Life cycle cost Objectives

Slides:



Advertisements
Similar presentations
Project Management 6e..
Advertisements

Aircraft Emissions Reductions Through Improved Operations En-Route and Around Terminal Areas Bruno Miller John-Paul Clarke JUP Meeting Princeton University.
Systems Analysis and Design in a Changing World, 6th Edition
Computer Engineering 203 R Smith Project Tracking 12/ Project Tracking Why do we want to track a project? What is the projects MOV? – Why is tracking.
Modern Systems Analysis and Design Third Edition
Project Estimation Describe project scope, alternatives, feasibility.
1 Introduction to System Engineering G. Nacouzi ME 155B.
TECH 101 Product Design and Manufacturing. TECH 1012 System Life-Cycle Engineering 2 Major phases in almost all products and in many cases services –Acquisition.
Estimating Project Times and Costs CHAPTER FIVE Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
1 Practical use of six-sigma for the IATA Fuel Program Tom Fodor Assistant Director E&M.
Cost Analysis of Military Training Marcel C. Smit SAS-095 workshop on Cost-Benefit Analysis of Military Training Amsterdam, The Netherlands 5-6 June 2012.
Copyright 2002 Prentice-Hall, Inc. Chapter 3 Managing the Information Systems Project Modern Systems Analysis and Design Third Edition Jeffrey A. Hoffer.
© 2006 ITT Educational Services Inc. SE350 System Analysis for Software Engineers: Unit 6 Slide 1 Chapter 5 Initiating and Planning Systems Development.
1 EGGC4214 Systems Engineering & Economy Lecture 2 Cost Concepts and Economic Environment.
9 Closing the Project Teaching Strategies
© Copyright QinetiQ Limited Delivering Cost Data to the MoD to Support Business Cases Paul Duvall Deputy Team Manager HVR Practice – Through Life.
Construction Cost Estimating Class #2: Concept Estimating Prof. Ralph V. Locurcio, PE.
SynGenics Corporation 72 E Granville Road Worthington OH ©2003 SynGenics Corporation. All rights reserved. The Use.
Copyright ©2009 by Pearson Education, Inc. Upper Saddle River, New Jersey All rights reserved. Engineering Economy, Fourteenth Edition By William.
State of Maine NASACT Presentation “Using the Business Case to Guide a Transformation Procurement” 1 Using the Business Case to Guide a Transformation.
Cost Factors Chapter Introduction We tend to think of cost estimating relationships (CERs) as complex equations with a number of independent.
System Design Design of UAV Systems Objectives
23-1 Design of UAV Systems Methodology Correlationc 2002 LM Corporation Objectives Lesson objective - Methodology correlation including … F-16 RQ-4A (Global.
Control stations Design of UAV Systems Lesson objective - to discuss
1 ECGD4214 Systems Engineering & Economy. 2 Lecture 1 Part 1 Introduction to Engineering Economics.
UAV Conceptual Design Design of UAV Systems Objectives
© 04/08/20011 Logistics Systems Engineering System Cost Analysis NTU SY-521-N SMU SYS 7340 Dr. Jerrell T. Stracener, SAE Fellow.
1 BCF-215: Course Admin and Overview Course Administration and Overview 10/12/2010.
7-1 Design of UAV Systems Sorties ratesc 2002 LM Corporation Lesson objective - to discuss Sortie rate analysis including … - Mission planning and preparation.
McGraw-Hill/Irwin Copyright © 2006 by The McGraw-Hill Companies, Inc. All rights reserved. Chapter 3 Identification and Selection of Development Projects.
Final report and briefing
Scope Management Copyright © 2013 Pearson Education, Inc. Publishing as Prentice Hall Chapter 5 Learning Objectives After completing this chapter,
