August 27, 2006R. Garoby Introduction 5 GeV version of the SPL Scenarios for accumulation and compression Conclusion SPL-BASED 5 GeV PROTON DRIVER.

Slides:



Advertisements
Similar presentations
ISS meeting, (1) R. Garoby (for the SPL study group) SPL-based Proton Driver for Facilities SPL-based Proton Driver for Facilities at CERN:
Advertisements

Proton / Muon Bunch Numbers, Repetition Rate, RF and Kicker Systems and Inductive Wall Fields for the Rings of a Neutrino Factory G H Rees, RAL.
2nd EuroNu Plenary Meeting Review of CERN Proton Driver bunch compression studies 02/06/2010M.M. - EUROnu1.
Participants WP3total Imperial College CERN STFC University Warwick CRNS University Oxford6 6 Total Euro  - WP3.
Task Force on Project X for Muon Collider Keith Gollwitzer Accelerator Division Fermilab.
Catalina Island Meeting May, Proton Drivers for Neutrino Factories: The CERN Approach Presented by B. Autin, CERN.
Project X – MAP Task Force Keith Gollwitzer Accelerator Division Fermilab Project X Collaboration Meeting Oct 25, 2011.
30 June 2008M. Dracos, NuFact081 Challenges and Progress on the SuperBeam Horn Design Marcos DRACOS IN2P3/CNRS Strasbourg NuFact 08 Valencia-Spain, June.
Thomas Roser Snowmass 2001 June 30 - July 21, MW AGS proton driver (M.J. Brennan, I. Marneris, T. Roser, A.G. Ruggiero, D. Trbojevic, N. Tsoupas,
(ISS) Topics Studied at RAL G H Rees, RAL, UK. ISS Work Areas 1. Bunch train patterns for the acceleration and storage of μ ± beams. 2. A 50Hz, 1.2 MW,
Plans for the upgrade of the CERN complex of proton accelerators Plans for the upgrade of the CERN complex of proton accelerators R. Garoby Content Content.
R.G. – 17/03/2003 MORIOND Workshop The SPL* at CERN OUTLINE  Why ?  How ?  Roadmap  Summary * SPL = Superconducting Proton Linac A concept for.
Field and Phase Error Studies in Normal Conducting Structures LLRF and Beam Dynamics in Hadron Linacs – EuCARD2 Workshop Ciprian Plostinar
LINAC4 STATUS Alessandra M. Lombardi for the LINAC4 team 1.Motivation and goals 2.Status of Linac4 2 years after official start of the project ( )
Chopping Simulations Results M. Garcia Tudela, JB. Lallement, PA. Posocco, A. Lombardi, G.Bellodi, M. Eshraqi, E. Sargsyan, L. Hein 1 17/06/2010.
22/03/1999A.Blas1 Hollow bunches A. Blas, S. Hancock, S. Koscielniak, M. Lindroos, F. Pedersen, H. Schonauer  Why: to improve space charge related problems.
3 GeV,1.2 MW, Booster for Proton Driver G H Rees, RAL.
Proton Driver Status ISIS Accelerator Division John Thomason.
Brookhaven Science Associates U.S. Department of Energy AGS Upgrade and Super Neutrino Beam DOE Annual HEP Program Review April 27-28, 2005 Derek I. Lowenstein.
Fermilab, Proton Driver, Muon Beams, Recycler David Neuffer Fermilab NufACT05.
Parameters of 2 nd SPL feasibility study A.M.Lombardi (reporting for the working group)
Proton Driver at Fermilab Keith Gollwitzer Accelerator Division Fermilab IDS-NF 7 th Plenary Meeting Oct 17-19,2011.
Related poster [1] TPAG022: Slow Wave Electrode Structures for the ESS 2.5 MeV Chopper – Michael A. Clarke-Gayther Status Funding bids have been prepared.
Proton Driver: Status and Plans C.R. Prior ASTeC Intense Beams Group, Rutherford Appleton Laboratory.
LAGUNA meeting September , 2010 CAES – CNRS – Aussois - FRANCE Prospective Proton Drivers for neutrino facilities at CERN 8/09/2010 R. Garoby.
F Project X Overview Dave McGinnis October 12, 2007.
EDM2001 Workshop May 14-15, 2001 AGS Intensity Upgrade (J.M. Brennan, I. Marneris, T. Roser, A.G. Ruggiero, D. Trbojevic, N. Tsoupas, S.Y. Zhang) Proton.
1 Design of Proton Driver for a Neutrino Factory W. T. Weng Brookhaven National Laboratory NuFact Workshop 2006 Irvine, CA, Aug/25, 2006.
