INTRODUCTION TO PRIMAVERA PROJECT MANAGEMENT MODULE (P6) The Primavera Project Management module is comprehensive, multi- project planning and control.

Slides:



Advertisements
Similar presentations
Project Management with VIVA PPM Tool (Project Portfolio Management)
Advertisements

DIGIDOC A web based tool to Manage Documents. System Overview DigiDoc is a web-based customizable, integrated solution for Business Process Management.
Project Management from Simple to Complex
Project Scheduling Using OpenProj.
Creating a Schedule Using Network Diagrams; Defining Task Durations
©2012 Construction Science, LLC 1 Primavera P6 Settings Presented by Karen Reynolds, Partner Construction Science, LLC.
Advanced Project Management - CPH
Defining activities – Activity list containing activity name, identifier, attributes, and brief description Sequencing activities – determining the dependencies.
Creating the Project Plan
Systems Analysis and Design 9th Edition
Copyright © 2009 T.L. Martin & Associates Inc. Chapter 2 Key CPM Scheduling Terms.
Project Time Management
Project Cost Management Estimation Budget Cost Control
© 2004 Visible Systems Corporation. All rights reserved. 1 (800) 6VISIBLE Holistic View of the Enterprise Business Development Operations.
Class 28: Chapter 16: Project Management Class 28 Agenda –Collect Player Diary 2 and Conduct Player Audit No ed diaries – 5 PM Deadline –Discuss Grade.
Project Time Management
Business Intelligence Dr. Mahdi Esmaeili 1. Technical Infrastructure Evaluation Hardware Network Middleware Database Management Systems Tools and Standards.
1 ®  Overview Benefits of a Good Construction Schedule Baseline Schedule Development Schedule Updating and Maintenance Managing Project Changes USACE.
Project Portfolio Management Technology Analysis Russ Hopler IBM Rational Software.
Managing Projects
Project Management and Scheduling
Project Management Software Tools Cheryl A. Wilhelmsen Lee Ostrom.
Office of Project Management Metrics Report Presentation
Edward B. Farkas, Managing Director, Project Management Practice
Managing Projects using Oracle Project Management (PJT) & SPREADSHEETS Neeraj Garg Vice President, Client Services.
Maximizing the Power of Microsoft ® Project and Microsoft ® Word Dr. John A. Estrella, CMC, PMP Presented to MPA Greater Toronto Area 20 February 2008.
5.1 Principles of Project Management. So what is Project Management? Definition: Is the process of planning, organizing, and managing tasks and resources.
Project Management : Techniques and Tools (60-499) Fall 2014 / Winter 2015.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
POST GRADUATE PROGRAM OF INFORMATION TECHNOLOGY
EGNR 300 Project Management Planning & Scheduling ENGR 300 Dept. of Computer Science and Engineering University of Bridgeport,
Information Technology Project Management, Seventh Edition Note: See the text itself for full citations.
© 2012 Cengage Learning. All Rights Reserved. This edition is intended for use outside of the U.S. only, with content that may be different from the U.S.
IT Project Management, Third Edition Chapter 6 1 Chapter 3: Project Time Management.
BIS 360 – Lecture Two Ch. 3: Managing the IS Project.
Lecture 7. Review of Lecture 6 Project Scheduling: The process of defining project activities, determining their sequence, estimating their duration Scheduling.
Managing Project Resources. Project Resources Human Resources Project stakeholders: – Customers – Project team members – Support staff Systems analyst.
ISM 5316 Week 3 Learning Objectives You should be able to: u Define and list issues and steps in Project Integration u List and describe the components.
Slide 1 Project Management Chapter 4. Slide 2 Objectives ■ Become familiar with estimation. ■ Be able to create a project workplan. ■ Become familiar.
University of Southern California Center for Systems and Software Engineering Barry Boehm, USC CS 510 Software Planning Guidelines.
PROJECT MANAGEMENT Outline What is project mean? Examples of projects… Project Planning and Control Project Life Cycle Gantt Chart PERT/CPM.
Information Systems System Analysis 421 Chapter 3 Managing the Information Systems Project.
Industry Goals. Increase Customer Satisfaction  On-Time, On-Budget, Within Scope  Ensure High Quality Delivery Increase Margins  Drive Efficiencies.
Project Time Management
MICROSOFT PROJECT 2010 Robert Olivieri Senior Instructor MicroAssist.
Lessons Learned – Schedule Updating and Maintenance using Primavera P6 Hannah Schumacher, PSP, PMI-SP, LEED AP Hill International Charlie Jackson, PSP,
Hannah Schumacher, PSP, LEED AP, PMI-SP Hill International Charlie Jackson, PSP, Primavera Certified Trainer Project Life Span, LLC Construction CPM Conference.
Project Management Why do projects fail? Technical Reasons
Microsoft Project 2010 ® Tutorial 5: Tracking Progress and Closing the Project.
Asset accounting-29.pptx This course will give an overview of the following Workbreakdown Structure Network Project Builder Project Planning.
SOFTWARE PROJECT MANAGEMENT
BSBPMG501A Manage Project Integrative Processes Manage Project Integrative Processes Project Integration Processes – Part 2 Diploma of Project Management.
Copyright 2012 John Wiley & Sons, Inc. Part II Project Planning.
Copyright 2006 John Wiley & Sons, Inc. Beni Asllani University of Tennessee at Chattanooga Project Management Operations Management - 5 th Edition Chapter.
Develop Schedule is the Process of analyzing activity sequences, durations, resource requirements, and schedule constraints to create the project schedule.
VA Primavera P6: Baselining the Project Department of Veterans Affairs Office of Information and Technology IT Workforce Development (ITWD) in collaboration.
Event Project Management By: Zhou Chunlin School of Tourism, Conference and Exhibitions Henan University of Economics and Law.
Copyright 2015 John Wiley & Sons, Inc. Project Planning Part II.
IT-301 Project Management I: Unit 4: Cost Management.
BSBPMG503A Manage Project Time Manage Project Time Project Time Processes Part 2 Diploma of Project Management Qualification Code BSB51507 Unit Code.
Creating a Work Breakdown Structure with Microsoft Project.
MS Office Project Portfolio Server Overview of Project Server Gateway.
Introduction to Project Management Chapter 7 Managing Project Resources Information Systems Project Management: A Process and Team Approach, 1e Fuller/Valacich/George.
Key Features Advantages over PDF sharing Use Cases Clients
Project Management and Information Security
Introduction to PrimaveraReader™
CAD DESK PRIMAVERA PRESENTATION.
Time Scheduling and Project management
Presentation transcript:

INTRODUCTION TO PRIMAVERA PROJECT MANAGEMENT MODULE (P6) The Primavera Project Management module is comprehensive, multi- project planning and control software, built on Oracle and Microsoft SQL Server relational databases for enterprise-wide project management scalability. The Project Management module enables your organization to store and manage its projects in a central location. The module supports work breakdown structures (WBS), organizational breakdown structures (OBS), user-defined fields and codes, critical-path-method (CPM) scheduling, and resource leveling. Dr. Tomas U. Ganiron Jr

Why Primavera is required? Gives complete Project Management Solution. Internationally Reputed. Having Flexibility to Manage Multiple Projects in Centralized location. Provides facility to Integrate ERP or Accounting System. It is Web based Project Management gives the project team anywhere, anytime access to the projects they are assigned to work on. A 100% Web-based user interface covers the full project management lifecycle from project initiation through to project closeout. It gives the creation of Work Breakdown Structure (WBS) and activities, documenting and managing project risks and issues, managing status updates, and reporting on key performance indicators like earned value. By using Primavera Project Management, organizations can ensure that the project team members are communicating with each other, whether it is regarding activity status updates, scope changes, revisions to documents, or issue(s) resolution. Dr. Tomas U. Ganiron Jr

Advantages of using primavera in comparison with using other conventional planning tools. Centralized Project Repository : With all projects are in a centralized database, the robust security module protects project data and offers flexibility when determining who can access each project. Enterprise Project Structure & Codes : A configurable Enterprise Project Structure (EPS) helps forms the hierarchical structure of the projects based on your organizational needs. Extensible Project Codes help capture different attributes of projects, such as the region where the project is being executed or the type of project Cross-project Analysis and Reporting : Quickly and easily create cross-project dependencies and see how projects impact one another. Built-in analysis shows whether resources are over- or under-allocated across projects CPM Scheduling : P6 provides Critical Path Method (CPM) Scheduling, which uses the activity durations, relationships between activities and calendars to calculate a schedule for the project. CPM identifies the critical path of activities, those activities that affect the completion date for the project or an intermediate deadline, and if delayed will delay the finish of the project. Float Path Analysis : Float Path Analysis identifies all critical paths within a project to help avoid potential delays before they occur and to help visualize an activity's importance to overall project plan. Dr. Tomas U. Ganiron Jr

Advantages of using primavera in comparison with using other conventional planning tools….. Cross-Project Dependencies : Cross-project dependencies helps to monitor overall critical path of the program and reduces the risk of multiple parties working together. Resource Assignments : When project resources needs have been determined, they can easily be assigned to the schedule activities. P6 tracks labor, material, equipment and expense needs for activities and WBS nodes. ERP or Accounting Integration : The P6 architecture allows for integration with ERP or Accounting Systems so that schedule and cost information can be shared. Resource Leveling : Resource leveling helps ensure that sufficient resources are available to perform the activities in the project plan. Baseline Management : Store unlimited versions of the schedule, resources and cost assignments to compare how the project is progressing vs. the original plan vs. the last update cycle, vs. 6 months ago, etc. Projects Reports : Select from 150+ predefined reports and unlimited custom reports. Dr. Tomas U. Ganiron Jr

Offered Products of Primavera for Corporate level Project Management ProductComponents Power User (Client)Web Projects, Resource Portfolios, Advanced Portfolio & Capacity Planning, Dashboards, Collaboration, Time Sheets. Functional UserWeb Projects, Resource Portfolios, Advanced Portfolio & Capacity Planning, Dashboards, Collaboration, Time Sheets. ContributorWeb Projects limited to activity updating, Collaboration, Time Sheets. Dr. Tomas U. Ganiron Jr