Copyright © 2013 Pearson Education, Inc. Publishing as Prentice Hall o P.I.I.M.T o American University of Leadership Ahmed Hanane, MBA, Eng, CMA, Partner.
PLANNING ENGINEERING AND PROJECT MANAGEMENT By Lec. Junaid Arshad 1 Lecture#03 DEPARTMENT OF ENGINEERING MANAGEMENT.
Systems Analysis and Design in a Changing World, 6th Edition
BSBPMG504A Manage Project Costs 7.1 Estimate Costs Adapted from PMBOK 4 th Edition InitiationPlanning ExecutionClose Monitor Control The process of developing.
BSBPMG501A Manage Project Integrative Processes Manage Project Integrative Processes Project Integration Processes – Part 1 Diploma of Project Management.
SPACE TECHNOLOGY & APPLICATIONS INTERNATIONAL FORUM (STAIF -98) Conference on Next Generation Launch Vehicles E5 - Cost & Operations A NOVEL METHODOLOGY.
Estimating Project Times and Costs CHAPTER FIVE Student Version Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Intermediate Systems Acquisition Course Produce/Deploy/Support: Production Manufacturing Page X of Y Welcome to Production Costs and Quality On average,
5 - 1 The Cost Modeling Process Chapter Introduction What makes a good cost model? – Good Statistics – Quality Data – Relevant Data – Analogous.
Time Phasing Development and Production Chapter 16.
Analogy Technique Chapter Analogy - Method Comparative analysis of similar systems Adjust costs of an analogous system to estimate the.
AE 2350 Lecture Notes #9 May 10, 1999 We have looked at.. Airfoil aerodynamics (Chapter 8) Sources of Drag (Chapter 8, 11 and 12) –Look at the figures.
Value-Driven Design 1 The VDD story (current edition) Magnitude of Losses Avoided by VDD –Reason for VDD Model of how losses occur How VDD avoids losses.
1 Chapter 11 Planning. 2 Project Planning “establishing a predetermined course of action within a forecasted environment” “establishing a predetermined.
Chapter 3 Conceptual System Design
Systems Analysis and Design in a Changing World, 6th Edition
Fundamentals of Project Control Chapter 11 Design Stage 1 Preconstruction Stage 2: Procurement Conceptual Planning Stage3: Construction Stage 4: Project.
Preliminary Cost Analysis Principles of Space Systems Design U N I V E R S I T Y O F MARYLAND Preliminary Cost Analysis Cost Sources Vehicle-level Costing.
ALI SALMAN1 LECTURE - 05 ASST PROF. ENGR ALI SALMAN ceme.nust.edu.pk DEPARTMENT OF ENGINEERING MANAGEMENT COLLEGE OF E & ME, NUST DEPARTMENT.
Information Technology Project Management, Six th Edition Kathy Schwalbe Copyright Disampaikan Oleh : Wiwid Dolianto S.Kom, MT Universitas Muhammadiyah.
Copyright 2002 Prentice-Hall, Inc. Chapter 3 Managing the Information Systems Project Modern Systems Analysis and Design Third Edition Jeffrey A. Hoffer.
Chapter 3: Cost Estimation Techniques
Project Cost Management
ESTIMATING PROJECT TIME, COST & BUDGETING
Activity-Based Costing
ESTIMATING PROJECT TIME, COST & BUDGETING
Chapter 3: Cost Estimation Techniques
Design of UAV Systems Overall schedule 1/17 Course introduction
Cost estimation and budgeting
Boeing Phantom Works Lean and Efficient Processes and Tools
ESTIMATING PROJECT TIME, COST & BUDGETING
Chapter 3: Cost Estimation Techniques
Chapter 3: Cost Estimation Techniques
Project Management Process Groups
Knowing When to Stop: An Examination of Methods to Minimize the False Negative Risk of Automated Abort Triggers RAM XI Training Summit October 2018 Patrick.
Chapter 3: Cost Estimation Techniques
Presentation transcript:

