1 st GRG meeting, Zagreb, 30 September 2005 Gas Regulatory Group Main issues to be addressed.

Slides:



Advertisements
Similar presentations
4th Poverty Reduction Strategies Forum Athens, June 27 th, 2007 Regional Energy market in Southeast Europe: Prospects and challenges for the SEE countries.
Advertisements

Directorate General for Energy and Transport Next steps in developing the regional energy market in South East Europe European Commission DG Energy and.
Permanent High Level Group meeting Athens, September 9 th, 2003 Towards a Standard Market Design for the SE Europe Electricity Market Prof. P. Capros,
Zagreb, 28 September 2004 The South East Europe gas market: a preliminary analysis of facts and opportunities from the Regulators perspective GAS TASK.
Madrid, 29 th January th RCC Meeting South Gas Regional Initiative.
1 Madrid, 2 nd Nov th IG Meeting South Gas Regional Initiative VI. MIBGAS.
Guidelines for New Gas Infrastructure Investment Regulation in the Energy Community (GGIIR) Basic Criteria Joint working group meeting , Belgrade.
Update on Transparency Obligations Martin Reisner Junior Adviser, Transparency ENTSOGs Transparency Workshop Brussels – 11 September 2012.
1 TITRE Identifying priorities for GRI NW and setting agenda for Menno van Liere Programme Officer GRI NW 11 th Stakeholder Group meeting GRI.
Gas Regional Initiative – North West Region Investment workshop The Hague – 4 June 2010 Investment Project Regional Investment Plans Introduction to methodology.
Future role of GRI NW Stakeholder Group Meeting The Hague, 7 may 2010 Peter Plug Chairman of GRI NW.
Workshop on “Requirements of financial institutions on the financing of gas infrastructure projects, Brussels, Regulatory requirements for new.
The role of ACER In the Regional Initiatives Steve Gordon Head Of the Gas Department North West Regional Initiatives 2011.
Madrid, 6th February nd SG Meeting South Gas Regional Initiative.
Draft Framework Guidelines on Capacity Allocation Mechanisms for the European Gas Transmission Network Benoît Esnault, CRE Presentation Workshop Ljubljana,
Mark van Stiphout – DG TREN – C2 Internal market for electricity and gas The role of TSOs in the third package EUROPEAN COMMISSION GIE conference 7 May.
3 November 2005 GIE Conference Gas Market Developments in SEE Balázs SÁNDOR Chairman GIE ECSEE Study Group Athens - 3 November 2005.
Update on GSE Activities Klaus-Dieter Barbknecht GSE President GIE General Assembly Madrid 21 November 2007.
1 South Gas Regional Initiative Work Plan Raúl Yunta Huete, South GRI Chairman 20 th Madrid Forum Madrid, 26 September 2011.
David Halldearn, ERGEG Conference on Implementing the 3 rd Package 11 th December 2008 Implementating the 3rd Package: An ERGEG Consultation paper.
1 The Regulatory Approach to Fostering Investment David Halldearn Ofgem 28 September 2006.
Global Competitiveness in a Liberalised EU Energy Market Wim Groenendijk, Member of the Board Brussels, 22 November 2011 Gas infrastructure and Markets.
Asta Sihvonen-Punkka Director General of EMA Vice-Chair of ERGEG Baltic Electricity Mini-Forum 24 th of April, 2009 Riga The 3 rd Package – implied changes.
Paris, 16 th March th SG Meeting South Gas Regional Initiative.
1 THE THIRD ENERGY PACKAGE – THE ENERGY COMMUNITY APPROACH Energy Community Secretariat 20 th Forum of the Croatian Energy Association and WEC National.
Achieving a sound investment climate – the role of regulators Boaz Moselle Joint-Chair, CEER Gas Working Group Managing Director – Corporate Strategy Ofgem.
Click to edit Master title style 1 5 th GRI Coordination meeting Brussels, 25 th October 2011.
The European regulatory framework and the role of European Energy Regulators in creating an internal energy market Eric DYEVRE Annual conference of Russian.
Market Design of SE Europe: Reflections from the 3rd Forum on the Way Forward 6 th Permanent High Level Group Meeting Athens, 07 December 2003.
David Halldearn, ERGEG Conference on Implementing the 3 rd Package Brussels, 11 th December 2008 Co-ordination of Decisions at Regional and European level.
Walter Boltz, ERGEG Conference on Implementing the 3rd Package Brussels, 11th December 2008 European Regulators’ Work Programme 2009.
