Technical Details of the T2K Horns L. Bartoszek BARTOSZEK ENGINEERING NBI2006.

Slides:



Advertisements
Similar presentations
Liquid H 2 Absorber Production Contents (1)MICE Absorber Status (2)MICE Absorber Modification (3)Plan/Schedule (4)Summary MICE CM-23 in HARBIN Shigeru.
Advertisements

RF Cavity Module G. Gosling Dept. of Mechanical Engineering Imperial College London.
Neutrinos from Stored Muons STORM Target Station Conceptual Design 15-April-2013 Kris Anderson Fermilab/Accelerator Division/Mechanical Support Department.
A New Stripline Connection to JPARC Horn 1 Larry Bartoszek BARTOSZEK ENGINEERING 9/23/04.
The Current T2K Beam Window Design and Upgrade Potential Oxford-Princeton Targetry Workshop Princeton, Nov 2008 Matt Rooney.
MICE Collaboration meeting at RAL 26 th Oct ~ 29 th Oct, 2004 Wrap up on Radiation Shielding Module Design Stephanie Yang 26 th October, 2004.
MICE RF Cavity Design and Fabrication Update Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 27, 2004.
Steering Columns.
1 The CNGS Reflector Water distribution system Outer conductor Inner conductor Drain connections  5 Drain tube Support and alignment frame Transport chassis.
Status of the LARP Phase II Secondary Collimator Prototype 30 September 2013 LHC Collimation WG Meeting Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US.
Module Vessel Connection Concept Steve Virostek Lawrence Berkeley National Laboratory AFC Module Meeting April 23, 2004.
NUMI NuMI Hot Handling Jim Hylen (FNAL) NBI02 March 13, 2002 Page 1 NuMI Target Hall Radioactive Component Handling NuMI Target Hall Utilizes Three Basic.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Lab MICE CM26 at Riverside California March 26, 2010.
Status of the LARP Phase II Secondary Collimator Prototype 14 October 2013 LHC Collimation WG Meeting Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US LHC.
1 RF-Structures Mock-Up FEA Assembly Tooling V. Soldatov, F. Rossi, R. Raatikainen
NBI March 2002 The MiniBooNE Horn Ioanis Kourbanis For The MiniBooNE Collaboration.
ILC Main Linac Superconducting Cryogen Free Splittable Quadrupole Progress Report V. Kashikhin for Superconducting Magnet Team.
Status of 325MHz coupler S. Kazakov 11/29/ MHz coupler structure.
Aluminum bellows for experiments
Vacuum windows at JPARC Contents Introduction Vacuum windows at hadron beam line Helium gas cooling Vacuum windows at neutrino beam line primitive discussion.
NuMI Horn Construction and Testing
Ans Pardons 30/11/2006CNGS Reflector Technical Review CNGS reflector: Status Work remains to be done… 30/10 Introduction Drain connection Event analysis.
Two styles of horn fastener insulation schemes Larry Bartoszek Bartoszek Engineering.
NBI CNGS Horns Status Presented by Sandry Wallon 1 NBI 2003 – KEK, Japan 7-11 nov CNGS Horns : Status 8 nov
Ron Madaras, LBL U.S. Pixel Meeting, SCIPP, July 9-10, 2003 Patch Panel 1 (PP1) Brief Review Cost and Effort Estimate.
TURBO FLANGES We specialize in design, CNC milling, metal turning, plasma cutting, and TIG welding all done in house. Please contact us for further information.
1 18 July 2005 “Mini-Review” on CNGS Horns Introduction by K. Elsener 1 “Mini-Review” - Introduction Function of focusing horns “History” of CNGS horns.
FETS meeting, 1st November 2006 Peter Savage The Front End Test Stand Collaboration 1 The mechanical engineering design of the Mk II emittance measurement.
NUMI Transmission Line (TL) Review: Design Details TL through Block & Beyond Design/Status Bill Boettinger FNAL April 23, 2003.
NXT A computer controlled brick and the “brain” of your robot that controls the motors and sensors.
NuMI NuMI Target Hall Air System Review Introduction July 30, 2003 Jim Hylen / FNAL Page 1 NuMI Target Hall Air System Review Introduction Air system for.
Current Status and Possible Items around ‘neutrino beam’ Horn Target Remote maintenance tools Decay volume window and collimator muon monitor Many items.
Conceptual design of JPARC Horn 2 assembly L. Bartoszek Bartoszek Engineering/CU 5/5/04.
JPARC Horn 1 Outer Conductor Middle Connection Larry Bartoszek Bartoszek Engineering.
1.3GHz Input Coupler for ILC
Design of Vacuum Chambers of SSRF Storage Ring Yonglin. Chen, Dikui. Jiang SSRF Vacuum Group Shanghai Institute of Applied Physics(SINAP) China Academy.
F NuMI Beamline Accelerator Advisory Committee Presentation May 10, 2006 Mike Martens Fermilab Beams Division.
56 MHz SRF Cavity Cryostat support system and Shielding C. Pai
ARIES Review, PPPL L. M. Waganer, 4-5 Oct 2006 Page 1 Maintenance and Building Conceptual Approach L. Waganer and R. Peipert The Boeing Company 4 October.
1 Assembly and installation of TM0 in the Lab Assembly and installation of TM0 in the Lab F. Rossi September.
Aluminum probe carrier body Aluminum drive tube -assembled in sections, this provides up/down and rotational motion control of probe Fiber optic/ electrical.
7-Sep-2011 CLIC RF Structure Development Meeting «BE/RF» TD26 WITH COMPACT COUPLER FOR CLEX (TD26 CC SiC) ENGINEERING DESIGN this structure will be used.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Lab MICE CM25 at RAL, UK November 6, 2009.
ALCPG/GDE Meeting FNAL Global Design Effort 1 Cavity Specification Table 23 Oct 2007 FNAL Lutz Lilje DESY.
DTL prototype summary and production sequence F.Grespan LNL _06_22 CDR.
Engineering studies for CN2PY secondary beam. LAGUNA-LBNO General Helsinki, 26/08/20141 F. Sanchez Galan (CERN) on behalf of the CERN Secondary.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
24 September 2012 Immanuel Gfall (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
24 September 2012 Immanuel Gfall (HEPHY Vienna) Annekathrin Frankenberger (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
A First Pass at Modeling Horn 3 L. Bartoszek Bartoszek Engineering 12/10/04.
Prototype Cryomodule FDR Ken Premo 21 – 22 January 2015 High Power Coupler Design.
Completed Front and Rear Standard 10 ½” 1 ½” 3 ¼” 4 ½” 1” ¾” 1 ½” 6” ¾” Channel Length: 5 ¼”, ¾” from end.
TPC Support Installation 26 Apr 2016Dan Wenman Mechanical Engineer1 Overview Installation of the support rails Details of the rail from the SAS to the.
LCWS11 WG4 Fully featured accelerating structure engineering design
Panda Solenoid Content Interface Box Cold Mass Layout Cooling Lines
TDR guideline discussion on Cavity Integration
Design of the Injection Can
Service channels between Tracker and PP1
SiD Solenoid Status and Plans
TIDVG-4 TIDVG-4 Dump assembly, welding and installation Process sector BA1 February 2017 J. Humbert, (EN/MME) 06/02/2017 J. Humbert, EN-MME.
Workshop 4A Contact Interface Treatment
Challenges for FCC-ee MDI mechanical design
Welcome! Drafting 2323: Pipe Drafting
Stainless Steel Corrugated Braided Hose Metal Expansion Joints
LARP Phase II Secondary Collimator RC-1
April 19th 2017 Work Unit AIK CDR of the CDS-SL Installation integration.
Single Detector Design
Work Unit AIK 11.2 CDR of the CDS-SL Mechanics
Pipe fitting Threads on pipe fittings are tapered and rely on the stress generated by forcing the tapered threads of the male half of the fitting.
Presentation transcript:

Technical Details of the T2K Horns L. Bartoszek BARTOSZEK ENGINEERING NBI2006

2 My part in T2K I have been working with Ichikawa-san and the KEK group on horns 1 and 3 I model the design in 3D (with much iteration with KEK group,) and Toshiba builds it I am also working with Eric Zimmerman at CU to design and build horn 2 Horn 2 is just now ramping up in effort

3 To be covered here: Electrically isolated support that absorbs thermal expansion of the horn Details of stripline connections Design of a water connection between Stainless and Aluminum that prevents galvanic corrosion FSW welding in the US We might use this on horn 2

4 Electrically isolated support Ceramic block electrically isolates the horn attachment to its support frame The upstream end is fixed in X,Y and Z (beam direction) with a pinned joint that allows rotation The downstream pin joint translates in Z as horn changes temperature

DS pin joint US pin joint

Pin attached to horn

Horn 1 stripline configuration

Ceramic disks clamped by threaded rods restrain Lorentz forces on stripline

This bend was hard to assemble on Horn 1

Horn 3 stripline configuration

Improved corner joint design

Will be possible to assemble the corner from inside and out

Ø32 mm holes penetrate the stripline

Ceramic sleeve isolates the threaded rod from the SL plates

Clamp for 4 plates just below the remote disconnect showing the larger gap

How are disks inserted?

Draft of Horn 3 on its module

Draft of horn 1 on its module

Isolated water connection to Outer Conductor that prevents SS/AL galvanic corrosion

Horn 3 water system Supply lines Drain lines

Drain tank Elevation view of Horn 3 beam

Auxilliary drain lines Supply lines Welded bellows with ceramic isolation

ceramic Water spray nozzle Aux drain fitting supply fitting Stainless flange Flange to connect nozzles to Outer Conductor

EVAC NW25 Al seal between ceramic and horn Al Helicoflex SS seal between SS and ceramic Exploded view of connection Tapping is done in SS flange and Al outer conductor, only counterbores in ceramic

Cutaway Exploded view showing water routing channels in flange

Close-up cutaway of auxilliary water path

Horn 1 temporary auxilliary drain lines

28 FSW welding Friction Stir welding produces welds with higher fatigue strength than TIG welding The Japanese are ahead of the US in commercializing the Friction Stir Welding process Friction Stir Link, Inc, a new company in WI offers robotic FSW for tube welding This is great news for the horn 2 effort! Now we have an alternative to welding at FNAL

Robotic FSW welding machine

Entry point of FSW tool on test weld Exit point of FSW tool

Huuuuunnnnnhhhhh? Whhaaaattt?