BUILDING STRONG ® WELCOME to the 2011 USACE/FEMA Remedial Action Program Workshop December 6-8, 2011 Orlando, FL.

Slides:



Advertisements
Similar presentations
New FEMA Regulations and Guidelines for Disaster Recovery Plans MWMA Fall Summit 2007 Philadelphia, PA.
Advertisements

Todd Geerdes Period 1 WA ME MT ND OR MN WI NY ID SD MI WY IA PA NV NE
U.S. States Abbreviations Directions: Type the state abbreviation in the box on each slide. “The English language website where everything.
Company LOGO U. S. EPA, Region 4 Atlanta, Georgia.
Company LOGO U. S. EPA, Region 4 Atlanta, Georgia.
Open Water Certification Count
WA 2.ID 3.MT 4.OR 5.CA 6.NV 7.UT 8.WY 9.CO 10.AZ 11.NM 12.AK 13.HI 13 The West`
Module 30 Homeland Security and Civil Emergency Management Civil Works Orientation Course - FY 11.
In Case of Emergency Take a Deep Breath and then your pulse As long as you have both, relax.
Hurricane Isaac X X X ◘ Isaac began as a tropical wave on August 16 th off the coast of Africa & was classified as a tropical storm on August 21 st ◘
OPEN WATER CERTIFICATION COUNT As of Q1, 2015 Compiled from PADI, SDI & SSI Certified Diver Files ©2015 THE DIVING EQUIPMENT & MARKETING ASSOCIATION |
US Army Corps of Engineers BUILDING STRONG ® Overview of Public Law (PL) Advanced Measures Contingency Operations Directorate.
BUILDING STRONG ® USACE/FEMA 2011 Remedial Action Program Workshop December 6-9, 2011 Orlando, FL.
How to win a Presidential Election. The rules of the game Electoral College.
BUILDING STRONG ® USACE/FEMA 2011 Remedial Action Program Workshop December 6-9, 2011 Orlando, FL.
Public Charter Schools: A National Overview Lisa S. Grover, Ph.D., Senior Director, State Advocacy, NAPCS.
Division of Homeland Security & Emergency Management Al Cavallo Brief Disaster Assistance Overview with an emphasis on Tribal Roads Declaration Process.
Southeast Region States Contained in the region: Alabama (AL) Florida (FL) Georgia (GA) Mississippi (MS) Louisiana (LA) Arkansas (AR) Tennessee (TN)
Readiness and Homeland Security Workshop Streamer Requirements Update And USACE Response Capabilities.
Dam Hazard Consequences Assessment
Geography Bee Meeting 3: United States Cities and Landforms (While you wait, please insert your microphones and adjust your volume.)
1 Value of Construction Put in Place (VIP) Recent Trends March 2006 (all-time high of $1.213 trillion) – July 2009 ($958.0 billion)
FEMA Programs I Session Name: FEMA Programs I Coastal Hazards Management Course Slide 31.1.
US Army Corps of Engineers BUILDING STRONG ® Debris Management Mobile District.
BUILDING STRONG ® USACE/FEMA 2011 Remedial Action Program Workshop December 6-9, 2011 Orlando, FL.
US Army Corps of Engineers BUILDING STRONG ® US Army Corps of Engineers BUILDING STRONG ® USACE / FEMA Remedial Action Program (RAP) Workshop.
Pennsylvania Emergency Management Agency 2012 USACE Flood Risk Management & Silver Jackets Workshop Harrisburg Hilton August 21, 2012 Glenn M. Cannon,
Open Water Certification Count
Tropical Storm Lee Travis Gaska. Tropical Storm Lee’s information Developed in the Gulf of Mexico on the first of September. Became a Tropical storm on.