Brief about Techniques used for Scheduling Projects CPM – Critical Path Method : The method by which activity durations and the relationships between activities are used to mathematically calculate a schedule for the entire project. CPM focuses attention on the critical path of activities that affect the completion date for the project or an intermediate deadline. Early dates, the earliest possible dates each activity can start and finish, and late dates, the latest possible dates each activity can start and finish without delaying the project finish or an intermediate deadline (constraint) are also calculated. PERT The program evaluation and review technique (PERT) uses the same ideas as CPM; but instead of using just the most likely time estimate, it uses a probabilistic estimate of time for completion of an activity. Dr. Tomas U. Ganiron Jr

Integration of Primavera with SAP Motivation Many companies are with project management needs are using SAP as their integrated backbone for enterprise financials & control. Experienced schedulers & Project Managers prefer the project management focus of Primavera Project Planning software for crucial execution processes like planning, scheduling, and execution tracking. Thus, a powerful process integration retains the strengths of both enterprise financials as well as planning, scheduling and enables best use of software packages. Dr. Tomas U. Ganiron Jr

Structuring Projects 1.Setting-up and define EPS (Enterprise Project Structure). 2.Add a project to the EPS hierarchy. 3.Defining WBS (Work breakdown structure) to the Project. 4.Defining OBS (Organisational breakdown structure) 5.Defining Resources. 6.Create Calendar for Activities & Resources. 7.Add activities to WBS. 8.Input activity details. 9.Schedule project. 10.Updating progress after project starts. 11.Preview / Print reports (Default / Custom made reports). (EPS) Enterprise Project Structure Projects (WBS) Work Breakdown Structure Activities (OBS) Organisational Breakdown Structures Dr. Tomas U. Ganiron Jr

EPS (Enterprise Project Structure) EPS create/edit form : The Enterprise Project Structure (EPS) forms the hierarchical structure of your database of projects. Each EPS node (or folder) can be subdivided into multiple levels to represent the work that needs to be done in your organization. The number of levels and their structure depend on the scope of your projects and how you want to summarize data. Dr. Tomas U. Ganiron Jr

Adding project to EPS hierarchy. We can organise unlimited number of Projects in EPS in groups. Project added under Industrial Plants (EPS Node) Dr. Tomas U. Ganiron Jr

WBS (Work Breakdown Structure) Example of WBS Structures A WBS is a hierarchy of work that must be accomplished to complete a project, which defines a product or service to be produced. The WBS is structured in levels of work detail, beginning with the deliverable itself, and is then separated into identifiable work elements. Project Civil Works Buildings Ware House Foundation Superstructure Finishing Works Admin Building Roads & Drains Equipment Fdns Mech. Works Tanks Fire Water Tank Diesel Tank Piping Dr. Tomas U. Ganiron Jr

OBS (Organisational Breakdown Structure) Example of OBS Structures The organizational breakdown structure (OBS) is a global hierarchy that represents the managers responsible for the projects in enterprise. The OBS usually reflects the management structure of organization, from top-level personnel down through the various levels constituting your business. We can associate the responsible managers with their areas of the EPS either nodes or individual projects. President Regd. Office Engineering Project Administration Sr. GM GM Sr.Manager Design Design Engineer Finance GM Finance HRD & Admin Sites Project Manager Planning & Billing Engineer Engineer Execution Dr. Tomas U. Ganiron Jr

Defining Resources. Resources include the personnel and equipment that perform work on activities across all projects. Resources are generally reused between activities and/or projects. Dr. Tomas U. Ganiron Jr

Creating Calendars Create and assign calendars to each resource and each activity. These calendars define the available work-hours in each calendar day. We can also specify national holidays, your organization's holidays, project-specific work/non- workdays, and resource vacation days. Calendar assignments are used for activity scheduling, tracking, and resource leveling. Dr. Tomas U. Ganiron Jr

Adding activity to WBS WBS Task / Activity Activity Detail form Dr. Tomas U. Ganiron Jr

Activity ID, Name & Type of activity. Start, Finish Dates (Early, Late). Steps of an Activity (Breakdown the activity to smaller units). Relationship between activities (Predecessor, Successor). Resource Assignment (Labour, Non-Labour & Material) Activity Calendar. Constraints. Status of activity (Actual start & finish dates, % of progress). Expenses. Any other comments, notes etc. List of common Inputs / Information to be given to an activity Dr. Tomas U. Ganiron Jr

Project schedule can be calculated one of two ways: when we choose the Scheduling command or each time we make a change that affects schedule dates. The Critical Path Method (CPM) scheduling technique is used to calculate project schedules. CPM uses activity durations and relationships between activities to calculate the project schedule. Scheduling Project Dr. Tomas U. Ganiron Jr

To update the progress of the individual activity, the following inputs are to be given in the activity detail form. 1. Start Date (If activity is started) 2. Finish Date (If activity is completed) 3. % of duration completed (if activity is in progress) 4. Remaining duration to complete the activity Updating Progress Dr. Tomas U. Ganiron Jr