The Financing of Gas Projects

Slides:



Advertisements
Similar presentations
The Southern Corridor John Baldwin.
Advertisements

Copyright © 2008 Pearson Addison-Wesley. All rights reserved. Chapter 10 Exchange Rates and Exchange Rate Systems.
1 Introduction to Transportation Systems. 2 PART I: CONTEXT, CONCEPTS AND CHARACTERIZATI ON.
1 1 Trade World Business Council for Sustainable Development Geneva, September 2007 Doing Business with the World - The new role of corporate leadership.
European Investment Bank
Croatian Trade Export Credit Insurance in support of
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
“Review Study Guide nightly”
Financing Essentials for Public-Private Partnerships United Nations SU/SSC Training Course September 19, 2006.
1 John Page Chief Economist, Africa Region World Bank INVESTING IN AFRICAS GROWTH What Role for The Diaspora? Cape Town, February 2008.
1 MACROECONOMICS AND THE GLOBAL BUSINESS ENVIRONMENT Monetary Policy 2 nd edition.
Commercial Bank Operations
Swaps Definitions In a swap, two counterparties agree to a contractual arrangement where in they agree to exchange cash flows at periodic intervals.
Chapter Outline Hedging and Price Volatility Managing Financial Risk
Symposium on Private Financing for African Power Infrastructure US Treasury Department Washington, DC October 13, 2008.
6 th International Venture Capital Forum Athens 14 th -15 th June 2005 Private Equity in Europe -Fund Raising and Trends.
Indonesia’s current account challenge
SK E&C Engineering & Construction.
The emerging skills shortage in the minerals industry - potential constraints on future sustainable development John Thompson.
The Oil Majors and the US Geo- Strategy in Eurasia after the End of Cold War Anthony Livanios CEO Energy Stream CMG GmbH January 21, 2014.
New Build Nuclear: Who takes completion risk? Platts Nuclear Energy – Opportunities for Growth & Investment in Europe by Milton Caplan President, MZConsulting.
OMV Gas Move & more. Financing the Nabucco Gas Pipeline Project Brussels, November 9th, 2006 Reinhard Mitschek OMV Gas International GmbH Head of International.
25 seconds left…...
Turkish Economy “Recent developments” Ekrem Keskin November 2008.
UK and Rwanda Trade & Investment Forum 22 nd October 2014 Confidential Changing the Game for Africa.
International Opportunities
Copyright ©2004, South-Western College Publishing International Economics By Robert J. Carbaugh 9th Edition Chapter 13: Exchange-Rate Determination.
Dana Craciunescu Principal Banker EBRD Municipal and Environmental Infrastructure Team Bucharest 29 September 2004 EBRD Lending to the Water Sector in.
Simon Par Keeling, Société Générale Paris
EBRD Financing for Rural Communication Infrastructure Tokyo August 2004   
FINANCING LNG PROJECTS. Contracting for and financing LNG assets April 2006.
International Business 9e By Charles W.L. Hill McGraw-Hill/Irwin Copyright © 2013 by The McGraw-Hill Companies, Inc. All rights reserved.
EBRD investment in new gas infrastructure CEER Brussels, 9 November 2006.
Presented By Robin Tayal Impact of Spot Trading on Project Finance.
WORLD ENERGY INVESTMENT OUTLOOK
PPP FINANCING ARRANGMENTS – STRUCTURING FINANCE SUCCESSFULLY IMTIAZ HIZKIL ISLAMIC DEVELOPMENT BANK.
SECURITY OF GAS SUPPLY IN OPEN MARKETS LNG AND POWER AT A TURNING POINT INTERNATIONAL ENERGY AGENCY Security of European Gas Supply What are the important.
The World Bank Group Instruments. The World Bank World Bank Group financing and risk mitigation instruments IBRD/IDA MIGAIFC IBRD Loan for middle income.
EBRD and the GEF Combining Capacity Building and Investment.
0 EBRD views with respect to gas sector restructuring Marko Kecman Associate Banker, Power & Energy Utilities Vrnjačka Banja, Serbia 4 th October 2005.
An Expanded Role for EBRD in Mining Finance: Exploration Stage Equity
EBRD: Financing opportunities for Natural Resources projects in Central Asia MINEX Central Asia 2015, Astana, Kazakhstan 19 March 2015.
MULTILATERAL INVESTMENT GUARANTEE AGENCY WORLD BANK GROUP 1 MIGA: Managing Risk in a Challenging Environment Pristina, Kosovo, May 2013.
TurnAround Management & Business Advisory Services (TAM/BAS) Programme Nestor Partners.
PIPELINE FINANCING: LEGAL AND CONTRACTUAL ISSUES 9th Africa Oil and Gas, Trade and Finance Conference and Exhibition Héctor O. FARINA Lawyer Maputo, Mozambique.
Evolution of the Asian LNG Industry. ExxonMobil Gas & Power Marketing 30 years experience With our partners: »Supply about 20% of world’s LNG today »Arun.
BG Group Managing Risks and Seizing Opportunities for Local Companies in the Oil & Gas Sector pre-UNCTAD XI Perspectives for the Gas Sector in Brazil Luiz.
EBRD Trade Facilitation Programme (TFP) Czech-Asian Forum (March 2 nd, 2009 Prague)
The need for a European gas index 14 th Nov 2008 Dominique Venet Executive VP Gas.
Financing Opportunities through the EBRD. What is the EBRD?
Public Private Partnerships (PPPs) and The World Bank
Inter-American Development Bank Private Sector Financing and the IDB Presentation by the IDB Private Sector Department February 2004.
IFC’s Financing Instruments. IFC’s Mission To promote sustainable private sector investment in developing countries, helping to reduce poverty and improve.
EBRD Natural Resources Activities ECSEE Meeting, Zagreb 28 September 2004.
Markets, Barriers and Opportunities for Renewable Energy in APEC Economies Lydia La Ferla Energy & Security Group May 14, 2004.
MEDEF MEETING March 7, 2012 A.T. Shaukat Chief Engineer Global Infrastructure & Natural Resources.
Common Legal Basis for Transit Transportation The European Union ’ s Tacis TRACECA programme for Armenia, Azerbaijan, Bulgaria, Georgia, Kazakhstan, Kyrgyzstan,
European Bank for Reconstruction and Development Financing Renewable Energy Projects in Bulgaria Anton Kobakov Senior Banker RO Sofia, Bulgaria.
International Business 9e
European Energy Southern Gas Corridor to Europe
EBRD – Supporting SME business
Cross-border Infrastructure Projects
EBRD in Greece July 2016.
EBRD in Greece October 2016 Financing Growth
Working with the European Bank for Reconstruction and Development
EBRD in Greece July 2016.
EBRD Agribusiness December 2016
Aleksandar Nikcevic, Principal Banker
EBRD: Financing opportunities for Natural Resources projects in Central Asia MINEX Central Asia 2015, Astana, Kazakhstan 19 March 2015.
Presentation transcript:

