Biomethane connections – current developments Biomaster Network Meeting Norwich 11 th November 2011 David Pickering.

Slides:



Advertisements
Similar presentations
Scoping the Framework Guidelines on Interoperability Rules for European Gas Transmission Geert Van Hauwermeiren Workshop, Ljubljana, 13 Sept 2011.
Advertisements

Regional Policy Common Indicators: Energy & Climate Change Definitions and Discussion Brussels, 22 nd November
Auth: Slide 1 Gas Bus Alliance Gas Alliance - Copyright 2011 Gas Bus Alliance Biomaster 2 nd Consortium Meeting Wed 30 th Nov.
1st Network Meeting Introduction Mark Allen, Assistant Director, Environment and Waste, Norfolk County Council 11th November 2011.
BREAKOUT SESSION 2 Smart Grid 2-B: Grid Integration – Essential Step for Optimization of Resources Integrating Intermittent Wind Generation into an Island.
CAPACITY BUILDING TOWARDS KNOWLEDGE BASED ECONOMY Project financed by Austrian Development Cooperation PARTNERSHIP WITH FOREIGN COMPANIES David Banks,
Gas Laws.
8. Maring Fag Dag - Using marine offcuts to penetrate the high value nutrition market 29. November 2012.
14 June 2011 Integrating biogas in the regional gas grid.
EU Developments Transmission Workgroup 3rd November 2011.
Mod 0508 Revised Distributed Gas Charging Arrangements  Proposed change to take into account that flows from DN Entry points to DN Supply Points should.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Slovenia: Installation of two Refuelling Stations (HRS) Investor: Centre of Excellence for low-Carbon Technologies. Project objective: Setting up of two.
EU Developments Transmission Workgroup 6th October 2011.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
The Anaerobic Digestion and Biogas Association Gas to Grid Issues.
Transparency Board 6 September 2011 Defra / Environment Agency presentation to Transparency Board Miles Parker, Defra: Deputy Chief Scientific Advisor,
Biogas typically refers to a gas produced by the biological breakdown of organic matter in the absence of oxygen. Biogas is comprised primarily of methane.
Integration of CHP Into Waste Water Treatment Processes London 5 th November 2014 Peter Bense.
BV Dairy. BV Dairy - General Manufacturers of specialist dairy products based in Shaftesbury, North Dorset. Established in 1958 and are an independent,
Supply – Chain - Opportunities
Biomethane Roadmap in Hungary Wien, AGCS AG, February 27, 2015 Kornél L. Kovács Hungarian Biogas Association.
Waste Management in Devikulam Village Youngky Panjaitan and Boris Lazarov.
Oxy Enrich Process for Capacity Enhancement of Claus Based
Slide 1 Introduction to Renewable Energy Technologies Rural Cumbria Connects Consortium.
Gross capacity of the unit is 26 lakh liters of waste water per day It is working at 70% of the installed capacity, treating 15 lakh liters per day There.
Energy Sources By Morgan Barrow. Fossil Fuels Fossil fuels are created from dead plants and animals along with heat and pressure. Since there's no oxygen.
EUREEURE Kalliopi Adamidou General Director Environmental Centre of Kozani EURE (Europe Use of Renewable Energy) Krakow 5-8 November 2007 “ Installation.
Network Analysis - Introduction Transmission Planning Code Workshop 2 1 st May 2008.
1 Packaging bio- methane connections for the future Dan Anderson CEng 11 th January 2012.
HOW TO OVERCOME ANAEROBIC DIGESTION TECHNICAL LIMITATIONS ULTRASOUND 18 th European Biosolids & Organic Resources Conference & Exhibition th November.
Entry Capacity Release Methodology Statement Transmission Workstream, 4 th May 2006.
Ofgem Review Group on Energy Market Issues for Biomethane Projects (EMIB) Gas Quality Analysis at Biomethane Entry REA Biogas Group the voice of the UK.
Anaerobic Digestion – a demonstration programme under the Environmental Transformation Fund 3 rd and 4 th September 2008.
Didcot Biomethane to Grid project Learning Points SGN and CNG Services Ltd (CSL)
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
MAKING CONNECTIONS LAB SACCONE POWERPOINT Pulse rate per minute (range of averages 90 Number of students in this range Per 1.
And the Technologies to use it. Tina Kaarsberg, PhD House Science Committee, Energy Subcommittee For For Producing Energy:
KARADUVAR WASTEWATER PURIFICATION PLANT MERSİN. Karaduvar Wastewater Purification Plant is designed for purification of the wastewater from carbon, nitrogen.
Rpsgroup.com/Ireland Food for Thought Technology Advances Adrian Thompson CIWM & DoENI Consultation Seminar 15 November 2013.
A layman’s guide to the structure of LDZ gas charges 27 July 2009 Please note – in the interests of clarity and accessibility, simplifications have been.
Biomethane and the Renewable Heat Incentive Andy Morrall Manager – Non-domestic RHI 27/01/
Institute of Chemical Engineering page 1 Achema 2012 Thermal Process Engineering Martin Miltner, Aleksander Makaruk, Ass.Prof. Michael Harasek
Development Of Filling Station Deign and developed efficient, optimize digester Development of Low weight filling Tank Development of the Bio Gas kit.
Flow Margin Assumptions for NTS Planning and Development Transmission Planning Code Workshop 3 5 th June 2008.
By Hugo Sarmiento UP 206A.  Distributed energy resources are small-scale power generation technologies located close to where electricity is used (e.g.,
Technical Advisory Group Tuesday 6 October 2009 Tony Pearson Network Planning Manager.
SmartGrids for e-mobility Connecting electric vehicles to the local grid BEAMA 2011 Roger Hey Energy Projects Manager Central Networks 1.
Mine Fresh Air Base.
IEA Bioenergy Conference 2015 UK Biomethane Market Update 50 Plants Injecting Gas by End th October 2015 John Baldwin Managing Director CNG.
Biomethane roadmap for Austria Austrian Compost & Biogas Association.
Mod 0273: Governance of Feasibility Study Requests to Support Changes to Network Exit Agreements – National Grid NTS Response.
Ofgem Information Request on availability of NTS Exit Flexibility Capacity Ritchard Hewitt Gas Code Development Manager National Grid Transmission 7 th.
Ofgem Review Group on Energy Market Issues for Biomethane Projects (EMIB) Update on Issues REA Biogas Group the voice of the UK Biogas industry since 2004.
Energy Market Issues for Biomethane Projects Workshop - 31 October 2011 RIIO-GD1 Environmental Incentives.
Eco Sustainable Solutions Limited Piddlehinton AD Facility.
UNIT 1 ROUTERS Cambridge Technicals. Routers You need to explain the function of a ROUTER in how computers connect to the internet and to networks in.
Biomass to biomethane a walkthrough of bio methane grid injection.
Biogas Digester Jeff Rohrer APES March 19, 2012.
PARCA Demonstration Data Information Flow Diagram Footnote:- No set timescales – timescales will be agreed by the Project Team Phase 0 Phase 1 Phase 2.
Summary Why Biomethane Support for biomethane What is biomethane
ANDREW EDNEY MANAGER COMMERCIAL SERVICES
Multiplication Tables
الإقراض وتحليل الإئتمان ( 10)
Place image in this area.
Linepack ‘Park and Loan’ Quantity – Scenario Analysis
Biomethane in NL: the Dutch approach
Pricing and Margins Manager National Grid Distribution
A feasible solution for problem 2.
Presentation transcript:

Biomethane connections – current developments Biomaster Network Meeting Norwich 11 th November 2011 David Pickering

2 Typical biomethane entry facility

3 Getting connected – key issues Location of gas grid compared to Anaerobic Digestion plant? Does the gas grid have capacity? The GDN will provide an indication free of charge but to confirm this, a chargeable Feasibility Study will be required What grid pressure? Will the gas meet the grid specification? Key issue is Oxygen concentration – requirement is <0.2% Design and Build Agreement Network Entry Agreement

4 Initial Enquiries Telephone : or All we need is a postcode and a flow rate of biomethane

5 What will you receive from an Initial enquiry? Details of the nearest connecting pipe to your site. Pressure tier of connecting pipe. Often multiple options available Volume of gas that can be accepted onto the network and duration of time Scale map of your site and nearest connection

6 Face to face discussion Review of site Review of nearest connecting pipe work Advice on costs Advice on injection equipment Gas specification requirements for grid entry

7 Feasibility Study Network connection options Detailed network modelling and demand forecasting Cost of providing these connections Plant and equipment required to be provided by the customer Major environmental issues and risks Foreseen major engineering difficulties Programme of work required to deliver a connection Other issues relevant to providing a connection

8 Connection issues Responsibility for providing grid connection equipment Provision of capacity Oxygen concentration <0.2% Requirement for propane Gas quality monitoring and energy measurement A number of barriers to entry have been identified, and these are being addressed by a joint industry group convened by Ofgem. See:

9 Responsibility for grid connection equipment The problem Uncertainty around responsibility for and level of costs of connection The solution GDNs to offer choice over who builds and operates (GDN or biomethane producer) GDNs to develop standard plug and play facilities Next steps GDNs to develop specifications for BM connection equipment and interfaces

10 Provision of capacity The problem Low summer demand may mean that the gas grid cannot accept the biomethane on a 365 day basis The solution Install compressor within the grid, to export gas from one pressure tier to the higher pressure one that feeds it, to access remote demand Next steps Field trial to prove concept

11 Oxygen The problem Current Regulations prescribe less than 0.2% oxygen in grid gas – difficult to achieve for BM The solution Short term – individual exemptions for BM plants, combined with blending to achieve 0.2% Longer term – class exemption for BM if HSE can be convinced that there are no material additional risks Next steps GDNs sponsoring work to demonstrate no material risk of pipe corrosion

12 Requirement for propane The problem Biomethane CV is low relative to grid CV, therefore addition of propane is required to avoid triggering CV cap (which would affect consumer bills) -but propane is expensive (capex and opex) The solution Where local conditions allow, BM can be blended with grid gas and CV measured downstream of the blending point – minimise propane input Next steps Needs approval of low-cost CV measuring instruments

13 Remote CV monitoring at Adnams

14 Gas quality monitoring and energy measurement The problem Currently monitoring and metering is very expensive (around £150k) as approved devices relate to large (North Sea scale) flows of gas The solution Revise measuring specs to be more appropriate for small volumes and for less complex gas compositions Next steps EMIB expert group to make recommendations for change in these areas by the end of 2011

15 Conclusions No material technical issues with biomethane grid entry DECC targets for gas to grid and RHI levels have incentivised solutions to be found to remaining barriers to entry Ofgem-convened Energy Market Issues for Biomethane (EMIB) group is currently meeting, with the aim of making recommendations by the end of 2011 for changes to address barriers

Thank you David Pickering Sustainable Gas Development Manager