North / North West Region Regional Gas Initiative Regulatory Co-ordination Workshop 8 th February 2007.
How TSOs can further contribute to efficient competition GIE ANNUAL CONFERENCE ATHENS 2005.
Capacity allocation in natural gas transmission networks Framework Guideline (Pilot) Dr. Stefanie Neveling, ACER Workstream Co-Chair Walter Boltz, ACER.
The 3rd package for the internal energy market Key proposals EUROPEAN COMMISSION Heinz Hilbrecht Directorate C - Security of supply and energy markets.
Benoît ESNAULT Commission de Régulation de l’Energie 17th Madrid Forum Madrid, 15 January year network development plan ERGEG recommendations.
GIE Annual Conference, Athens, 3 November 2005 Prospects of a Regional Gas Regulatory Framework Fostering a Sustainable Market-Based Investment Climate.
Bucharest, 24 October 2008 Making the third package work in practice Wolfgang Urbantschitsch, E-Control.
EUROPEAN COMMISSION Heinrich Hick, DG TREN C 2 3rd IEM Package and relevance of GRI GRI NW stakeholder Conference, London, 14 November 2008.
Energy Agency of the Republic of Serbia
XIV th Florence Forum 24/25 September 2007 Tahir Kapetanovic / Nicolas Bonnesoeur Chairmen of the CEER Electricity Security of Supply TF C07-SOS-03-03a.
Madrid, 15th June rd SG Meeting South Gas Regional Initiative.
Madrid, 23rd July rd IG Meeting South Gas Regional Initiative.
XVI th Madrid Forum Madrid, 28 May 2009 Walter Boltz (Gas Working Group Chair) Transparency guidelines and GRI transparency work.
Does the Third Package provide the European TSO associations with the tools necessary to find solutions to the European energy challenge ? Nigel Sisman,
Benoît Esnault Commission de Régulation de l’Energie (CRE) - ERGEG 19th Madrid Forum, March 2011 Preparatory work for Framework Guideline Tariffs.
Gas Regional Initiative Region North-West Transparency Project Nicola Meheran, Ofgem.
3 rd Athens Process Forum /24, Sofia CEER WG SEEER – Regulatory Benchmarking Standards for SEE.
European Commission views on intra-day and balancing markets
The Energy Community C hrissa Argyriou – European Commission – DG Transport and Energy Electricity and Gas
The Energy Community Disclaimer: this not an official document of any of the Parties.
CESEC Energy Community Project Monitoring
Independence and powers of regulators: legal and institutional requirements Heinz Hilbrecht, Director, European Commission World Forum on Energy Regulation.
DRAFT Discussion Paper on the Options for the Transition Phase of the ECSEE Regional Energy Market Donors meeting Vienna, 13 July 2004.
The EU’s Third Energy Package European Code Development UNC Transmission W/S - 4 th December 2008.
BALTIC ELECTRICITY MARKET MINIFORA Vilnius 23 November 2006 Tasks of the summary of the IG discussion paper on the Baltic ITC mechanism Dace Bite Public.
1FTS-CEER bilateral meeting, St Petersburg, 17 May 2011 Peter Plug Chairman of the electricity working group Use and management of interconnections – The.
Madrid Forum 6-7 November 2008 Implementating the 3rd Energy Package: An ERGEG Consultation paper Lord Mogg, ERGEG chairman.
Florence Forum, November 2008 Regulation (EC) 1228/ ERGEG Compliance Monitoring.
Electricity Regional Initiative Central Eastern European Region Convergence & Coherence Sven Kaiser E-Control CEE Stakeholder Group Meeting 7 th November.
IV Athens Forum 3-4 June 2004 Towards a GAS market in the South East Europe Fabio Tambone – Sergio Ascari WG CEER SEEER.
Michael Schmoeltzer Member of ERGEG Gas Working Group GIE Annual Conference, 6/7 May 2009, Groningen ACER & ENTSOG and their interaction.
Gas storage: GB experience and future trends Sonia Brown Director, European Strategy and Environment GSE Conference - May 2007.
10 year investment plan ERGEG approach and contribution
The 3rd package for the internal energy market
New transparency guidelines
2009 TSO Transparency Gas Regional Initiative North-West
Background and Process
Update on European Network Codes
LNG Workshop Bilbao, March 13th 2009 GLE.
Presentation transcript:

1 st GRG meeting, Zagreb, 30 September 2005 Gas Regulatory Group Main issues to be addressed

