Www.egi.eu EGI-InSPIRE RI-261323 EGI-InSPIRE www.egi.eu EGI-InSPIRE RI-261323 EG recent developments T. Ferrari/EGI.eu ADC Weekly Meeting 15/05/2012 1.

Slides:



Advertisements
Similar presentations
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI GGUS user authentication Tiziana Ferrari/EGI.eu Peter Solagna/EGI.eu
Advertisements

LHC Experiment Dashboard Main areas covered by the Experiment Dashboard: Data processing monitoring (job monitoring) Data transfer monitoring Site/service.
08/11/908 WP2 e-NMR Grid deployment and operations Technical Review in Brussels, 8 th of December 2008 Marco Verlato.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI Unified Middleware Distribution (UMD): SW provisioning to EGI Mario David.
Experiment Support CERN IT Department CH-1211 Geneva 23 Switzerland t DBES Support Tools, Underlying Services and WLCG Operations Lionel.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI Future support of EGI services Tiziana Ferrari/EGI.eu Future support of EGI.
EGI: SA1 Operations John Gordon EGEE09 Barcelona September 2009.
HPDC 2007 / Grid Infrastructure Monitoring System Based on Nagios Grid Infrastructure Monitoring System Based on Nagios E. Imamagic, D. Dobrenic SRCE HPDC.
European Grid Initiative Federated Cloud update Peter solagna Pre-GDB Workshop 10/11/
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI EGI Report Mario Reale NGI IT / GARR HEPiX f2f meeting.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI EGI Towards H2020 Tiziana Ferrari/EGI.eu WLCG Collaboration Workshop.
RI EGI-InSPIRE RI EGI Future activities Peter Solagna – EGI.eu.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks SA1: Grid Operations Maite Barroso (CERN)
Your university or experiment logo here The European Landscape John Gordon GridPP24 RHUL 15 th April 2010.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI (Present and) Future of the EGI Services for WLCG Peter Solagna – EGI.eu.
1 Andrea Sciabà CERN Critical Services and Monitoring - CMS Andrea Sciabà WLCG Service Reliability Workshop 26 – 30 November, 2007.
Information System Status and Evolution Maria Alandes Pradillo, CERN CERN IT Department, Grid Technology Group GDB 13 th June 2012.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks EGI Operations Tiziana Ferrari EGEE User.
Report from the WLCG Operations and Tools TEG Maria Girone / CERN & Jeff Templon / NIKHEF WLCG Workshop, 19 th May 2012.
EMI INFSO-RI SA1 Session Report Francesco Giacomini (INFN) EMI Kick-off Meeting CERN, May 2010.
Accounting Update John Gordon and Stuart Pullinger January 2014 GDB.
WLCG Technical Evolution Group: Operations and Tools Maria Girone & Jeff Templon Kick-off meeting, 24 th October 2011.
Julia Andreeva on behalf of the MND section MND review.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI How to integrate portals with the EGI monitoring system Dusan Vudragovic.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI Accounting Old and New Requirements John Gordon Revised 22/3/12.
PIC port d’informació científica EGEE – EGI Transition for WLCG in Spain M. Delfino, G. Merino, PIC Spanish Tier-1 WLCG CB 13-Nov-2009.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI Monitoring of the LHC Computing Activities Key Results from the Services.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI Ops Portal New Requirements.
LCG WLCG Accounting: Update, Issues, and Plans John Gordon RAL Management Board, 19 December 2006.
AEGIS Academic and Educational Grid Initiative of Serbia Antun Balaz (NGI_AEGIS Technical Manager) Dusan Vudragovic (NGI_AEGIS Deputy.
LCG Accounting Update John Gordon, CCLRC-RAL WLCG Workshop, CERN 24/1/2007 LCG.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI Evolution of AAI for e- infrastructures Peter Solagna Senior Operations Manager.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI Supporting Distributed Computing Infrastructures Torsten Antoni, KIT