June 23, 2005R. Garoby Introduction SPL+PDAC example Elements of comparison Linacs / Synchrotrons LINAC-BASED PROTON DRIVER.
Linac4 and SPL Linac4 and SPL R. Garoby for the linac team.
January 5, 2004S. A. Pande - CAT-KEK School on SNS MeV Injector Linac for Indian Spallation Neutron Source S. A. PANDE.
R.G. 7/09/20101 Options for neutrinos. R.G. 7/09/20102 Conventional beam from the SPS (1/3) Neutrinos using the SPS Nominal CNGS 732 km baseline from.
12/10/05NuPAC – CERN 2005M. Benedikt 1 Potential future proton beam performance at CERN for HIE ISOLDE, n_TOF phase 2 and EURISOL Michael Benedikt AB Department,
PROTON LINAC FOR INDIAN SNS Vinod Bharadwaj, SLAC (reporting for the Indian SNS Design Team)
1 PS Days - Evian / MV The SPL : a High-Power Superconducting H – Linac at CERN  Motivations  Applications  Design features  Improvements.
Proton Source & Site Layout Keith Gollwitzer Accelerator Division Fermi National Accelerator Laboratory Muon Accelerator Program Review Fermilab, August.
Fermilab and Muons Proton Driver (for ν-Factory, μ + -μ - Collider, …) David Neuffer Fermilab.
LINAC4 and the Upgrade of the LHC Injector Complex R. Garoby 26 February, 2013.
Proton Driver / Project X Keith Gollwitzer Fermilab August 30, 2012.
The Introduction to CSNS Accelerators Oct. 5, 2010 Sheng Wang AP group, Accelerator Centre,IHEP, CAS.
H. Haseroth Friday, August 31, 2001 MUG Meeting 1 Overview of the CERN Neutrino Factory Machine Studies H. Haseroth for the Neutrino Factory Working Group.
Lecture17(Course Summary).PPT - E. Wilson - 3/3/ Slide 1 COURSE SUMMARY A Design Study of a Compressor ring for A Neutrino Factory MT 2009 E. J.
Status of Project X Keith Gollwitzer Accelerator Division Fermilab MAP Winter Meeting - March 1, 2011.
ESGARD – OMIA 10 & 11/09/2007 JRA on Sc cavities and Cryomodule for a Pulsed proton Linac Motivation Work Packages Partners & resources R. Garoby for S.
NuFACT06 Muon Source at Fermilab David Neuffer Fermilab.
Proton Source Reference Notes for mu2e at Fermilab 1 Section 1: Compilation of parameters describing the existing Fermilab accelerator complex and the.
Longitudinal aspects on injection and acceleration for HP-PS Antoine LACHAIZE On behalf of the HP-PS design team.
HP-PS beam acceleration and machine circumference A.LachaizeLAGUNA-LBNO General meeting Paris 18/09/13 On behalf of HP-PS design team.
Neutrino Factory by Zunbeltz, Davide, Margarita, Wolfgang IDS proposal.
Presenter : Yang Wu McMaster University Work conducted at IHEP.
Project X as a Muon Facility Platform Keith Gollwitzer Fermilab Accelerator Advisory Committee November 7-9, 2011.
FFAG Studies at BNL Alessandro G. Ruggiero Brookhaven National Laboratory FFAG’06 - KURRI, Osaka, Japan - November 6-10, 2006.
Proton Driver Developments and the Neutrino Factory Christopher R Prior ASTeC Intense Beams Group STFC Rutherford Appleton Laboratory, U.K.
UK Neutrino Factory Conceptual Design
Proton Driver Scenarios at RAL and CERN
Towards a Common Proton Driver for a Neutrino Factory
Linac4 Beam Characteristics
Plans for a Superconducting Proton Linac at CERN
Acknowledgments: LIU-PT members and deputies, H. Bartosik
1- Short pulse neutron source
Injector Chain General and more about p-RCS
Superbeams with SPL at CERN
Injector Chain General and more about p-RCS/i-RCS
Progress towards Pulsed Multi-MW CERN Proton Drivers
Collective Effects and Beam Measurements in Particle Accelerators
A Design Study of a Compressor ring for
Generation of Higher Brightness Beams for LHC
The SPL-based Proton Driver at CERN
General Issues for a Multi-MW driver
JLEIC ion fullsize booster (2256m) space charge limit (Δν=0
Presentation transcript:

August 27, 2006R. Garoby Introduction 5 GeV version of the SPL Scenarios for accumulation and compression Conclusion SPL-BASED 5 GeV PROTON DRIVER