The Financing of Gas Projects Enrico Grassi Principal Banker, Natural Resources EBRD

EBRD – Who are we? International financial institution, owned by 60 countries and two inter-governmental institutions Promotes transition to market-based economies in 27 countries from central Europe to central Asia Capital base of € 20 billion Cumulative commitments € 21.7 billion

EBRD facilities Guarantees Loans Equity All risk guarantees Specific risk guarantees (e.g. political) Commodity-backed instruments Trade facilitation programme Non/partial recourse to sponsors Project specific Hard/local currency Medium and long term Floating/fixed rates New equity Privatisation Quasi-equity

EBRD Natural Resources portfolio €1.7 billion committed to €10 billion projects Future portfolio will be more diversified: 60% oil / 40% gas 20% pipeline and downstream projects significant growth in “regional” projects involving several countries Petroleum Refineries Metal Ore Mining Pipeline Transportation Oil and Gas Extraction

The Financing Gas/LNG Projects

Why the world go for Natural Gas? Improvements in combined cycle gas turbine power generation drove increase in gas consumption Environmental concerns Concerns regarding stable oil supplies Reduction in investment requested along the whole chain Big gas reserves in the oil companies books

How to bring gas to the market which is far? The answer is LNG

What are the challenges to the market players who want to participate in LNG rush? (1) LNG projects require huge investments and have long payoff periods: today prices are high but what may happen if they collapse? High gas prices is good news for the oil companies not for consumers: will the market reconsider coal and re-evaluate nuclear power?

