Presentation is loading. Please wait.

Presentation is loading. Please wait.

EGI-InSPIRE RI-261323 EGI-InSPIRE EGI-InSPIRE RI-261323 Information system workshop Stephen Burke egi.eu EGI TF Madrid September.

Similar presentations


Presentation on theme: "EGI-InSPIRE RI-261323 EGI-InSPIRE EGI-InSPIRE RI-261323 Information system workshop Stephen Burke egi.eu EGI TF Madrid September."— Presentation transcript:

1 www.egi.eu EGI-InSPIRE RI-261323 EGI-InSPIRE www.egi.eu EGI-InSPIRE RI-261323 Information system workshop Stephen Burke egi.eu EGI TF Madrid September 18 th 2013

2 www.egi.eu EGI-InSPIRE RI-261323 Introduction 90-minute session Focus is on the status of GLUE 2 Time is limited, so just short updates –Times are indicative but speakers are asked to be concise Some time for questions Info system workshop - EGI TF Madrid2

3 www.egi.eu EGI-InSPIRE RI-261323 Timetable 11:00 Introduction and status update (Stephen Burke) 11:20 GLUE 2 validation (Maria Alandes Pradillo) 11:40 GLUE 2 support in gLite data management (Maria Alandes Pradillo obo Oliver Keeble) 12:00 Unicore BDII integration (Shiraz Memon) 12:15 GLUE 2 support for Globus services (Ilya Saverchenko) 14:30 GOCDBv5 Overview and New Features (David Meredith) Info system workshop - EGI TF Madrid3

4 www.egi.eu EGI-InSPIRE RI-261323 GLUE 2 status All EGI sites now publish GLUE 2 –Last few sites ticketed and fixed in February –OSG sites are not published EGI profile document finalised in JuneEGI profile document –Detailed semantics, use cases, validation rules etc –Presented in PraguePresented –Comments and responses on the doc page –May need a small update for storage systems Info system workshop - EGI TF Madrid4

5 www.egi.eu EGI-InSPIRE RI-261323 Service publication All gLite services now published in GLUE 2 –CREAM, WMS, LB, AMGA, Hydra, BDII site/top, VOMS, Argus, MyProxy, LFC, FTS –Also LCG VOBOX and message broker Storage systems: DPM, dCache and StoRM –Still need some work (see Maria’s talk) –CASTOR, BeStMan and xrootd missing ARC, Unicore and Globus publication available –Talks later for Unicore and Globus –ARC integration with recent top BDII release Publication in progress for QCG Info system workshop - EGI TF Madrid5

6 www.egi.eu EGI-InSPIRE RI-261323 Validation Maria will talk in detail about GLUE 2 validation Many bugs submitted to developers –Most fixed already –GLUE 1 information has also improved GLUE 2 publication is now part of the middleware acceptance criteria Info system workshop - EGI TF Madrid6

7 www.egi.eu EGI-InSPIRE RI-261323 Clients WMS and GFAL/lcg-utils upgraded to use GLUE 2 information –Still needs testing Replacement for lcg-info(sites): ginfoginfo –Now in EPEL gstat is being upgraded for GLUE 2 Can provide LDAP queries on request! –project-grid-info-support@cern.chproject-grid-info-support@cern.ch Info system workshop - EGI TF Madrid7

8 www.egi.eu EGI-InSPIRE RI-261323 Other activities GLUE 2 extensions for clouds being developed in the Federated Cloud context Publication for GPGPUs –Workshop on MondayWorkshop Many core/whole node scheduling –WLCG activity, seems to have gone quiet WLCG registry –Central database to collect information from various sources including BDII and GOC DB OGF WG session yesterday –XML, LDAP and JSON renderings –Downloadable lists for enumerated types Info system workshop - EGI TF Madrid8

9 www.egi.eu EGI-InSPIRE RI-261323 Next steps Put the Nagios validation into production Clarify the publication for storage systems –And update the code if necessary Test the GLUE 2 support in the WMS and data management tools Get the publication for non-gLite middleware into production Encourage people to use it! Info system workshop - EGI TF Madrid9


Download ppt "EGI-InSPIRE RI-261323 EGI-InSPIRE EGI-InSPIRE RI-261323 Information system workshop Stephen Burke egi.eu EGI TF Madrid September."

Similar presentations


Ads by Google