
WMO WMO INTEGRATED GLOBAL OBSERVING SYSTEM (WIGOS) Cg-17, Agenda Dr S. Barrell, Chair, ICG-WIGOS WMO; OBS.
World Meteorological Organization Working together in weather, climate and water EC WG-CD Terms of Reference and Review of Cg-XVI and EC-LXIII
World Meteorological Organization Working together in weather, climate and water WIGOS Implementation in Region VI WMO Dieter Schröder Chair WG-TDI Deutscher.
World Meteorological Organization Working together in weather, climate and water WIGOS – WMO Foundation for Meeting the Observing needs of Weather, Climate,
WMO WMO INTEGRATED GLOBAL OBSERVING SYSTEM (WIGOS) TT-PWPP-2 Chair's Opening Remarks WMO; OBS.
World Meteorological Organization Working together in weather, climate and water WMO OMM WMO WMO STRATEGIC PLAN Timelines and expectations.
WMO WMO INTEGRATED GLOBAL OBSERVING SYSTEM (WIGOS) STATUS OF IMPLEMENTATION (Dr S. Barrell, Chair, ICG-WIGOS) WMO; OBS.
World Meteorological Organization Working together in weather, climate and water THE GLOBAL FRAMEWORK FOR CLIMATE SERVICES (GFCS)
WMO RESPONSES OF WMO TECHNICAL COMMISIONS TO WIGOS IMPLEMENTATION Progress of WIGOS activities within Technical Commissions (Bertrand Calpini, co-Chair,
WMO ICG-WIGOS-5 GENEVA, SWITZERLAND, JANUARY 2016 Bertrand Calpini, Co-Chair ICG-WIGOS, CIMO President ICG-WIGOS >>> Our next challenges.
World Meteorological Organization Working together in weather, climate and water WMO OMM WMO WMO STRATEGIC PLAN CAeM Hong Kong, China.
WMO WMO INTEGRATED GLOBAL OBSERVING SYSTEM (WIGOS) ICG-WIGOS-5 Opening Remarks Sue Barrell, Co-Chair ICG-WIGOS WMO; OBS.
WMO WIGOS Pre-operational Phase Regional & National Perspectives Tyrone W. SUTHERLAND (BCT, EC FP for WIGOS)
1 Document 2.4 Reports of the RA Presidents Report of the 5 June 2010 Meeting of the Regional Association Presidents Common Regional Issues of Concern.
Improving Regional Business and
Report by the President
Concept Proposal for RA-III Regional WIGOS Centre
WMO Integrated Global Observing System (WIGOS) 16-RA VI Side Event Helsinki, Finland, 11 September 2013 Dr Miroslav Ondráš, Dr Wenjian Zhang (WMO) Dr.
EC-68 DOC 16.3 GOVERNANCE REVIEW
WIGOS Pre-operational Phase
Documentation Overview
5. STATUS OF THE PRIORITY AREAS IMPLEMENTATION OF THE PLAN FOR THE WIGOS PRE-OPERATIONAL PHASE (PWPP) 5.2 WIGOS Regulatory Material complemented with necessary.
Improving the business processes of regional associations
Overview of the WMO Integrated Global Observing System (WIGOS)
Dr Sue Barrell, Australia
Overview of WMO Strategic Planning Initiative
TROPICAL CYCLONE FORECASTING Director, WDS Department
The WIGOS Pre-Operational Phase
Topic 2 – Reform Documents 4(4) and 4(5)(Cg-18)
CONSTITUENT BODY REFORM (CBR)
Presentation transcript:

World Meteorological Organization Working together in weather, climate and water Working Together at Regional Level for a better future W. Zhang, D/OBS; R. Masters, D/DRA WMO

Annual Global Monitoring

3 Res. 11.3/1 (Cg-XVI) -IMPLEMENTATION OF THE WMO INTEGRATED GLOBAL OBSERVING SYSTEM (WIGOS) Requests Regional associations to: Develop their regional WIGOS implementation plans; Coordinate WIGOS implementation activities with WIS in their operating plan and work programme; Promote capacity building and outreach activities to assist Members in the implementation of WIGOS;

4 Congress further agreed that: Deliver the WIGOS Implementation Plan by the end of 2012; Establish a clear support structure to develop understanding of what is required to implement the Implementation Plan; and Coordinate with Members, the technical commissions and the regional associations to identify needs for nominated experts, including National Focal Points, and to work with Members to fill those needs.

5 TC and RA Sessions of next FP 1 st quarter 2 nd quarter 3 rd quarter4 th quarter 2012 CIMO TECO RA II CBS XVI 2013RA IV JCOMM IV RA VI 2014RA VRA III CBS ext(14) RA I CIMO XVI 2015Cg 17

6 Key issues on RA-WIGOS/WIS WHAT/WHO/WHEN? WHAT: –Firstly is the decision of the RA WIGOS priority areas –This should be decided by RAs WHAT: should be Services driven approach –WIGOS/WIS aim to provide data products & information for services, by integrating space & surface systems, WIGOS more than just observations ! –RAs shall determine RA-WIGOS priority areas based upon their RA services priority requirements –National WIGOS/WIS plan shall also determine their WIGOS priority based upon their urgent services needs.