What are the challenges to the market players who want to participate in LNG rush? (2) LNG prices have been historically indexed to oil but more and more starting being priced against hub gas prices: how to understand the trend of “new” pricing? Market see many greenfield projects: to which extent the financial world will accept the risk and on which terms?

How LNG market has changed in the recent years? Contracts are characterised today by flexibility in: destination volumes duration Development of the spot market Shipping arrangements are moving from DES to FOB

Why oil companies look for MLA/ECAs financing? To share the risk and to receive: Political cover Longer maturities Flexible repayment profile Leadership in large scale financing Knowledge of and experience in gas/LNG projects

What are the classic challenges in financing gas and LNG projects? (1) Construction / Completion Risk contractual structure (delays, cost over-runs, etc.) Operational Risk technological integration and experience / viability Utilisation / Supply Risk type of throughput arrangement fundamentals (Market/Competition)

What are the classic challenges in financing gas and LNG projects? (2) Competition / Market effect of oil price (linked to gas and oil products) regional supply / demand impact on tariff Political & Regulatory Risks regulatory intervention (tariffs & export volumes) political turmoil / disputes / violence / nationalisation discriminatory taxation

Risks and their mitigation Economic & financial minimised through financial package and due diligence Technical risks reliance on strong and technically competent sponsor Environmental risks sponsor commitment to appropriate guidelines Political risks minimised through involvement of IFI’s and ECA’s

Available Financing Sources Equity Strategic investors (oil and gas majors) Investment funds (limited scope) IFI’s (EBRD, IFC) Debt Financing IFI's (EBRD, IFC) (own funds) EIB (European portion) Commercial banks (participating in IFI B Loans) ECAs (Hermes, Coface, JBIC, Exim…) Capital Markets Equity (IPO's) Bonds

Debt as Financing Source Loans Tailor made instruments with negotiated conditions Bank lenders familiar with different structures Bonds Relatively rapid issuance process No covenants for straight instruments Tradable instruments But lack of flexibility

Sakhalin II Project (1 of 3) Each LNG project consists of a continuous chain of activities linking the gas production to the gas user This Project Production Oil & Gas field development and pipelines Liquefaction LNG plant and oil & LNG export terminal Shipping LNG tankers Regasification LNG receiving terminal

Sakhalin II Project (2 of 3)

Sakhalin II Project (3 of 3) Additional offshore platform Oil & Gas pipelines stretching the length of the island Development of Lunskoye gas field through offshore platform Construction of LNG plant and oil export terminal

Shah Deniz Project – Overview (1 of 4) Reserves: proven and probable gas-in-place of approximately 31 trillion cubic feet (tcf) – world class reserves; likelihood of an additional 22 tcf Project: 4-stage development of the Shah Deniz gas and condensate field with Stage 1 cost of USD 2.3 billion Local participation: State Oil Company of Azerbaijan Republic (SOCAR) also holds a 10% interest in this project (through AzSD: EBRD will part-finance their cash calls)

South Caucasus Pipeline – Overview (2 of 4) Pipeline route: a 690 km gas pipeline starting at the Sangachal Terminal, traversing Azerbaijan and Georgia and connecting with the BOTAS domestic gas distribution system at the Georgian-Turkish border Construction & timing: SCP’s Right of Way runs parallel to BTC and construction of SCP will occur concurrently with that of BTC Capacity & cost: a peak capacity of over 20 billion cubic feet (bcf) per annum and will cost over USD 1 billion

South Caucasus Pipeline – Route (3 of 4)

SD and SCP Project – Sponsors (4 of 4)

Contact Details Enrico G. Grassi Principal Banker Natural Resources Team European Bank for Reconstruction and Development 1 Exchange Square London, EC2A 2JN Tel.   44 (0)20 7338 6179 Fax   44 (0)20 7338 6101 Email: GrassiE@ebrd.com

More information: www.ebrd.com