27/08/2006R.G.2 Introduction (1/5) Today’s characteristics and design of the SPL have been summarised in a recent publication [CERN available on the CERN Document Server] Conceptual design of the SPL II : A high-power superconducting H - linac at CERN Baylac, MBaylac, M; (LPSC Grenoble) Gerigk, F (ed.); Benedico Mora, E; Caspers, F; Chel, S (CEA Saclay) ; Deconto, J M (LPSC Grenoble) ; Duperrier, R (CEA Saclay) ; Froidefond, E (LPSC Grenoble) ; Garoby, R; Hanke, K; Hill, C; Hori, M (CERN and Tokyo Univ.) ; Inigo-Golfin, J; Kahle, K; Kroyer, T; Küchler, D; Lallement, J B; Lindroos, M; Lombardi, A M; López Hernández, A; Magistris, M; Meinschad, T K; Millich, Antonio; Noah Messomo, E; Pagani, C (INFN Milan) ; Palladino, V (INFN Maples) ; Paoluzzi, M; Pasini, M; Pierini, P (INFN Milan) ; Rossi, C; Royer, J P; Sanmartí, M; Sargsyan, E; Scrivens, R; Silari, M; Steiner, T; Tückmantel, Joachim; Uriot, D (CEA Saclay) ; Vretenar, M;Gerigk, FBenedico Mora, ECaspers, FChel, SDeconto, J MDuperrier, R Froidefond, EGaroby, RHanke, KHill, CHori, MInigo-Golfin, JKahle, KKroyer, TKüchler, DLallement, J B Lindroos, MLombardi, A MLópez Hernández, AMagistris, MMeinschad, T K Millich, AntonioNoah Messomo, EPagani, CPalladino, VPaoluzzi, MPasini, MPierini, PRossi, CRoyer, J P Sanmartí, MSargsyan, EScrivens, RSilari, MSteiner, TTückmantel, Joachim Uriot, DVretenar, M 2006 Geneva : CERN, p

27/08/2006R.G.3 Introduction (2/5) Ion speciesH-H- Kinetic energy3.5GeV Mean current during the pulse40mA Mean beam power4MW Pulse repetition rate50Hz Pulse duration0.57ms Bunch frequency352.2MHz Duty cycle during the pulse62 (5/8)% rms transverse emittances0.4  mm mrad Longitudinal rms emittance0.3  deg MeV Length430m SPL (CDR2) main characteristics

27/08/2006R.G.4 Introduction (3/5) SectionT out [MeV] Nb. of cavities P RF peak [MW] Nb. of klystrons Length [m] Source RFQ31116 Chopper (MEBT) DTL CCDTL SCL Superconducting  = Superconducting  = Total SPL (CDR2) accelerating sections

27/08/2006R.G.5 Introduction (4/5) The low energy part (up to 160 MeV) of the SPL is the subject of the “Linac4” project. A decision is expected by the end of the year.

27/08/2006R.G.6 Introduction (5/5) The SPL is part of a global strategy outlined by the PAF working group for the upgrade of the proton accelerator complex at CERN.

27/08/2006R.G.7 5 GeV version of the SPL SPL (CDR3) characteristics Ion speciesH-H- Kinetic energy5GeV Mean current during the pulse40mA Mean beam power4MW Pulse repetition rate50Hz Pulse duration0.4ms Bunch frequency352.2MHz Duty cycle during the pulse62 (5/8)% rms transverse emittances0.4  mm mrad Longitudinal rms emittance0.3  deg MeV Length535m Increasing the energy of the SPL (CDR2) is obtained by adding 105 m of  =1 superconducting accelerating structures and 14 klystrons [704 MHz – 5 MW].

27/08/2006R.G.8 Scenario for accumulation and compression (1/13) ParameterBasic valueRange Beam energy [GeV] Burst repetition rate [Hz]50? Number of bunches per burst (n)41 – 6 ? Total duration of the burst [ns]~ Time interval between bunches [  s] (t int ) – 16 ? Bunch length [ns] Specifications (from R. Palmer’s conclusion at ISS meeting in RAL on Thursday 27, April 2006) ~ 50/(n-1)

27/08/2006R.G.9 Scenario for accumulation and compression (2/13) Accumulation Duration = 400  s Compression t = 0  s t = 12  s t = 24  s t = 36  s etc. until t = 96  s Accumulator [120 ns pulses - 60 ns gaps] SPL beam [42 bunches - 21 gaps] Compressor [120 ns bunch - V(h=3) = 4 MV] Target [2 ns bunches – 6 times]