Life cycle cost Objectives Lesson objective - to discuss the fundamentals of Life cycle cost to include… What does it include? Why is it important? Expectations - You will understand why life cycle cost is so important and what kinds of issues it addresses At the end of this lesson, you should understand (1) the fundamental issues and (2) how to make life cycle cost estimates © 2003 LM Corporation Life Cycle Cost 13-1

Parametric cost estimates Development Procurement UAV application Discussion subjects Review Parametric cost estimates Development Procurement UAV application Operations and support Manned aircraft UAV applications © 2003 LM Corporation Life Cycle Cost 13-2

Review - Life cycle cost Development cost The cost of developing a system Considered a “non-recurring” cost Occurs only once (hopefully) Procurement cost The cost to buy a system once it is developed Includes a lot of “recurring” cost Costs incurred every time a system is produced Operations and support cost (Q&S) The cost to maintain and operate a system after purchase Includes the cost of maintaining crew proficiency Excludes the cost of combat operations Development + procurement + O&S  Life cycle cost © 2003 LM Corporation Life Cycle Cost 13-3

Customers want this to be as small as possible Review - cost issues Development cost Customers want this to be as small as possible New systems are expensive Most of the cost is associated with risk reduction, engineering and test Programs need “margin” to cover uncertainty Procurement cost This cost is sensitive to procurement quantity Repetitive tasks become more efficient Also sensitive to the size and complexity Aircraft empty weight is considered a cost driver Operations and support cost Most of the life cycle cost of an aircraft is the “O&S” O&S cost can be reduced by good up-front design © 2003 LM Corporation Life Cycle Cost 13-4

Review - LCC importance Pre-concept design Key technical issues addressed during this phase include: Overall needs and objectives Concepts of operation Potential design concepts Initial cost and schedule Effectiveness estimates Analysis of alternatives The technical work done during the pre-concept design phase establishes the initial cost and schedule estimate that the project will have to live with for the rest of its life The product of this phase is a set of initial requirements and cost, risk and schedule estimates © 2003 LM Corporation Life Cycle Cost 13-5

The cost driver - early decisions Cumulative Percent Of Life Cycle Cost Milestones I II III IOC Out of Service 100 95 85 70 50 10 Detailed Design Preliminary Design Concept Design Pre-concept Design Source – Defense Systems Management College, 3 Dec. 1991 © 2003 LM Corporation Life Cycle Cost 13-6

Parametric cost estimates Development Procurement UAV application Next subject Review Parametric cost estimates Development Procurement UAV application Operations and support Manned aircraft UAV applications © 2003 LM Corporation Life Cycle Cost 13-7

Parametric cost estimates Parametric models or cost estimating relationships (CERs) are used widely for aircraft cost estimating - By industry for initial cost estimates - By customers for proposal evaluation Used when little is known about the design - But also used to check internal consistency of detailed estimates Methodology updates occur periodically - Need to capture technology benefits and costs Most recent updates focused on advanced structural materials - Composite airframe materials drive airframe cost Although no CERs yet exist for UAVs, they will exist someday and we need to understand the approach * (1) Advanced Airframe Structural Materials, a Primer and Cost Estimating Methodology, RAND R-4016-AF, Resetar, Rogers and Hess, c1990 © 2003 LM Corporation Life Cycle Cost 13-8

Material utilization trends Aluminum Titanium Steel Composites Other F-111 (1967) 59% 5% 33% 1% 2% F-15 (1972) 52% 40% F-16 (1976) 79% 4% 10% F-18 (1978) 48% 14% 15% 11% 12% (E/F) 27% 23% ? 22% 13% F-22 16% 39% 25% 20% C-17 70% 9% 8% AV-8B 47% ?% 26% B-2 37% RAND data USAF/AFRL data RAND Data - Advanced Airframe Structural Materials, a Primer and Cost Estimating Methodology, RAND R-4016-AF, Resetar, Rogers and Hess, c1990 AFRL Data – Evolution of U.S. Military Aircraft Structures Technology, AIAA Journal of Aircraft, Paul,Kelly,Venkaya,Hess, Jan-Feb 2003 © 2003 LM Corporation Life Cycle Cost 13-9