Houston Area: Baltimore (81) Baltimore (81) Boston (48) Boston (48) Pittsburgh (56) Pittsburgh (56) San Francisco (47) San Francisco (47) Denver (153)
CBO Projected Hurricane Economic Damage Report Assessing the Projected Economic Damage Caused By Hurricanes and Why It Will Increase June 6, 2016 Producer:
US Army Corps of Engineers BUILDING STRONG ® 2011 Flood Recovery The Benefits of Collaboration Maria de la Torre Chief, Emergency Management Baltimore.
US Army Corps of Engineers BUILDING STRONG ® Flood Fighting and Planning US Army Corps of Engineers Omaha District Joel Ames Tribal Liaison.
National Journal Presentation Credits Producers: Katharine Conlon Director: Afzal Bari House Committee Maps Updated: March 19, 2015.
Evacuation Procedures City Council October 20, 2015.
BUILDING STRONG SM Revitalizing and Expanding Partnerships Charles E. Shadie, P.E. Senior Hydraulic Engineer Mississippi Valley Division U.S. Army Corps.
Looking for aberrant records
1 Washington, WA 2 Oregon, OR 3 California, CA 4 Arizona, AZ 5 Nevada, NE 6 Utah, UT 7 Idaho, ID 8 Montana, MT 9 Wyoming, WY 10 Colorado, CO 11 New Mexico,
Update on Mission: Lifeline Boston University Medical Center
Mark Glerum – Sales Director
Medicaid Enrollment of New Eligibles in Expansion States, by Party Affiliation of Governor New Eligibles as a Percent of Total Medicaid Enrollment, as.
Medicaid Enrollment of New Eligibles in Expansion States, by Party Affiliation of Governor New Eligibles as a Percent of Total Medicaid Enrollment, as.
House price index for AK
Public Power in Florida Mutual Aid and Storm Readiness
Train-the-Trainer Sessions 379 sessions with 11,183 participants
Human Resources Regional Captain Map
U.S. FEDERAL CIRCUITS Cir State 11 Alabama AL
Non-Citizen Population, by State, 2011
Remedial Action Program Workshop
WY WI WV WA VA VT UT TX TN1 SD SC RI PA1 OR OK OH ND NC NY NM NJ NH2
WY WI WV WA VA VT UT TX TN1 SD SC RI PA OR OK OH1 ND NC NY NM NJ NH NV
Mobility Update and Discussion as of March 25, 2008
Current Status of the Medicaid Expansion Decision, as of May 30, 2013
Train-the-Trainer Sessions 362 sessions with 10,873 participants
LEARNING YOUR 50 STATES (with Postal Codes)
Train-the-Trainer Sessions 392 sessions with 11,432 participants
Ohio Oklahoma Oregon What’s the capital city? What’s the abbreviation? Where is it located? Columbus What’s the capital city? What’s the abbreviation?
United States of America.
(map is coded by CAE-CD region)
Tennessee Texas What’s the capital city? What’s the abbreviation? Where is it located? Nashville What’s the capital city? What’s the abbreviation?
Market Share of Two Largest Health Plans, by State, 2006
Percent of Children Ages 0–17 Uninsured by State
Train-the-Trainer Sessions 402 sessions with 11,649 participants
Current Status of State Medicaid Expansion Decisions
Train-the-Trainer Sessions 402 sessions with 11,649 participants
Percent of Adults Ages 18–64 Uninsured by State
Train-the-Trainer Sessions 401 sessions with 11,639 participants
Human Resources Region Captain Map
Human Resources Region Captain Map
Train-the-Trainer Sessions 436 sessions with 12,254 participants
Presentation transcript:

BUILDING STRONG ® WELCOME to the 2011 USACE/FEMA Remedial Action Program Workshop December 6-8, 2011 Orlando, FL

BUILDING STRONG ® 2011 USACE/FEMA RAP Workshop USACE Executive Overview Director, Contingency Operations and Homeland Security HQUSACE

BUILDING STRONG ® USACE All-Hazards Performance Improvement RAP Workshop Problems Defined and Courses of Action Developed Remedial Action Plan Teams Established Concepts and Plans Developed Exercises and Events Evaluation: Data Collection/Initial Analysis Issues Lessons Training SOPs Revised SOPs Updated USACE Remedial Action Program Issues SLS

BUILDING STRONG ® 4 Focus Sessions: External Temporary Emergency Power Commodities/Water/Logistics Temporary Housing Debris Management Infrastructure Technical Assistance Internal Flood Response Operations Recovery Field Office (RFO) Operations 2011 USACE/FEMA RAP Workshop

BUILDING STRONG ® Overseas Contingency Operations & International Humanitarian Disaster Response Tornadoes Hurricanes / Tropical Storms / Earthquakes/Wildfires/October Snow Storm The “Great Floods of 2011” An Epic Year!

BUILDING STRONG ® USACE OCONUS Assistance Australia  2 man flood risk management team deployed March 2011  Developed plans for airfield ops during flood event, and future planning & design considerations  Provided analysis to Queensland Reconstruction authority New Zealand  7 man team deployed 28 Mar – 5 April  Structural & demolition assessment in Christchurch, NZ  Assessed over 40+ buildings for both structural safety & demolition requirements

BUILDING STRONG ® USACE OCONUS Assistance Palau  Four man power team deployed on 20 NOV to 2 DEC 2011  Assessed and provided recommendations for the water and waste water treatment facility and the Aimeliik Power Plant. Thailand  Three man team deployed NOV 11  Dewatering assessment at the Don Muang Airport in Bangkok, Thailand  Inspected the airport and determined the functionality of de-watering equipment.

BUILDING STRONG ® Northeast Snow Storm Rockland City, Upstate NY Staten Island, NY Massachusetts Staten Island, NY Graniteville, NY Newton, NJ Glastonbury, CT

BUILDING STRONG ® Tropical Storm Lee Lafitte, LA (3 September 2011) West End section of New Orleans Louisiana Coast Lafitte, LA (4 September 2011) Lafitte, LA (3 September 2011) Orange Beach, AL Satellite Image of Tropical Storm Lee Southern Louisiana

BUILDING STRONG ® Hurricane Irene Ascutney Mill Dam on Kennedy's Pond in Windsor, Vt Tornado Lewes, Del Tornado Sandbridge, VA Waitsfield, VT South Hampton, NY Washington, DC Hattaras Island, NC Prime Hook National Wildlife Refuge Del Washington, DC Norfolk, VA Ocean City, MD Providence, RI New Bern, NC

BUILDING STRONG ® North & South Dakota Flooding Response Souris River Basin, ND Minot, ND

BUILDING STRONG ® Tornado Damage Tuscaloosa, AL Joplin, MO

BUILDING STRONG ® icri11.ppt 13 Mississippi River World’s 3 rd Largest Watershed Drainage basin for 41% of the United States

BUILDING STRONG ® 14

BUILDING STRONG ® 2011 Spring Flooding Missouri River Basin Snowpack peaked late, 135 to 140 % of normal, and has only just begun to runoff Huge rain event over the past two weeks – % of normal Reservoirs full, timing of the snowmelt runoff and reservoir releases is critical USACE providing Advance Flood Fight Measures in ND, SD, MT, WY, NE, and numerous tribes Columbia River Basin

BUILDING STRONG ® USACE Executive Overview

BUILDING STRONG ® USACE Executive Overview 2011 USACE National Events Total personnel deployed to support CONUS response activities: 2490 Total FEMA mission assignments: 176 ($630 million) Total FCCE dollars: $180 million

BUILDING STRONG ® USACE Executive Overview 2011 USACE International Events Total personnel deployed to support CONUS response activities: 18 for natural disasters, 1405 for military contingency operations. Total dollars on international response assignments: $423k (not including military contingency operations)

BUILDING STRONG ®

 Critical repairs – as needed for next flood season  System Performance & Evaluation – a post-flood assessment of the overall performance of the system  Operational Assessment – restore full functionality of the system Where Do We Go From Here?