27/08/2006R.G.10 Scenario for accumulation and compression (3/13) Mean radius [m] (L A = 74/73 L C )  < 0.02 2T2T ~ 49 f REV [MHz] V RF [V]0 Number of bunches6 Bunch length / gap between bunches [ns]120 / 59 Number of protons per bunches Accumulator Mean radius [m] (L C = 73/74 L A )50 2T2T 5.29 f REV [MHz] h RF 3 f RF [MHz] V RF [MV]4 Number of protons per bunches Compressor

27/08/2006R.G.11 Scenario for accumulation and compression (4/13) Kinetic energy [GeV]5  E Total [MeV] 10 l bunch total [ns] at injection120 Time interval between centres of consecutive bunches [ns] ~ 354 Time interval between transfers [  s] ~ 12 Duration of bunch rotation for 1 bunch [  s] ~ 3 x 12 Number of protons per bunches Bunch characteristics at injection in the compressor Kinetic energy [GeV]5  E Total [MeV] ~ 170 MeV  bunch [ns] at ejection ~ 2 ns Time interval between ejection [  s] ~ 12 Number of bunches6 Duration of full burst to the target [  s] ~ 60 Number of protons per bunches Bunch characteristics at ejection to the target

27/08/2006R.G.12 Scenario for accumulation and compression (5/13) PDAC 2.2 GeV PDAC 5 GeV Improvement factor  Total number of protons per pulse Ring circumference [m] 2  1502  50 3 Number of bunches14461/24 Product1.05 ! Scaling for space charge induced  Q with respect to PDAC (2.2 GeV) Number of bunches Number of protons Beam energy Ring circumference

27/08/2006R.G.13 Scenario for accumulation and compression (6/13) Longitudinal phase space at injection in the compressor Space charge voltage Simulations: C. Carli

27/08/2006R.G.14 Scenario for accumulation and compression (7/13) Longitudinal phase space after 25  s in the compressor Space charge voltage Simulations: C. Carli

27/08/2006R.G.15 Scenario for accumulation and compression (8/13) Longitudinal phase space after 38  s in the compressor Space charge voltage Simulations: C. Carli

27/08/2006R.G.16 Scenario for accumulation and compression (9/13) Longitudinal phase space after 38  s in the compressor Line density  = 1.9 ns Simulations: C. Carli

27/08/2006R.G.17 Scenario for accumulation and compression (10/13) Longitudinal phase space after 38  s in the compressor Line density  = 1.5 ns Tentative use of 2nd harmonic RF (700 kV) Simulations: C. Carli

27/08/2006R.G.18 Alternative scenario for 5 bunches (11/13) Accumulation Duration = 400  s Compression t = 0  s t = 12  s t = 24  s t = 36  s etc. until t = 84  s Accumulator [120 ns pulses - 95 ns gaps] SPL beam [42 bunches - 33 gaps] Compressor [120 ns bunch - V(h=3) = 4 MV] Target [2 ns bunches – 5 times]

27/08/2006R.G.19 Alternative scenario for 5 bunches (12/13) Mean radius [m] (L A = 185/183 L C )  < 0.02 2T2T ~ 49 f REV [MHz] V RF [V]0 Number of bunches5 Bunch length / gap between bunches [ns]120/95 Number of protons per bunches Accumulator Mean radius [m] (L C = 183/185 L A )50 2T2T 5.29 f REV [MHz] h RF 3 f RF [MHz] V RF [MV]4 Number of protons per bunches Compressor

27/08/2006R.G.20 Kinetic energy [GeV]5  E Total [MeV] 10 l bunch total [ns] at injection120 Time interval between centres of consecutive bunches [ns] ~ 354 Time interval between transfers [  s] ~ 12 Duration of bunch rotation for 1 bunch [  s] ~ 3 x 12 Number of protons per bunches Bunch characteristics at injection in the compressor Kinetic energy [GeV]5  E Total [MeV] ~ 170 MeV  bunch [ns] at ejection ~ 2 ns Time interval between ejection [  s] ~ 12 Number of bunches5 Duration of full burst to the target [  s] ~ 50 Number of protons per bunches Bunch characteristics at ejection to the target Alternative scenario for 5 bunches (13/13)

27/08/2006R.G.21 Conclusion Although very preliminary, this analysis gives hope that a scenario can be set-up for meeting the ISS specifications with an SPL based 5 GeV proton driver. A refined analysis is needed that will take into account collective effects. Absolute comparison with other proton drivers will have to take into account:  Pion production and muon capture using the HARP results. The SPL energy could be marginally increased if necessary.  Change of muon capture efficiency with bunch length.  Construction and operation cost.  Technological risk. Relative (“site specific”) comparison will have to include:  Interest for other uses, flexibility, upgrade potential.  Match with local competences, industrial interest, real-estate availability.  Synergy with other work programmes.

27/08/2006R.G.22