2 Background… In the beginning of 2005 the establishment of three Gas working groups for SEE was decided: In the beginning of 2005 the establishment of three Gas working groups for SEE was decided: The high level Gas Working Group (EC and governments) The high level Gas Working Group (EC and governments) The Working group on Gas Infrastructure Financing (chaired by the WB, with the participation of GTE, OGP and other industrial stakeholders) The Working group on Gas Infrastructure Financing (chaired by the WB, with the participation of GTE, OGP and other industrial stakeholders) The Gas Regulatory Group (ECSEE Regulators and the EC) The Gas Regulatory Group (ECSEE Regulators and the EC) The GIF group has already had its first meeting in Belgrade last March and is holding its second meeting in Belgrade on 3-4 October 2005 The GIF group has already had its first meeting in Belgrade last March and is holding its second meeting in Belgrade on 3-4 October 2005 It was agreed that the chairman of the GRG will be invited to attend the meetings of the GIF and vice versa It was agreed that the chairman of the GRG will be invited to attend the meetings of the GIF and vice versa

3 Background (cont)… IFIs (especially WB, EBRD) have announced their commitment to financially support gas projects in the SEE region (transmission pipelines, LNG, storage facilities, distribution networks and –possibly- gas fired generation) IFIs (especially WB, EBRD) have announced their commitment to financially support gas projects in the SEE region (transmission pipelines, LNG, storage facilities, distribution networks and –possibly- gas fired generation) The existence of a harmonized, well-defined and stable regulatory framework in the SEE, especially regarding gas infrastructure, is a prerequisite for the provision of the financial support of all regional projects The existence of a harmonized, well-defined and stable regulatory framework in the SEE, especially regarding gas infrastructure, is a prerequisite for the provision of the financial support of all regional projects Compliance with the provisions of the EU legislative framework (Directives and Regulations) and the ECSEE Treaty will be used as a benchmark for financial support by IFIs Compliance with the provisions of the EU legislative framework (Directives and Regulations) and the ECSEE Treaty will be used as a benchmark for financial support by IFIs

4 Background (cont)… WB has announced a feasibility Study on SEE gas economics (existing and anticipated gas market, economics of various regional infrastructure projects) which will be launched very shortly WB has announced a feasibility Study on SEE gas economics (existing and anticipated gas market, economics of various regional infrastructure projects) which will be launched very shortly The EC has distributed a strategy paper for the development of the gas market in the SEE. A second version of the paper is expected The EC has distributed a strategy paper for the development of the gas market in the SEE. A second version of the paper is expected

5 The Scope of the GRG… At this stage, there are two tasks to accomplish: The main priority of this working group is to work on the development of guidelines for the regulation of long- distance gas transmission pipelines in the SEE The main priority of this working group is to work on the development of guidelines for the regulation of long- distance gas transmission pipelines in the SEE PHLG meeting, July 2005: PHLG meeting, July 2005: Protocol on Gas Transmission and Investments Protocol on Gas Transmission and Investments Guidelines for Gas Infrastructure Investment Regulation (GIIR) in Energy Community Guidelines for Gas Infrastructure Investment Regulation (GIIR) in Energy Community Both tasks have been indicated as Output for 2005 The second priority is to work on the strategy for the development of the SEE natural gas market The second priority is to work on the strategy for the development of the SEE natural gas market It is assumed that, following the entry into force of the ECSEE Treaty and the establishment of the ECRB, the tasks of this working group will be transferred to the ECRB (perhaps as a working group of the ECRB?)

6 Guidelines for transit pipelines… Indicative list of issues to be addressed: Indicative list of issues to be addressed: Third Party Access Regime and implementation (including capacity allocation and congestion management) Third Party Access Regime and implementation (including capacity allocation and congestion management) Common approach to possible application of exemptions (Art. 22 of the Directive 55/03/EC) Common approach to possible application of exemptions (Art. 22 of the Directive 55/03/EC) Tariffs Tariffs Balancing regime (including charges) Balancing regime (including charges) Transparency and monitoring Transparency and monitoring Coordination of Regulators (and TSOs) Coordination of Regulators (and TSOs) In parallel, this work should be looked at in relation to the legal framework (national, EU and SEE) In parallel, this work should be looked at in relation to the legal framework (national, EU and SEE)