CERs capture overall air vehicle cost drivers 1. Size including airframe and empty weight, area, etc. 2. Performance including speed, specific power, etc. 3. “Construction” including load factor, engine location, area ratios, wing type, avionics weight ratio, etc. 4. Program including number of test aircraft, new vs. existing engines, contractor experience, etc. Of these, a few emerge statistically as real drivers* - Airframe unit weight (AUW) - Empty weight (EW) - Maximum speed (Vmax) - Number of test aircraft (NTA) - Airframe material type and composition Software should also be a driver (no data in 1990?) * (2) RAND N-2283/2-AF, Aircraft Airframe Cost Estimating Relationships : Fighters, December 1987 © 2003 LM Corporation Life Cycle Cost 13-10

Cost categories and elements RAND defines CERs in two major overall cost categories: non-recurring and recurring costs* - Non-recurring (development) cost elements are: - Non-recurring engineering hours (NRE) - Non-recurring tooling hours (NRT) - Development support cost (DS) - Flight test cost(FT) - Recurring (production) cost is normalized for 100 air vehicles and made up of the following elements: - Recurring engineering hours (RE100) - Recurring tooling hours (RT100) - Recurring manufacturing labor hours (RML100) - Recurring manufacturing material cost (RMM100) - Recurring quality assurance hours (RQA100) * Their methodology does not include engines, avionics, armament, training, support equipment and spares. These elements must be added. © 2003 LM Corporation Life Cycle Cost 13-11

RAND starts with an aluminum baseline cost estimate Baseline CERs RAND starts with an aluminum baseline cost estimate - Non-recurring cost elements NRE(hrs) = 0.0168(EW^.747)(Vmax^.800) (13.1) NRT(hrs) = 0.01868(EW^.810)(Vmax^.579) (13.2) DS = 0.0563(EW^.630)(Vmax^1.30) (13.3) FT = 1.54(EW^.325)(Vmax^.823)(NTA^1.21) (13.4) - Recurring cost elements RE100(hrs) = 0.000306(EW^.880)(Vmax^1.12) (13.5) RT100(hrs) = 0.00787(EW^.707)(Vmax^.813) (13.6) RML100 (hrs)= 0.141(EW^.820)(Vmax^.484) (13.7) RMM100 = 0.54(EW^.921)(Vmax^.621) (13.8) RQA100 (hrs-cargo acft) = 0.076*RML100 (13.9) RQA100 (hrs-non-cargo) = 0.133*RML100 (13.10) © 2003 LM Corporation Life Cycle Cost 13-12

RAND example, hypothetical all-aluminum fighter EW (lb) 27000 Typical application RAND example, hypothetical all-aluminum fighter EW (lb) 27000 Vmax (kt) 1300 NTA 20 Structure (lb) 13000 Production quantity 100 Typical labor rates (1999 $/hr)* Engineering $86 Tooling $88 Manufacturing $73 Quality Assurance $81 * From Raymer, page 588 - Inflation factors can be used to adjust these to current year prices (also required for material costs) © 2003 LM Corporation Life Cycle Cost 13-13

From equations 13.1 through 13.10 NRE(Khrs) = 10634 NRE($) = $914.5M Baseline cost From equations 13.1 through 13.10 NRE(Khrs) = 10634 NRE($) = $914.5M NRT(Khrs) = 4611 NRT($) = $405.7M DS($) = $389.4M FT($) = $577.6M Nonrecurring = $2,287M Total program (from NR + R) = $5.44B RE100(Khrs) = 7463 RE100($) = $642M RT100(Khrs) = 3636 RT100($) = $320.0 RML100(Khrs) = 19502 RML100($) = $1423.7 RMM100 ($) = $559M RQA100(Khrs) = 2594 RQA100($) = $210.0 Recurring($) = $3,155M © 2003 LM Corporation Life Cycle Cost 13-14