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI EGI-InSPIRE APEL for Accounting John Gordon, Stuart Pullinger STFC.
RI EGI-InSPIRE RI UMD 2 Decommissioning Status Cristina Aiftimiei EGI.eu.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI Requirements Status EGI.eu UCB
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI TS8.10 A new approach to Computing Availability/Reliability reports for EGI.
CERN - IT Department CH-1211 Genève 23 Switzerland t IT-GD-OPS attendance to EGEE’09 IT/GD Group Meeting, 09 October 2009.
EGI-InSPIRE RI EGI-InSPIRE Project Summary August 2011 – October 2011 PQ6 August October 2011.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI Operations Portal Development Update on Requirements Cyril L'Orphelin IN2P3/CNRS.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI UMD Roadmap Steven Newhouse 14/09/2010.
EMI INFSO-RI Testbed for project continuous Integration Danilo Dongiovanni (INFN-CNAF) -SA2.6 Task Leader Jozef Cernak(UPJŠ, Kosice, Slovakia)
EGI Process Assessment and Improvement Plan – EGI core services – Tiziana Ferrari FedSM project 1EGI Process Assessment and Improvement Plan (Core Services)
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI Regionalisation summary Prague 1.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI Storage Accounting John Gordon, STFC OMB August 2013.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI GLUE 2: Deployment and Validation Stephen Burke egi.eu EGI OMB March 26 th.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI EGI Technology Sustainability Discussion Points DCI Sustainability Meeting.
John Gordon EMI TF and EGI CF March 2012 Accounting Workshop.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI Update on Service Availability Monitoring (SAM) Marian Babik, David Collados,
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI EGI Services for Distributed e-Infrastructure Access Tiziana Ferrari on behalf.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI Regional tools use cases overview Peter Solagna – EGI.eu On behalf of the.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI First Ops Tools Long Term Sustainability F2F David Collados 1First Ops Tools.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI A pan-European Research Infrastructure supporting the digital European Research.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI EGI Software Repository Progress Report Kostas Koumantaros et al, GRNET 7/3/2016.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI EGI Release Process Michel Drescher, EGI Kostas Koumantaros, GRNET 7/5/2016.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI APEL Regional Accounting Alison Packer (STFC) Iván Díaz Álvarez (CESGA) APEL.
EGI-InSPIRE RI EGI-InSPIRE RI EGI-InSPIRE Software provisioning and HTC Solution Peter Solagna Senior Operations Manager.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI MPI VT report OMB Meeting 28 th February 2012.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI Information system workshop Stephen Burke egi.eu EGI TF Madrid September.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI EGI solution for high throughput data analysis Peter Solagna EGI.eu Operations.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI Role and Challenges of the Resource Centre in the EGI Ecosystem Tiziana Ferrari,
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI Accounting task force T. Ferrari/EGI.eu Accounting task force/TCB meeting.
EMI and GISELA Collaboration
John Gordon STFC OMB 26 July 2011
gLite->EMI2/UMD2 transition
POW MND section.
Advancements in Availability and Reliability computation Introduction and current status of the Comp Reports mini project C. Kanellopoulos GRNET.
TS4.10 Comp Reports A new approach to Computing Availability/Reliability reports for EGI Progress Report C. Kanellopoulos GRNET 9/14/2018.
Solutions for federated services management EGI
EGI operations - news T. Ferrari/EGI.eu 12/9/2018.
Presentation transcript:

EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI EG recent developments T. Ferrari/EGI.eu ADC Weekly Meeting 15/05/2012 1

EGI-InSPIRE RI Outline Progress report on several technical areas discussed in the operations TEG –WP1 – monitoring and metrics –WP2 – support tools SAGrid 2

EGI-InSPIRE RI WG1 Network monitoring –EGI/ DANTE MoU under discussion for Perfsonar-MDM deployment support –Updates from DANTE at the main –Which kind of collaboration with ATLAS? Monitoring of services –Relying on EMI support to this 3

EGI-InSPIRE RI WP1 – monitoring and metrics “It should be discussed if SAM should provide more or different granularity than the service endpoint. Some experiment for example finds important to test the granularity of the Storage Space Token (rather than the storage endpoint). At the same time, it should be discussed if the current limitation (endorsed by the MB) of testing only services published in GOCDB should be revisited” GOCDB support of Custom Service Types for VO or site-specific servicesCustom Service Types –CUSTOM.org.squid-cache.Squid –CUSTOM.ch.cern.frontier.FroNTier –CUSTOM_SERVICE –New type can be requested through GGUS/RT/ GGUS/RT/ GOCDB developments v4.4 (June/July) –Multiple Endpoints per Service conforming to GLUE 2.0 information model –GLUE2 rendering of GOCDB data (requires update of the XML output module)  useful for GOCDB/OIM harmonization of the interface 4

EGI-InSPIRE RI WP1 – monitoring and metrics Monitoring as a service. Monitoring systems should be treated as any other critical service. This includes a proper release cycle (including a pre-production instance for integration), a scalable deployment and proper operational procedures for upgrades/incidents/downtimes. The SAM project for example already follows those guidelines and should be considered as an example SAM releases are tested by Early Adopters in EGI –NGI SAM instances (together with other central operational services) will be monitored by a central SAM instance (waiting for SAM update 17) Monthly availability/reliability statistics Minimum availability: 99%  will be assessed 5

EGI-InSPIRE RI WP2 – support tools Full implementation of GGUS failover expected in QR (GGUS plans for 2012)GGUS plans for 2012 Accuracy of CPU benchmarking information –General issue concerning information from BDII –Waiting for EMI 2 release notes to see level of support of information validation Storage accounting –In progress: STAR and sensor development (EMI), accounting portal views (EGI-InSPIRE JRA1) The messaging infrastructure should be more reliable (SAM, Accounting in the future) –QR7: upgrade to ActiveMQ 5.5 allowing load distribution across the broker instances, reliability of message delivery (TTL = 3 days), automatic clearing of inactive connections 6

EGI-InSPIRE RI WP2 – support tools/ cont Provide an easy way to define new service types  now supported in GOCDB The Accounting Portal should have a better API and show more users data –XML datafeeds available on tree views in Accounting Portal release Electra 4.2 (10 May) –Also addressing RT requirement Provide a better integration of GOCDB and OIM through a uniform interface –Discussions in progress with OSG (EGI Community Forum) –GOCDB exposing information in GLUE 2.0 format The GOCDB/OIM information should be better kept up to date 7

EGI-InSPIRE RI WP2 – underlying services/cont Improve the security and scalability of the messaging services –Authenticated connections by end of 2012 (see milestones 2012)see milestones 2012 Improve the reliability and the availability of the messaging services –See previous comments on reliability –Availability: central EGI messaging infrastructure will be soon under central SAM monitoring 8

EGI-InSPIRE RI WP2 – underlying services/cont Improve the stability, accuracy, validity of the information services –Stability: several BDII improvements (site/top) recently released in EMI 1 tested in EGI staged rollout and distributed through UMD –Caching released in EMI 1 (default: 12 hours) –Top-BDII availability being reported from Jan 2012 –Series of workshop for publishing of ARC, globus and UNICORE information in BDII –GLUE 2.0 migration –Accuracy and validation: several requirements submitted to EMI during 2011, waiting for EMI 2 release 9

EGI-InSPIRE RI WP2 – underlying services/cont Provide a long term solution for a scalable and open source batch system –SLURM support in CREAM requested in 2011 –Create interest groups (e.g. GE, SLURM) to facilitate community support Provide adequate support for the batch systems currently in use in WLCG –2 nd level support effort being reallocated within EGI to cover batch systems (currently relying on best effort) 10

EGI-InSPIRE RI For discussion Provide a reliable way to publish VO-specific service downtime information –EGI-InSPIRE JRA1 discussions of feasibility –More information on the use case needed 11

EGI-InSPIRE RI SAGrid EGI/SAGrid MoU signed in Sep 2011MoU Integration started in Aug 2011 (GGUS 73185), on-hold for several months, but now almost completed –Operations Centre Certification procedure (PROC02)PROC02 12

EGI-InSPIRE RI References Overview of recent GOCDB developmentsOverview Tool deployment plans 2012deployment plans 2012 Operations plans 2012Operations plans 13