7 Key issues on RA-WIGOS/WIS WHAT/WHO/WHEN? WHO: –RAs and Members within that RA should play primary role for RA-WIGOS/WIS and NA-WIGOS/WIS through their enhanced working structure –TCs play important technical support role –Secretariat departments provide coordination and organizing support role

8 WHO do the real job: Joint Mechanisms-1 Joint Working Team (J-WT) for each RA Composition –Chairperson of the J-WT from RA –Core members ( 4-5) from the RA –TC members from CBS and/or CIMO or other TCs (coordinate at ICG-WIGOS) –Secretariat P staff support, mainly focal points one each from DRA and OBS Dept. –National Focal Points can be invited. ToR of the J-WT –To develop the RA-WIGOS/WIS implementation plan –To provide technical guidance and support to the RA & Members of the RA for the WIGOS/WIS implementation –To report to the J-MG; RA sessions and TCs sessions on the progress & key issues with RA-WIGOS/WIS implementation Working methods –Develop RA-WIGOS/WIS plan by intensive working period (e-mtgs mainly) –Work together with relevant RA WGs & NMHSs for the WIGOS/WIS implementation during the IP Phase

9 WHO oversight the job: Joint Mechanisms 2- Joint Management & Oversight Group (J-MG) for each RA Composition –President of RA = Chair –PTC (CBS or CIMO or other TCs, priority dependent) or his representative –Chairperson of the J-Working Team –D/DRA & D/OBS, supported by DRA Regional Director & OBS WIGOS project office ToR of J-MG –Guidance & Decisions on the RA-WIGOS/WIS priority areas –Nominate J-WT member, supervise & review J-WT progress –Identify and mobilize resources to support the RA-WIGOS implementation Working methods –Discuss and exchange views by /video/audio –Face to face meeting annually, before each EC session –The meeting can be integrated with RA MG under a special item

10 Report to WHO: Cross Reporting & Review procedures (1) I-1: Report to RA session: the following suggestions are proposed: An Expert Segment be arranged 2-3 days before the political segment, to allow in-depth key technical discussions and suggestions within the regional experts J-WT Chair report to the RA session for guidance and key decisions, and he is responsible for the follow-up I-2: Report to RA MG annually during the inter-session period Set annual targets clearly with performance indicators RA MG review annual progress against the targets, and solve key problems

11 Report to WHO :Cross Reporting & Review procedures (2) II-1: Report to relevant TC sessions. The following ideas are considered: A specific time slot for the RA WIGOS report and discussion in the TC agenda. RA-WIGOS documents are part of the TC documents Each J-WT Chair shall report to the TC session for guidance and key technical decisions. II-2: Report to TC MG annually during the TC inter-session period Each J-WT provide summary before TC (CBS) MG Each TC MG session shall review RA-WIGOS/WIS progress

12 Report to WHO :Cross Reporting & Review procedures (3) III-1: Report to EC sessions: Annual EC session is an excellent chance to coordinate & guide RA-WIGOS/WIS key issues by EC members. WIGOS PO consolidate all the RA WIGOS progress before each EC, incorporate into EC WIGOS documents PRA/PTC joint session : Review all RA WIGOS progress as one of the agenda items of PRA/PTC joint session Special side meeting (s) should be arranged, in case of need, with all the specific EC members for specific issues III-2: Report to Cg 17 All RA presidents shall report to Cg 17 on their RA-WIGOS/WIS achievements & key issues TC presidents shall also report to Cg17 on both global and regional WIGOS/WIS implementation progress & achievements.

13 WHO support: Joint Support mechanism lets make the connections ! DRA & OBS depts, working together with other relevant depts, to play a key coordinating & supporting role to the work of the J-WT. Subject to the availability of funds: DRA Dept: –Support J-WT chairperson & core members for RA activities, including chairperson attendance to the CBS and/or CIMO sessions / activities –Support DRA staff to coordinate & attend TC sessions / activities OBS/RES/CLW Depts: –Support J-WT TC members activities, including attendance to the RA sessions / activities –Support OBS staff to attend RA sessions / activities RAs + Members –Mobilize resources (within the RA and/or working together with funding agencies, supported by D/RM) for supporting regional & national WIGOS/WIS implementation & coordination activities within the Region.

14 Key issues on RA-WIGOS WHAT/WHO/WHEN? WHEN: –WIGOS/WIS IP Plan shall be available no later than EC 64 (2012), in which RA- WIGOS plans are key components –Implementation shall start soon after EC 64 (June 2012) –Final report to Cg 17, 2015

15 Milestones for each year are needed: Take RA II as an example 1 st quarter2 nd quarter3 rd quarter4 th quarter 2012 Phase 0 IP th Q 2011 & MG 1 st Q 2012 Pre-phase IP 1) Teco on WIGOS 2) RA II review & app 2013 IP phase 1 IP phase 1 review 2014 IP phase II IP phase II review 2015 IP phase III CG 17 IP phase III

Key discussion questions What is the right strategy and efficient mechanism ? Are the proposed Joint Working and Management Mechanisms OK? What about the Reporting and Review process ? Resources Mobilization strategy for the real WIGOS Implementation ?

17 EC-LXII proposed key priorities for GFCS Capacity building WIGOS/WIS Disaster Risk Reduction Aeronautical meteorology