R(propul) = 2251*(0.043*Tmax + 243.25Mmax + 0.969*TiT -2228) (13.11) Other costs Engine cost - Raymer’s cost discussion (Chapter 18) includes an equation for engine procurement cost in 1999$ R(propul) = 2251*(0.043*Tmax + 243.25Mmax + 0.969*TiT -2228) (13.11) where Tmax = Maximum thrust (lb) Mmax = Maximum Mach TiT = Turbine inlet temperature (degR) ≈ 2000 - 2500 degR - For other propulsion cycles we will use $/lbm(engine) Avionics cost - Raymer recommends a weight based approximation of $3000-$6000 per pound ($1999) - We will use $5000/lb for both avionics and payloads © 2003 LM Corporation Life Cycle Cost 13-15

- Other quantities are adjusted for the “learning curve” Quantity effects RAND recurring cost methodology is based on production quantities of 100 aircraft - Other quantities are adjusted for the “learning curve” - A term used to describe the efficiencies that result from learning repetitive processes and tasks - Learning curve effects are generally expressed by exponential forms such as the following from RAND Cost (Qn) = Cost(Q100)*(Qn/100)^exp (13.12) exp(engineering hours) = 0.163 exp(tooling hours) = 0.263 exp(manufacturing hours) = 0.660 exp(manufacturing material) = 0.231 exp(tooling hours) = 0.714 exp(total program) = 0.356 where © 2003 LM Corporation Life Cycle Cost 13-16

Advanced material effects Advanced materials effects are applied to the aluminum baseline as separate cost factors Effects of advanced materials vary by element - Tooling (both nonrecurring and recurring) has twice the sensitivity to material type as engineering - Tooling focuses primarily on airframe structure - Engineering hours are driven by a wider range of design and manufacturing issues such as, design, integration, test, evaluation, etc. Overall effects are captured by historical Structural Cost Fractions (SCF) for airframe structure Nonrecurring Recurring NRE - 45% NRT - 87% RE - 42% RT - 82% RML - 67% RML - 67% RMM - 58% RQA - 69% © 2003 LM Corporation Life Cycle Cost 13-17

Complexity factors Used to capture labor hour and cost effects of different design and manufacturing processes - RAND uses complexity factors (CFs) to determine material effects by structural cost element NRE NRT RE RT RML RMM RQA Al 1.0 1.0 1.0 1.0 1.0 1.0 1.0 Al-li 1.1 1.2 1.1 1.1 1.1 2.7 1.1 Ti 1.1 1.4 1.4 1.9 1.6 2.8 1.6 Steel 1.1 1.1 1.1 1.4 1.2 0.7 1.4 GrExp 1.4 1.6 1.9 2.2 1.8 4.9 2.4 GrBi 1.5 1.7 2.1 2.3 2.1 5.5 2.5 GrTP 1.7 2.0 2.9 2.4 1.8 6.5 2.6 © 2003 LM Corporation Life Cycle Cost 13-18

Advanced material effects are applied to each cost element Methodology Advanced material effects are applied to each cost element MWC (j) = SCF(j)*[CF(i,j)*SW(i)/ SF(I)]+[1- SCF(j)] (13.13) where MWC(j) = Material weighted cost element j SCF(j) = Structural cost fraction for cost element j (chart 24-18) CF(i,j) = Complexity factor (chart 24-19) SW(i) = Structural weight by material type See RAND Report R-4016-AF, Advanced Airframe Structural Materials, a Primer and Cost Estimating Methodology, for more application information © 2003 LM Corporation Life Cycle Cost 13-19

- Such a study is beyond the scope of this course UAV cost issues Unfortunately, there are no known UAV CERs and no consistent UAV cost data bases. An example: - Total procurement cost projected by the Defense Airborne Reconnaissance Organization (DARO) for Predator in 1996 was $118M for 13 systems. - In 1998 12 Predator systems were listed as $512M or $42.7M per system - The same document budgeted $23.9M for one system for delivery in 1998 These contradictions exist across a number of UAV types and it is clear that a comprehensive cost study is needed to resolve the issues - Such a study is beyond the scope of this course We will take a simpler approach © 2003 LM Corporation Life Cycle Cost 13-20

