Status of TRD Chamber and Readout Electronics Integration Ken Oyama and Christian Lippmann for the TRD Collaboration Sep. 26, 2005 TRD status meeting in.

Slides:



Advertisements
Similar presentations
The MAD chip: 4 channel preamplifier + discriminator.
Advertisements

M.PEGORARO Grounding Workshop 24th Jan 08 DT GROUNDING & SHIELDING Presented by A. BENVENUTI.
CMS GEM Workshop III, April 20, 2012
Layer 0 Grounding Requirement in terms of noise performance Grounding/Shielding studies with L0 prototype Summary Kazu Hanagaki / Fermilab.
FE electronic box Construction of end piece OT module Electronic components Mechanics Cooling.
Grounding and Testing L0 (L1) --- noise studies --- Kazu Hanagaki, Sara Lager, Gustavo Otero Introduction of noise issue What is going on the other side.
WACH4 26/11/2002Julien Cogan CERN/EP/CMA-1- M0 COOLING IN H4 Cooling is a key issue : –APD gain : ~ -2.4 % /  C –XTAL response (scintillation) : ~ -1.9.
Status of the LHCb RPC detector Changes with respect to Note cm strips instead of 3 cm (cost optimization) All gaps same size (standardization)
M. Palm, CERN1 Performance test of ACEM-detector (Aluminum Cathode Electron Multiplier) Marcus Palm AB-ATB-EA.
1Daya Bay RPC HV FDR 6/17/2008 RPC HV cable pick-up noise issue C. Lu, Princeton University (6/17/2008)
Dariusz Miskowiec, TRD status meeting Oct alignment... i.e. how to figure out where the detectors are, and how to use this knowledge in the reconstruction.
CMS WeekDec 2002E. Hazen HF Electronics Status Report E. Hazen, J. Rohlf, E. Machado Boston University.
November Vertex 2002 Kazu Hanagaki1 Layer 0 in D0 Silicon Tracker for run2b Kazu Hanagaki / Fermilab for D0 run2b Silicon Tracker group Motivation.
PRR TRD COOLING A. Marín (GSI) 7/01/2004 ALICE PRR TRD COOLING P.Glässel, A.Marín, V.Petracek, J.Stachel, M.R.Stockmeier, J.P.Wessels ALICE PRR TRD COOLING.
1 FEE Installation & Commissioning TPC Meeting, 21 April 2006 L. Musa.
Performance of the DZero Layer 0 Detector Marvin Johnson For the DZero Silicon Group.
ZTF Interconnecting Scheme Stephen Kaye
PROFIBUS wiring/installation can be done with:
Performance of SPIROC chips in SKIROC mode
ISR Work Progress Report Muon Week April 10 th 2003 A. Benvenuti INFN Bologna.
Timing Jitter and Cross Talk in the SRS + Xray scan of FIT zigzag board Michael Phipps, Bob Azmoun, and Craig Woody 1.
17/06/2010UK Valencia RAL Petals and Staves Meeting 1 DC-DC for Stave Bus Tapes Roy Wastie Oxford University.
CVD PCB, first steps. 15 mm 25 mm Chip area. No ground plane underneath the chip. Bulk isolated => only one ground line Power lines Connector: 11,1mm*2,1mm:
1 Sasha Milov DC meeting Jan 11, 2006 HBD upgrade status. Sasha Milov Jan 11, 2006.
Modelling of TPM noise problems Greg, following discussions and measurements with David and Senerath.
Updates on GEMs characterization with APV electronics K. Gnanvo, N. Liyanage, K. Saenboonruang.
VC Feb 2010Slide 1 EMR Construction Status o General Design o Electronics o Cosmics test Jean-Sebastien Graulich, Geneva.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
ATLAS Liquid Argon Calorimeter Monitoring & Data Quality Jessica Levêque Centre de Physique des Particules de Marseille ATLAS Liquid Argon Calorimeter.
Preliminary Results of the Beetle Readout for the MaPMTs  Part 1: as presented on  Achievements since last LHCb week  Common Mode correction.
Lab #3 and Lab 4: RC and RL Circuits Remember what capacitors and inductors are Remember why circuits containing them can have currents that change with.
The LHCb Outer Tracker Front End, what does it look like and what is the status Talk for the LHCb Electronics Working Group /TS A Collaboration.
Status report on the development of a readout system based on the SALTRO-16 chip Leif Jönsson Lund University LCTPC Collaboration Meeting
EPS-HEP 2015, Vienna. 1 Test of MPGD modules with a large prototype Time Projection Chamber Deb Sankar Bhattacharya On behalf of.
HCAL – Integration Plans Mathias ReineckeHCAL – Main meeting Introduction 2.HCAL Base Unit (HBU) - Update 3.Testboards 4.Light Calibration System.
Update on SBS Back Tracker UVa K. Gnanvo, N. Liyanage, V Nelyubin, K. Saenboonruang, Seth Saher, Nikolai Pillip (visiting from Univ. Tel Aviv, Israel)
Status of the Remote HV System 10 June 2015 TileCal week, upgrade session Roméo Bonnefoy, Romain Madar and François Vazeille ● Summary of performances.
By: Uriel Barron Matan Schlanger Supervisor: Mony Orbach Final Review March 2015.
D. Nelson October 7, Serial Power Overview Presented by David Nelson
CARDIAC meeting – 30 Sept 05 M3R3-M5R3-M5R4 FEE status.
L0 Technical Readiness Review-Electronics Installation Linda Bagby L0 Electronics Installation  System Electronics Overview u Low Voltage s Filter.
Status of TRD Pre-trigger System K. Oyama, T. Krawutschke, A. Rausch, J. Stachel, P. von Walter, R. Schicker and M. Stockmeier for the T0, V0, and TRD.
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept and status of the PSD temperature control - Concept of the PSD analog part.
We really need to check all the results showed. We change the GEM from the fully-well-shielded to the less shielded one (top- bottom-fan out with aluminum)
E.Guschin (INR,Moscow) 3 May 2006Calorimeter commissioning meeting Status of PRS/SPD detector Cosmic test results Installation/tuning of monitoring system.
LC Power Distribution & Pulsing Workshop, May 2011 Super-ALTRO Demonstrator Test Results LC Power Distribution & Pulsing Workshop, May nd November.
Status of the PSD upgrade - Problems with PSD in Be runs - Modification of cooling system - New temperature control - Upgrade of HV control system - MAPD.
Technical FORUM, Peter Glässel, Heidelberg1 TPC Progress Project leader: Peter Braun-Munzinger, GSI Darmstadt Deputy project leader: Johanna Stachel,
Abstract Beam Test of a Large-area GEM Detector Prototype for the Upgrade of the CMS Muon Endcap System V. Bhopatkar, M. Hohlmann, M. Phipps, J. Twigger,
Quality control for large volume production GEM detectors Christopher Armaingaud On behalf of the collaboration GEMs for CMS.
10/2/2002MJL - MuTr DC Report Muon Tracking Status South North.
RICH2 support and cooling mechanics status update Massimo Benettoni July 30,
PSD upgrade: concept and plans - Why the PSD upgrade is necessary? - Concept of the PSD temperature stabilization and control - Upgrade of HV control system.
1 19 th January 2009 M. Mager - L. Musa Charge Readout Chip Development & System Level Considerations.
Saverio MINUTOLITOTEM Electronics W.G., 9 December T1 electronics status.
June 30th 2008Jacques Lefrancois1 CW base studies Last week June 24th at calo meeting : news that preliminary test done by Yuri Gilitski indicated that.
Design summary Status of the development & production - test run with S3a and S3b prototype - performance tests To do list for production & development.
TRIPLEGEM and VFATs at The Test Beam Area TRIPLEGEM and VFATs at The Test Beam Area N. Turini……reporter Eraldo Oliveri! Eraldo Oliveri main worker! N.
PHOTOTUBE SCANNING SETUP AT THE UNIVERSITY OF MARYLAND Doug Roberts U of Maryland, College Park.
SVD Electronics Constraints
Calorimeter Mu2e Development electronics Front-end Review
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
Meeting on Services and Power Supplies
DT Infrastructure: LV, HV, Gas
M. Alexeev on behalf of Torino TIGER Test Group
Recirculating CO2 System
BESIII EMC electronics
EIC Tracking Meeting, March 26, 2012
Performance test of ACEM-detector (Aluminum Cathode Electron Multiplier) Marcus Palm AB-ATB-EA M. Palm, CERN.
DAQ and visualization software
Presentation transcript:

Status of TRD Chamber and Readout Electronics Integration Ken Oyama and Christian Lippmann for the TRD Collaboration Sep. 26, 2005 TRD status meeting in Cheile Grădiştei, Romania

2005/Sep./252 Contents Investigation for reducing noise. Remove external noise by good groundings and good H.V. connections. Testing of new type regulators with charge pump. Using pre-final power bus bar and its load test. Using prototype water cooling pipes and check noise level with it.

2005/Sep./253 Situation Today What is different since before? 1. Power bus bar is there. 2. Cooling pipes are there. 3. Better HV connections. Recently, TRD test beam stack is mainly operated by M.Gutfleisch with the cosmic trigger, stably. Study for integration and grounding are mainly done for the stand alone chamber (S.A.C.) outside the stack. DCS (for CLK, Trig, SCSN) independently powered single MCM instead of T3 ROBs L1C0 stand alone chamber (S.A.C.) fully covered by the 6 T4 ROBs

2005/Sep./254 Load Test of the Prototype Power Bus Bar A prototype power bus bar with 4 pairs of copper plates ( 0.7 mm x 50 mm each) was tested. 40 A current for each pair is given without cooling (total 160 A). Result Voltage drop in 60 cm bar at 40 A load current = 16 ± 1 mV  27 mV/m  0.67 mΩ/m. Expected resistance is 0.5 mΩ/m for pure copper at room temperature while our measurement is 34 % larger. Maximum voltage drop in supermodule will be ~200 mV. The bar had no significant heat (~ human skin) except for around the short cut point.

