SuperB. SuperB has been approved as the first in a list of 14 “flagship” projects within the new national research plan. The national research plan has.

Slides:



Advertisements
Similar presentations
November 16, 2002 Greetings to CLSI Users A Time of Transition W. Thomlinson CLSI Executive Director.
Advertisements

IEEE Fellow Program. IEEE Fellow status is granted to a person with an extraordinary record of accomplishments in any of the IEEE’s designated fields.
IEEE Fellow Program April 2008 Saint Julians, Malta Rosann Marosy.
Proposal for a Constitution for MICE A Plan for Discussion P Dornan G Gregoire Y Nagashima A Sessler.
Project Management Process. Project Complexity means that: a team of people are needed to supply expertise the work needs to be broken into manageable.
Incubation in Israel: Model and Performance. Extent  24 incubators  About 10 projects per incubator Typically between 8-12 projects  Grant of $
Proposal for a Constitution for MICE A Plan for Discussion P Dornan G Gregoire Y Nagashima A Sessler.
Introduction 1 Proposal for the structure of FAIR GmbH construction phase 2 Relationship between FAIR GmbH and GSI mbH construction phase Contract Site.
Spring 2008, King Saud University Engineering Administration Dr. Khalid Al-Gahtani 1 What is a Project? “A Project is a one-shot, time-limited, goal- directed,
National Science Centre An Important Component of Research Funding in Poland RECFA visit to Poland, Krakow 2012 Andrzej Jajszczyk.
Helmholtz Centre for Ion Research D. Krämer, 2nd Lab Directors Meeting, Protvino, January 15-16, 2008 Design and Engineering Issues; Standardization and.
Role of Management and Technical Coordination
This project is funded by the European Union ENVIRONMENTAL COLLABORATION FOR THE BLACK SEA GEORGIA, MOLDOVA, RUSSIA and UKRAINE Euroconsult This project.
The Preparatory Phase Proposal a first draft to be discussed.
African Aviation Training Organization Developed by TEWG – Group One. 1 Proposal Plan 2011.
Coordinating EC Research Projects Paul Drath Singleimage Limited 3 Foundry Walk St Ives Cambs PE27 5FW phone fax
EPOS Preparatory phase Torild van Eck (ORFEUS) Call INFRA Deadline: December 3, 2009 Funding: between 3 and 6 MEuro Duration: max 4 year.
In-Kind Contribution Management Update Allen Weeks March 20, Lund.
Consolidation of access systems for the injector Complex ATOP days 4-6 March 2009 P. Ninin & R, Nunes in behalf of the PS and SPS access project teams…
FY15 YEAR-END PLANNING and FY16 NEW FUNDING REQUESTS.
EPOCA – 11. June EPOCAConsortiumOrganisation.
President’s Office of Science and Technology Policy Deborah D. Stine Specialist in Science and Technology Policy December 3, 2008.
FOR SIXTY YEARS WE HAVE BEEN TAKING THE POWER FROM WATER AND HANDING IT OVER TO NATIONS LINKING THE DOTS Bucharest, February 20, 2014.
Relationship: PAC's, SAI's and Accountant General in Improving transparency and accountability process Contributions for discussion from Mozambique National.
Mapping 3M activities and needs at UPT E3M-AL PROJECT - DEVELOPING THIRD MISSION ACTIVITIES IN ALBANIAN UNIVERSITIES Project No: TEMPUS ES-TEMPUS-SMHES.
HL-LHC FP7 DS Status of the proposal Lucio Rossi - CERN 3rd General Meeting for application preparation – CERN 20 October.
Astroparticle Physics for Europe ASPERA – 2 Workpackage 5 1. Workpackage 5 - European-wide common calls and other common actions Deborah Miller, STFC.
ASA Board Membership Board Members: (vote) Four Paraguayan Citizens Four U.S. Citizens One Third-country National Ex-Officio Members: (voice but no vote)
LIGO-G M Management and Operation Plans/Budget Stan Whitcomb NSF Annual Review 8 November 2004 Caltech.
Arnsburger Str. 64, Frankfurt, Germany Tel , Fax Internet:
Norman McCubbin1 Report from the Collaboration MICE Project Board (CMPB) Norman McCubbin Director, Particle Physics Department MICE/UKNF Oversight Committee.
1 ASTRONET Coordinating strategic planning for European Astronomy.
ITWG Topical Workshop Management of Instrumentation Projects 19 to 21 May 2014 Rolf Lindner.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement EuCARD-2 Governance.
CERN openlab Phase V Governance, Timelines and Plans CERN openlab Major Review 16/10/2014 Alberto Di Meglio.
4rd Meeting of the Steering Committee on Competence of Human Resources for Regulatory Bodies Vienna, 4-7 December 2012 Current Status of the Human Resources.
Budget, Installation plan, Resource Organizational Structure & New Law for Research Centers Avni AKSOY 7th IMAC Meeting of TARLA, IAT, 7 September 2015.
EGEE JRU Workshop, Brussels, December 1 st, JRU RoGrid – Romanian Experience RoGrid Consortium RoGrid JRU set-up RoGrid JRU Implementation Internal.
Status and role of International Department (Slovak experience) MGSC Meeting Luxembourg 23 – 24 March 2012 SOSR.
1 Future Circular Collider Study Preparatory Collaboration Board Meeting September 2014 R-D Heuer Global Future Circular Collider (FCC) Study Goals and.
{ RUSSIAN-AMERICAN YOUTH ASSOCIATION GENERAL CONCEPT Introduced by: Sergey Gladysh Introduced on: Passed by the Executive Committee: (date) Approved.
1 Costs to Completion Common funds &Running Costs Support for Running OPERA Funding Issues L. Votano Resource Coordinator OPERA Funding Agencies meeting.
L. Serin CNRS/IN2P3 AIDA Second Annual Meeting 1 Deliverables M1 - M128 M13-M246 M25-M367 M37-M4833 Y1 : All achieved, a few ones with 6 months delay Y2.
Office of Major Project Development (OMPD) Overview November 2015.
For more than 115 years, the AUHSD has developed the future business and civic leaders of Anaheim, Buena Park, Cypress, La Palma and Stanton 90% of our.
ESS | title of presentation | 2012-xx-xx | name of presenter Roles and Responsibilities sub title.
European Spallation Source Overview and Status Technical Advisory Committee 1-2 April 2015 James H. Yeck ESS CEO & Director General
General Introduction Markus Nordberg (CERN DG-DI-DI) 1
SuperB project. The origin: infn roadmap 2006 early motivations – e+ e- after Dafne at LNF – SuperB’s synergy with ILC damping rings.
1 Guy Wormser LAL Orsay On behalf of the SuperB Project SuperB Information Day, Strasbourg, 23 September 2011 Status of SuperB Project.
WP leaders meeting R. Aleksan October 5 th, 2009 TIARA 1.Objectives 2.General Context 3.Building TIARA 4.Conclusion.
FISCO2 – Financial and Scientific Coordination Work Package dedicated to ENSAR2 management WP leader: Ketel Turzó WP deputy: Sandrine Dubromel ENSAR2 Management.
WP leaders meeting R. Aleksan October 5 th, 2009 TIARA 1.Objectives 2.WP management 3.General rules 4.Conclusion Work Packages.
XV SuperB General Meeting Caltech Dicember , 2010 SuperB Today M.A.Giorgi INFN & Universita’ di Pisa.
AMICI WP1 – Management, coordination and dissemination
ESS Innovation Procurement Workshop
Progress and status of the mission in China
WP1 - Consortium coordination and management
Marcello A. Giorgi Università di Pisa & INFN Pisa
Gybe The superB flagship project failed getting the extra support needed to meet the financial planning of a fresh costing reassessment, even in the case.
PROJECT MANAGEMENT (ARCH 484) DEPARTMENT OF ARCHITECTURE & BUILDING SCIENCE.
Report on EUCARD WP6: MICE Transnational Access (TA)
European Network for Novel Accelerators (EuroNNAc)
Setting up an ERIC 11 May 2012 Richard Derksen
AMICI WP1 – Management, coordination and dissemination
Standard Setting – Input to Benchmarking
ASTRONET Coordinating strategic planning for European Astronomy
Preliminary Project Execution Plan
LHC Computing, RRB; H F Hoffmann
Presentation transcript:

superB

SuperB has been approved as the first in a list of 14 “flagship” projects within the new national research plan. The national research plan has been endorsed by “CIPE” ( the institution responsible for infrastructure long term plans) A financial allocation of 250 Million Euros in about five years has been approved for the “superb flavour factory” at the end of 2010 Approval

Money flow At the end of 2010 an initial sum of 19 ME has been allocated A sum of the order of 24 has been announced for 2011 budget Dedicated extra resources for computing: 13.7Meuro already allocated

The proposed funding profile year = year +2

milestones Past – The site choice Present – The consortium legal constitution

Site choice: requirements Extension Electric power supply Cooling Vibrations Vicinity of Frascati

The Tor Vergata option Autonomous interest from a wide community of the University ( not only physicists) First contacts for a feasibility evaluation – Space – Electricity – Water – permits

Site requirements ok in a first approximation – Extension of the order of square meters – 2X150 Kilovolt electric supplies nearby *** lines available when needed **** – Water supply adequate and the possibility of additional supply from a number of pits – Vibration measurements: the good surprise – Site archaeology free

Added values Strong role in the civil engineering works: likely civil engineering will be a university task University expertise available for general services ( students campus) A door to the academic non particle physics community

LNF About 4.5 Km Tor Vergata University campus selected

Possible layout

The legal identity

The consortium governance A Cern like management structure – A director general and a directorate Departments under director’s supervision – A scientific evaluation committee Science (phase II) Machine (phase I) – A finance evaluation committee A known and working scheme

The statute of the Cabibbo lab founders: Tor Vergata University and INFN Phase I construction, Phase II operation Open to additional members – Associate – Full members the Italian Institute of Technology joins by the end of the year after the final definition of its economical engagement

The top structure Council of member institutions delegates Director general – Directorate ( accelerator, experiment interface, administration, synchrotron light) Scientific committee ( phase I a Machine Advisory Committee) “revisori dei conti”

Voting rights Full member with quotas proportional to the contribution

The finance advisory committee Monitoring the financial flow and the available resources Updating periodically the cost estimate and its comparison with available resources Assessing the equivalent financial contribution of in kind deliverables

Accelerator Project management scheme: Accelerator Directorate – Membership: Project Director (Scientific) Deputy Director (Technical) identified Chief Engineer (Coordinator)

Accelerator Board – Membership: Accelerator Directorate WP Leaders TA Leaders – Function: Supervises and reviews the status of the project. Ensures the resources needed in order to achieve the Working Packages deliverables

Delocalized Working Package Leaders functions: – Coordinate the single working package – Responsible to follow and achieve the WP deliverables – Coordinate Task Manager – WPTL (Persons responsible for the realization of the specific WP tasks)

Resident Technical Areas Leaders functions: – Coordinate the technical services staff – Responsible for the executive design purchasing and installation of the subsystems – About 60/70 people at start time

Superb as a light source Soon a workshop for the community at large During the high energy physics mode a limited number of beam lines can be operating

Very short term milestones (By the end of the year) Consortium – Start spending money ( already two meetings of the council) – IIT joined – Director general appointed and accelerator and physics director enrolled Team – Calls for new 30 people launched Recognition of INFN personnel achieved Letter of intents with foreign institutions of WP share – Civil construction Authorizations for construction advanced

Short term milestones (By next summer) First financial assessment WP at work Main machine design frozen First associate foreign partners under negotiation Light source project defined for the first phase Civil engineering project in an advanced stage Site prepared for work Computing centres construction started Consortium administration consolidated