- Cursory checks show this not a bad assumption UAV cost approach We will assume that manned aircraft CERs apply to UAV air vehicles and propulsion - Cursory checks show this not a bad assumption Global Hawk development cost ≈ $350M - The RAND aluminum baseline development cost CER for EW + payload = 11,100 lb, Vmax = 360 kts and two flight test aircraft predicts a development cost of $313M in $1999 (less engines and avionics) - Avionics development costs are not available Global Hawk procurement cost goal = $10M - The RAND aluminum baseline procurement cost CER predicts a unit 20 development cost of $15.7M - The customer acknowledged in 1998 that Global Hawk unit cost would be about $13M - Latest reports are that the airframe costs $16-20M © 2003 LM Corporation Life Cycle Cost 13-21

Other UAV system elements Little information is available on UAV control station and communications development and no CERs - Available data indicates Tactical Control Station (TCS) development costs exceed $100M Development costs for the Global Hawk/Dark Star common ground station (GCS) appear ≈ $250M We will assume, therefore, that control station development (including communications) ≈ 70% of air vehicle development cost Ground station procurement is harder to determine - Predator ground and communications station costs appear about equal at around $3M each - Global Hawk/DarkStar initial GCS procurement ≈ $25M each for 3 units. Latest reports = $45M - We will assume control station procurement including communications ≈ 1 air vehicle + payload procurement © 2003 LM Corporation Life Cycle Cost 13-22

Other system elements - cont’d We have no good information on UAV payload development costs - However, there are many payloads available off the shelf and we will assume development cost is limited to integration, which is covered under the air vehicle We also have no good information on UAV payload procurement costs - We will use Raymer’s assumed $5000 per pound parametric until something better comes along - This would imply that predator payload (450lb) costs are about $2.25M, far more than airframe cost - At a payload weight of 1900lb, Global Hawk payload cost would be $9.5M, about equal to original airframe estimate (recent USAF data cites payload at $11M) Despite the fact that some of these estimates are guesses, we will use them until something better comes along - It is better to guess than to leave something out © 2003 LM Corporation Life Cycle Cost 13-23

Parametric cost estimates Development Procurement UAV application Next subject Review Parametric cost estimates Development Procurement UAV application Operations and support Manned aircraft UAV applications © 2003 LM Corporation Life Cycle Cost 13-24

O&S costs are driven by 2 factors Manned aircraft data O&S costs are driven by 2 factors 2/3 by manpower (pilots, operations, maintenance, logistics and other personnel) 1/3 by flight hours - Flight hours (and numbers of missions) drive maintenance and fuel consumption Average annual O&S ≈ 10% unit procurement cost - Typical SE fighter ≈ $3M/yr or $9000/flight hour Typical manned fighter O&S cost breakdown - Direct personnel (pilots, maintenance, etc.) = 40-45% - Pilots (10%), ops support (15%), maintenance (75%) - Approximately 20-30 maintainers per aircraft - Indirect (security, medical, facilities etc.) = 20-25% - Fuel and spare parts = 25-35% (≈ $2K/FH for fighter) - Other = 5-10% - 1997 O&S data shows USAF average annual squadron personnel costs at about $45K per person © 2003 LM Corporation Life Cycle Cost 13-25

Direct aircraft operating costs This is the portion of the O&S cost that is directly related to flight hours (fuel and spare parts) - Direct operating costs are key figures of merit for commercial operators - Airlines typically quote direct operating costs in terms of cost per seat mile - Others including the military use cost per flight hour ($/FH) and it appears to correlate with empty weight and speed © 2003 LM Corporation Life Cycle Cost 13-26

Other direct operating costs There is no information available on O&S cost for payloads, communications equipment and ground stations - We can assume that the equipment is reliable but that it undergoes regular upgrade and refurbishment at least every 10 years - We will assume, therefore, annual O&S cost to be about 8% of initial procurement cost Once again, we are simply making an educated guess but it is better to do so than to leave out an important element of cost - If our guesses are incorrect, we can improve them when we get more data - If we leave something out, there is no chance for improvement © 2003 LM Corporation Life Cycle Cost 13-27

