PRESENTER’S NAME DATE Using Smartphone to carry out Risk Assessment HY/2012/07 – Tuen Mun Chek Lap Kok Link – Southern Connection.

Slides:



Advertisements
Similar presentations
A Joint Code of Practice Objectives and Summary Presentation
Advertisements

MONDAY 17 MARCH 2003 Haivan Pass Tunnel Construction Project CONSTRUCTION PROGRESS February 2003.
Caltrans District 4 EMERGENCY REPLACEMENT STATE ROUTE 128 RUSSIAN RIVER BRIDGE COMMUNITY INFORMATIONAL MEETING March 9,
Hong Kong-Zhuhai-Macau Bridge
Creating a new Lions e-Clubhouse Web site Lions e-Clubhouse Application LionWAP.org/eclub/application.php.
ROUTE 72 BRIDGE IMPROVEMENTS TP 708 Pre-Proposal Meeting May 2, 2008.
Route 29 Western Bypass: Background and Timeline May 13, 2014 John Lynch, P.E. Culpeper District Administrator.
Western Ave S53X Audit  12 th March 2014  7 pm Mantra.
GEOTECHNICAL ENGINEERING Session 07 Subject: S0012 / Introduction to Civil Engineering Year: 2007.
FRED POWELL POWELL & PARTNERS, ARCHITECTS West Contra Costa Unified School District.
3 May 2013 Presented By: Joanna Oborne Councils Powers and Obligations with respect to Driveways.
Bon Voyage: are you ready?. Next Steps Confirm a site visit date with the Team Leader before April 28 Develop curriculum and submit to Team Leader for.
Presented by L.M. Mak 1 The Hong Kong University of Science & Technology Civil Engineering Department – Civl 395 – Project Implementation THE HONG KONG.
Chapter 10 Virtual Private Networks. VPN Defined  A segment of the public network made to appear part of a private network so that it can be used to.
Pawprints of Richmond
Construction Innovation: The Millau Viaduct Deck Launch Paul Eliasson Brian Follweiler.
The Millau viaduct is part of the new E11 expressway connecting Paris and Barcelona and features the highest bridge piers ever constructed. The tallest.
Photo Realistic 3D Cloud of Points
Bridge Engineering Section Bridge Rehabilitation.
Energy surveying qualifications and procedures West Midlands Housing and Energy Conference 2007.
SFOBB East Span Seismic Safety Project San Francisco-Oakland Bay Bridge East Span Seismic Safety Project Pier E9 Following the 1989 Loma Prieta Earthquake.
Procure Plus model 1. Scope 2. Kick start meeting 3. Initial surveys 4. Information for costs 7. Live on e-Procurement 6. Pre-contract meeting 5. Target.
Option #1 - Award Current Contract Fastest route to begin and complete project and achieve seismic safety Award requires funding  Option #2 - Re-bid SAS.
National Capital Region Interoperability Program National Capital Region Interoperability Program (NCRIP) RPWG/ESF Chair Quarterly Report October 31, 2005.
1 9 th Oct Design and Construction of Main & Crescent Bridges.
ALSDE Joint Purchasing Technology Contract  Established state wide contract for participating districts and schools to purchase technology related equipment.
Damage to Bolu Viaduct from Earthquakes in Turkey Euridice A. Oware Advisor: Dr. Mete Sozen.
Progress Photos March Construction Progress Park Station Portal Shaft Excavation 16 March 2007 View towards South 16 March 2007 General views of.
Business & Innovation Assistance Center #SBAHQ-14-C-0012.
ESPLOST Update Savannah-Chatham County Public Schools January 9, 2008.
NOTE: REFERENCE PROJECT MANUAL DATED 1/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO. NO.DATE:
Detroit River International Crossing Project March 31, 2010.
KEY LEARNING from an Electrical Discharge [Dangerous Occurrence] that occurred on Thurs 03 October 2013.
NORTHERN URBAN HIGHWAY MEXICO CITY
IT Cell ,Examination Section
GEOTECHNICAL ENGINEERING Session 07
NorthLink WA Northern Section (Ellenbrook to Muchea) Bullsbrook Residents & Ratepayers Meeting Dominic Boyle – Main Roads Project Manager Carolyn Walker.
Construction Examples in Japan High Capacity Micropile
Date of download: 12/25/2017 Copyright © ASME. All rights reserved.
WINDOW REPLACEMENT PROJECT SECTION EXISTING CONDITION PHOTOS
Key Issues CPOC Update February 2011 Second Avenue Subway TBM Drive #1
E-procurement and SME Inclusion the Harlow Perspective
Make sure your PEFS are Up-to-Date
WESLEYAN P-1-1 MAJOR MAINTENANCE FY CROSS STREET
WESLEYAN P-2-1 MAJOR MAINTENANCE FY CROSS STREET
Follow Management of Change for an activity which is not in permit
Template staged diagramm / Staged plan
SECTION EXISTING CONDITION PHOTOS
Online Training Systems
LPA Monitoring Survey May 16, 2011.
XRN4340 – UK Link Future Release 1.1
Environmental Commitments
SECTION EXISTING CONDITION PHOTOS
PORCH REPLACEMENT PROJECT SECTION EXISTING CONDITION PHOTOS

Flexible & Efficient – Run of Site
Repair roof rafters / joists, soffit and fascia boards in this area.
M E A S U R E ‘G’ P R O G R A M U P D A T E
SECTION EXISTING CONDITION PHOTOS
SECTION EXISTING CONDITION PHOTOS
12 Safe Maintenance Rules
WESLEYAN P-13-1 MAJOR MAINTENANCE FY HOME AVENUE
Thing / Person:____________________ Dates:_________________
Hong Kong-Zhuhai-Macau Bridge
FRONT PORCH REPLACEMENT SECTION EXISTING CONDITION PHOTOS
Gas test before welding
Presented by: Ms VM Rennie Head: Corporate Services
Year of Construction 2007 Serial# S070010
Year of Construction 2007 Serial#: S070009
JLEIC Accelerator R&D Meeting
Presentation transcript:

PRESENTER’S NAME DATE Using Smartphone to carry out Risk Assessment HY/2012/07 – Tuen Mun Chek Lap Kok Link – Southern Connection

©2010 Gammon Construction Limited. All Rights Reserved 2 Site Location Contract No. HY/2012/08 Northern Connection Sub-sea Tunnel Contract No. HY/2012/07 Southern Connection Viaduct Section

©2010 Gammon Construction Limited. All Rights Reserved 3 Scope of Works VIADUCT A VIADUCT B VIADUCT C VIADUCT D VIADUCT E1 VIADUCT E2 VIADUCT E5, E6, E7 & E8 VIADUCT F1 & F2 VIADUCT F3, F4 & F5

©2010 Gammon Construction Limited. All Rights Reserved 4 Viaduct Nos. of Piles Nos. of Piers Nos. of Span Nos. of PC Segments A B C D E E E5, E6, E7 & E F1 & F F3, F4 & F Total Scope of Works

STEP 1 & 2 – SELECT DISTRICT AND LOCATION

STEP 5 – Take Photos

STEP 6 – Confirm Approval or Rejection