© WHO – PSM Validations – part 1 Workshop on GMP and Quality Assurance of TB products Kuala Lumpur Malaysia, 21 – 25 February 2005 Maija Hietava M.Sci.Pharm.

Slides:



Advertisements
Similar presentations
Basic Principles of GMP
Advertisements

Supplementary Training Modules on Good Manufacturing Practices
WHO - PSM Documentation – Part 2 Workshop on GMP and Quality Assurance of TB products Kuala Lumpur Malaysia, 21 – 25 February 2005 Maija Hietava M.Sci.Pharm.
Supplementary Training modules on Good Manufacturing Practices
World Health Organization
Radiopharmaceutical Production
WHO update on: Guidelines for the selection of RH medicines and prequalification of priority RH medicines Medicines Policy and Standards Health Technology.
The New GMP Annex 11 and Chapter 4 Deadline for coming into operation: 30 June 2011.
© WHO – PSM Quality Control Laboratory Pharmaceutical Quality, Good manufacturing Practice & Bioequivalence Kiev, Ukraine October 2005 Maija Hietava.
WHO - PSM Basic Principles of GMP Documentation - Part 1 Workshop on GMP and Quality Assurance of HIV products Shanghai, China 28 Feb - 4 March 2005 Maija.
WHO - PSM Water –part 3 Workshop on GMP and Quality Assurance of HIV products Shanghai, China 28 Feb - 4 March 2005 Maija Hietava M.Sci.Pharm Quality Assurance.
WHO - PSM Water for Pharmaceutical Use Water –part 2 Workshop on GMP and Quality Assurance of HIV products Shanghai, China 28 Feb - 4 March 2005 Maija.
WHO - PSM Water for Pharmaceutical Use Water –part 1 Workshop on GMP and Quality Assurance of HIV products Shanghai, China 28 Feb - 4 March 2005 Maija.
ANSI/ASQ E Overview Gary L. Johnson U.S. EPA
Software Quality Assurance Plan
Chapter 7: Key Process Areas for Level 2: Repeatable - Arvind Kabir Yateesh.
EQUIPMENT VALIDATION.
Project co-financed by European Union Project co- financed by Asean European Committee for Standardization Implementing Agency Module 11 GMP Workshop Kuala.
Introduction to PPDs Regulatory requirements and rationale.
Integrating CMC Review & Inspection Industry Recommendations Joe Anisko April 24, 2003.
1 Test Planning CSSE 376, Software Quality Assurance Rose-Hulman Institute of Technology March 9, 2007.
Radiopharmaceutical Production
Personnel Basic Principles of GMP Workshop on
World Health Organization
WHO Supplementary Training Modules GMP
Top Tactics for Maximizing GMP Compliance in Blue Mountain RAM Jake Jacanin, Regional Sales Manager September 18, 2013.
MCC PRESENTATION - GMP MANUFACTURING ENVIRONMENTS
Module 1, Part 1: Introduction and The VMP Slide 1 of 22 © WHO – EDM Validation Supplementary Training Modules on Good Manufacturing Practices.
Huzairy Hassan School of Bioprocess Engineering UniMAP.
Radiopharmaceutical Production
Module 4 | Slide 1 of 28 January 2006 Qualification and Validation Basic Principles of GMP Section 4.
Documentation –Part 2 Basic Principles of GMP Pharmaceutical Quality,
Dr. Pogány - WHO, Pretoria 1/26 Supplementary Training Workshop on Good Manufacturing Practices (GMP) VALIDATION MASTER PLAN (VMP) János Pogány,
World Health Organization
Basic Principles of GMP
Chapter 10.
ASEAN GMP TRAINING MODULE PERSONNEL
Project co-financed by European Union Project co- financed by Asean European Committee for Standardization Implementing Agency 1 Module 13 GMP Workshop.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Staffing and Training.
RAISING THE BAR Meeting CSA Guidelines And Preparing for Health Canada
Product Documentation Chapter 5. Required Medical Device Documentation  Business proposal  Product specification  Design specification  Software.
Important informations
Pharmaceutical Validation
Good Practices in Production and Quality Control Related Guidelines
Module 1,, Part 5: Review and summary Slide 1 of 13 © WHO – EDM Validation Part 5: Review and summary Supplementary Training Modules on Good Manufacturing.
Validation | Slide 1 of 27 August 2006 Validation Supplementary Training Modules on Good Manufacturing Practice WHO Technical Report Series, No. 937, 2006.
MANUFACTURING AND PRODUCTION OF BIOLOGICAL PRODUCTS (ERT 455)
Module 4Slide 1 of 23 WHO - EDM Validation Basic Principles of GMP.
Module 2Slide 1 of 26 WHO - EDM Quality Management Basic Principles of GMP Part One.
Sterile product validation
Pharmaceutical Quality Control & current Good Manufacturing Practice
ERT 421 Good Manufacturing Practice for Bioprocess Engineering Test 1: answer scheme.
WHO - PSM Basic Principles of GMP Documentation - Part 1 Workshop on GMP and Quality Assurance of HIV products Shanghai, China 28 Feb - 4 March 2005 Maija.
1. Our Presentation Topic: Importance Of Validation & Qualification In Pharmaceutical Industries Presented By: Md. Tanjir Islam (Group C) 2.
Radiopharmaceutical Production
World Health Organization
World Health Organization
Pharmaceutical Quality Control & current Good Manufacturing Practice
VALIDATION OF PHARMACEUTICAL PROCESSES
Author: Nurul Azyyati Sabri
Documentation –Part 2 Basic Principles of GMP Pharmaceutical Quality,
The WHO Prequalification of Medicines Programme Capacity building agenda Dr Milan Smid.
Flooding Walkdown Guidance
Supplementary Training Modules on Good Manufacturing Practices
Supplying the critical industry’s
12 Safe Maintenance Rules
Computer System Validation
Radiopharmaceutical Production
Radiopharmaceutical Production
Radiopharmaceutical Production
Presentation transcript:

© WHO – PSM Validations – part 1 Workshop on GMP and Quality Assurance of TB products Kuala Lumpur Malaysia, 21 – 25 February 2005 Maija Hietava M.Sci.Pharm Quality Assurance and Safety: Medicines, Medicines Policy and Standards, Health Technology and Pharmaceuticals Cluster Tel: Fax: World Health Organization Supplementary Training Modules on Good Manufacturing Practices

© WHO – PSM Part 1 Introduction and The Validation Master Plan (VMP) Part 2: Validation principles Part 3: Cleaning validation Part 4: Process validation Part 5: QC-related validation Validation

© WHO – PSM Objectives of Part 1 l To provide an introduction to the subject of Validation l To provide information on the Validation Master Plan Validation

© WHO – PSM Validation Introduction Three basic principles of Quality Assurance: l Quality, safety, effectiveness l Cannot inspect quality into a product l Processes must be under control

© WHO – PSM Validation WHO validation definition l The documented act of proving that any procedure, process, equipment, material, activity, or system actually leads to the expected results.

© WHO – PSM Qualification or validation? l A system must be qualified to operate in a validated process l Qualify a system and/or equipment l Validate a process l Qualification versus validation, e.g. you qualify an autoclave, whereas you validate a sterilization process Validation

© WHO – PSM Qualification and validation work require: l Collaboration of experts l Budget l Meticulous and careful planning A Validation Master Plan helps the manufacturer and inspectorate Validation

© WHO – PSM Validation The Validation Master Plan (VMP) l Philosophy l Content l Strategy

© WHO – PSM Validation Validation Master Plan l Recommendation only l Cover manufacturers validation policy and needs l Provides information on validation organization l It should describe: ä why? ä what? ä where? ä by whom? ä how? ä when?

© WHO – PSM Validation Validation Master Plan l Prospective validation l Concurrent validation l Retrospective validation l Revalidation l Change control

© WHO – PSM Validation The VMP helps: l Management l Validation team members l Project leaders l GMP inspectors

© WHO – PSM Validation The VMP l Identifies validation items (products, processes, systems) l Defines nature and extent of testing expected l Outlines test procedures and protocols l Summary document l Management agreement

© WHO – PSM Validation Activities in VMP l Every validation activity included l Revalidation l Validation of new process cycles l Large validation projects have separate VMPs l Include reasonable unexpected events Validation

© WHO – PSM Validation The VMP: l Enables overview of entire validation project l Lists items to be validated with the planning schedule as its heart l Is like a map

© WHO – PSM Validation The Introduction to the VMP l Validation policy l Project scope l Location and timing (including priorities) l Validation procedures l Standards

© WHO – PSM Validation VMP should state who is responsible for: l Preparing the VMP l The protocols and SOPs l Validation work l Report and document preparation and control l Approval/authorisation of validation protocols and reports in all stages of validation process l Tracking system l Training needs in support of validation

© WHO – PSM Validation VMP should contain: l Cross references to documents l Specific process considerations l Specific characteristics briefly outlined l Validation list (What to validate) ä premises, systems and equipment ä processes ä products

© WHO – PSM Validation VMP should contain: l Descriptions of ä plant (where to validate) ä processes ä products l Personnel attributes ä expertise and training l Key acceptance criteria

© WHO – PSM VMP should contain: l Format for protocols and other documentation l List of relevant SOPs (How) l Planning and scheduling (When) l Location (Where) l Estimate of staffing requirements (Who) l A time plan of the project (When) l Annexes Validation

© WHO – PSM Validation VMP should contain change control l Policy and procedure l Risk assessment l Authorization l Failure to properly document changes to the system means invalidation of the process

© WHO – PSM Validation Changes that require revalidation l Software changes; Controllers l Site changes; Operational changes l Change of source of material l Change in the process l Significant equipment change l Production area changes l Support system changes

© WHO – PSM Validation In summary, a VMP should contain at least: l Validation policy l Organizational structure l Summary of facilities, systems, equipment, processes to be validated l Documentation format for protocols and reports l Planning and scheduling l Change control l Training requirements

© WHO – PSM Validation Question no 14 l The equipment has to be __________ before validating the process which uses the equipment.

© WHO – PSM Validation Question no 28 l Which document explains the validation policy of the company?