UAV data Three O&S data points In 1997 DARO budgeted Hunter UAV operations and support costs were at about $17.5 million for about 2000 flight hours or $8750/FH (almost the same as as a typical manned fighter) In 1999 the VTUAV program established an O&S cost goal of 25% less than Pioneer at $6500 per flight hour Published lifetime (10yr?) O&S cost for 11 Predator systems (44 air vehicles) = $697M in $FY97 Other data - UAV squadron manning data provides insight to adjust manned aircraft O&S data for UAV applications - A 4 air vehicle Predator squadron, for example, deploys with 55 people, of which 30 are operators and analysts and 24 are maintainers (13.75 total people or 6 maintainers per aircraft) © 2003 LM Corporation Life Cycle Cost 13-28

UAV air vehicle application The minimum data required are number of personnel (maintenance and operators), flight hours (FH), direct cost per FH, other direct cost and indirect personnel Predator for example has 13.75 persons per air vehicle. At $45K per person per year (FY 97 est.), personnel costs would be $620K/year per air vehicle Also assuming an indirect personnel cost ratio of 25%, annual indirect costs would be $155K Assuming 1000 FH per year at $75/FH (chart 13-24 @ 100 kts), air vehicle operating costs would be $75K Payload O&S is estimated at 8% procurement cost/year = .08*(450lb*$5000/lb) = $180K Ground station plus comms is also estimated at 8% or cost/year = 0.08*(≈$6M) = $480K Estimated annual O&S cost for Predator, therefore, would be about $1.5M per air vehicle © 2003 LM Corporation Life Cycle Cost 13-29

11-12 System LCC (Base-year FY 1996 $M) * RDT&E = $ 213 Comparison From Defense Airborne Reconnaissance Office (DARO) 1996 Annual Report - Predator 11-12 System LCC (Base-year FY 1996 $M) * RDT&E = $ 213 * Production = $ 512 * O&S, etc. = $ 697 * Total = $1,422 At 3% inflation = $761M in FY99$ Our estimate for 11-12 systems (44-48 vehicles) would be $660 - $720M - O&S/production = 1.36 or 14% of production cost per year (assuming a 10 year Life Cycle) - Average manned fighter ratio = 11% © 2003 LM Corporation Life Cycle Cost 13-30

Development - Equations 13.1 - 13.4 System cost - summary Airframe Development - Equations 13.1 - 13.4 Procurement - Equations 13.5 - 13.10 Propulsion (procurement) - Eq 13.11 Ground Station + communications Development - 70% air vehicle development Procurement ≈ 1 air vehicle + sensor payload Payload (procurement) - $5000/lb Operations and support Air vehicle & payload operators - estimate number Maintenance personnel - chart 12-30 Other personnel - add 25% Air vehicle operating costs (inc. engine) - chart 24-27 Ground station + communications - 8% procurement/yr Payload - 8% procurement/yr © 2003 LM Corporation Life Cycle Cost 13-31

Operations and support Expectations You should now understand the basic concept design cost issues including Development Procurement Operations and support © 2003 LM Corporation Life Cycle Cost 13-32

Raymer, Aircraft Design - A Conceptual Approach Reading assignment Raymer, Aircraft Design - A Conceptual Approach Chapter 3 – Sizing from a conceptual sketch Chapter 3.1 : Introduction Chapter 3.2 : Takeoff weight buildup Chapter 3.3 : Empty weight estimation Chapter 3.4 : Fuel fraction estimation Chapter 3.5 : Takeoff weight calculation* Total : 25 pages Note – Use Raymer as a reference book. It is not necessary to memorize or derive any of the equations. Read the sections over for general understanding of the concepts. © 2003 LM Corporation Life Cycle Cost 13-34

Intermission © 2003 LM Corporation Life Cycle Cost 13-34