7 Work on Guidelines for transit pipelines (cont.)… Collaboration with other stakeholders is imperative: Collaboration with other stakeholders is imperative: Gas Infrastructure working group (already established) Gas Infrastructure working group (already established) Gas Industry (has to be organized) Gas Industry (has to be organized) Better information on the possible regional transit projects Better information on the possible regional transit projects Follow-up and input in the gas market economics study Follow-up and input in the gas market economics study Therefore, with the help of the Commission, we need to: Therefore, with the help of the Commission, we need to: Arrange a meeting with industrial stakeholders and TSOs (probably with GTE) to have better insight on their possible plans in the SEE region Arrange a meeting with industrial stakeholders and TSOs (probably with GTE) to have better insight on their possible plans in the SEE region Provide input and feedback to the WB study. It would be very useful for the process if Regulators were kept updated on all stages of the study, even prior to its start. All information included in the study will be part of the input required for assessment by NRAs, especially if applications for exemptions arise in the future Provide input and feedback to the WB study. It would be very useful for the process if Regulators were kept updated on all stages of the study, even prior to its start. All information included in the study will be part of the input required for assessment by NRAs, especially if applications for exemptions arise in the future

8 Work on Natural SEE Gas Market … An initial report on the current state-of-play in the national gas markets of the ECSEE countries has been developed by the Gas TF of the CEER WG SEEER. This report has been approved (with compliments) by the CEER General Assembly and is already available in the CEER Web Site. An initial report on the current state-of-play in the national gas markets of the ECSEE countries has been developed by the Gas TF of the CEER WG SEEER. This report has been approved (with compliments) by the CEER General Assembly and is already available in the CEER Web Site. The EC works on the strategy paper The EC works on the strategy paper We have to define the way of collaboration with the EC on how this WG can contribute to this process We have to define the way of collaboration with the EC on how this WG can contribute to this process ERGEG has already issued a paper on the roadmap for the development of the EU gas market ERGEG has already issued a paper on the roadmap for the development of the EU gas market Since the two processes (in EU and SEE) are parallel, it would be useful to investigate the scope (and the way) of interactions between the two Since the two processes (in EU and SEE) are parallel, it would be useful to investigate the scope (and the way) of interactions between the two

9 Indicative Action Plan for discussion… Next meeting on the guidelines: 3 rd week of October or 2 nd week of November (open to offers on the place). We have to discuss today on how this will be done and who is (are) going to do it Next meeting on the guidelines: 3 rd week of October or 2 nd week of November (open to offers on the place). We have to discuss today on how this will be done and who is (are) going to do it Meeting with industry (early November?): We have to agree with the EC and decide on who would be the counter party (-ies) to such discussions. Perhaps this will also have to wait until the end of the meeting of the Infrastructure working group on the 3 rd and 4 th of October Meeting with industry (early November?): We have to agree with the EC and decide on who would be the counter party (-ies) to such discussions. Perhaps this will also have to wait until the end of the meeting of the Infrastructure working group on the 3 rd and 4 th of October Interaction with the Infrastructure WG (representatives of the chairman will participate to the meeting). Feedback will be disseminated to the members of the GRG Interaction with the Infrastructure WG (representatives of the chairman will participate to the meeting). Feedback will be disseminated to the members of the GRG Follow-up with WB and EC on the SEE gas study (chairman). Updating of the GRG on the evolutions. Follow-up with WB and EC on the SEE gas study (chairman). Updating of the GRG on the evolutions.

10 Indicative Action Plan for discussion (cont.)… Define the corresponding actions (and time table) for the work on the development of the natural gas market in the SEE… Define the corresponding actions (and time table) for the work on the development of the natural gas market in the SEE…

11 Things to keep in mind… The signing of the Treaty in three weeks The signing of the Treaty in three weeks The subsequent establishment of the Regulatory Board (ECRB) The subsequent establishment of the Regulatory Board (ECRB) The provisions of the Treaty, which imply: The provisions of the Treaty, which imply: Involvement of the ECRB Involvement of the ECRB Involvement of ERGEG Involvement of ERGEG Involvement of the EU Council Involvement of the EU Council Involvement of the PHLG and the Ministerial Council Involvement of the PHLG and the Ministerial Council Evolutions on gas in SEE (transit, but not only…) have a great importance for EU Member States. Evolutions on gas in SEE (transit, but not only…) have a great importance for EU Member States. Experience on the field from the EU has to be fully exploited Experience on the field from the EU has to be fully exploited If the work regarding regulation of long distance transmission pipelines is to be adopted as a Measure under the Treaty, then it will have legally binding effects for all ECSEE countries affected by Title III If the work regarding regulation of long distance transmission pipelines is to be adopted as a Measure under the Treaty, then it will have legally binding effects for all ECSEE countries affected by Title IIISo…

12 Conclusion… … We are all facing a big challenge and a lot of work to do and agree on Shall we?