2005/Sep./255 (1) Before bus bar installation(2) After bus bar installation pos0 # pos1 # pos3 # pos2 # pos5 # pos4 # pos0 # pos1 # pos3 # pos2 # pos5 # pos4 # memo: excluded dead or disconnected MCM’s for all measurements. average 1.37 average 1.23 ( 10 % better ) (3) If we exchange pos 1 and 5 ROB’s pos0 # pos1 # pos3 # pos2 # pos5 # pos4 # Noise Measurement Noise looks associated to rob type and regulator type.

2005/Sep./256 T4#0025 with new regulatorT4#0023 with old regulator Noise Measurement new regulators sitting here

2005/Sep./257 AC component on 5 V pumped line on patchworks without capacitors With two 470 uF capacitors on 5 V pumped line 5V charge pump output (AC cpl.) PASA output Noise from Charge Pump 40 mV

2005/Sep./258 Two 470 uF for pos5: pos0 # pos1 # pos3 # pos2 # pos5 # pos4 # Noise Level with Capacitances on Pumped Lines Capacitors help but not yet perfect. Turning off of pos3 and pos2 did not help. Extra shielding and battery driving of charge pump did not help. Increasing connections among ROB’s help a bit but not yet perfect. Connecting HV GND of filter box to carbon surface did not help.

2005/Sep./259 HV Improving # pos0 # pos1 # pos3 #27 OFF pos2 #28 OFF pos5 # pos4 # # direct connection of HV GND to pos4 ROB GND and better handling of cables. Improving H.V. Connections 1.It was found that noise is significantly reduced (> 60 e) if we connect H.V.GND of H.V. filter box to PASA GND on nearest ROB (number above). 2.C.Lippmann found that pos0 noise significantly increased at some point (> to 1.3 LSB). This gave us a hint that handling of H.V. connection from filter box to ROB is really important.

2005/Sep./2510 pos0 # pos1 # pos3 #xx OFF pos2 #28 OFF pos5 # pos4 # Last steps were: All HV cables from filter box to anode segments were cut to appropriate length (25 cm for row0 and 1). And well gathered and taped so that loop area is minimized. Red (final) HV cables from HV distribution box to filter box with length similar to that in the super-module, SHV connectors of filter box replaced by soldering. This gives little bit less noise but not significant. With these connections, noise level does not increase significantly even if you switch back to using charge pump (less than 20 e contribution). No additional shielding by aluminum foils around chamber is necessary. The Best Situation Till Now average: 1.038

2005/Sep./2511 Pos0 Results

2005/Sep./2512 Pos1 Results

2005/Sep./2513 Although small excess is at 8 o’clock Sep.12, noise level is very stable in ±10 electrons. Long Term Stability of Noise Level

2005/Sep./2514 Result Average RMS for MCMs under the pipes without pipe : 1.08 LSB (1.08 for Pos1) no grounding of pipe : 1.09 LSB (1.08 for Pos1) grounding to L-profile : 1.10 LSB (1.09 for Pos1) grounding to PASA GND : 1.08 LSB (1.08 for Pos1) Conclusion No significant effect due to pipes but grounding to PASA GND looks the best. Probably It is safer to have this option. Testing with Water Cooling Pipe Made by A. Marin Cooling water pipes & plates on only MCM0-7 on Position 0 ROB Grounding by copper strip to ROB PASA GND

2005/Sep./2515 ADC-PASA noise measurements(2) David Muthers, Kaiserslautern

2005/Sep./2516 PAD Capacitance Measurement by D.Emschermann L1C1

2005/Sep./2517 without pad connections (0.64 in avg.) Pad C are from D.Emschermann’s measurements on L1C1 chamber, and scaled for L1C0 chamber using difference of PAD sizes (80 / 75 and 90 / 75 for row 0 and 1, respectively). In addition, 3.5 pF due to connectors, balls, and traces on ROB and MCM is added. Measurement from D.Muthers and I.Rusanov were multiplied by 1000/1200 because ADC range setup is different between their measurement and our S.A.C. measurement on L1C0 S.A.C (1.04 in avg.) Note: Fit result for ROB on Chamber thru ADC is: * C LSB’s. Line width show 2 sigma deviation. Chi2 / NDF= 2.2 / 473. Pad Capacitance Dependence

2005/Sep./2518 Conclusions Noise level is significantly improved from ~1.37 LSB (1560 e) to ~1.04 LSB (1250 e). Finalizing grounding method and H.V. connections were almost done but still maybe we can improve (900 e nolse contribution might be still there). We can investigate whether the noise level stays like now in LSB if we vary gain setup of ADC, and check what is the dominant source is 900 e noise. Testing of power bus bar was done. Basic test of water pipe was done and there was no significant effect in noise level.

2005/Sep./2519 Backup Slides

2005/Sep./2520 ADC-PASA noise measurements(3) David Muthers, Kaiserslautern

2005/Sep./2521 Pos4 Results

2005/Sep./2522 Pos5 Results

2005/Sep./2523 Current per bus bar: Digital 3.3V 8 A + ~5 A TRAP + OASE Digital 1.8V 35 A ADC Analog 1.8V 38 A ADC Analog 3.3V 29 A PASA Digital and Analog should not be mixed: Digital 48 A Analog 67 A * Analog should be closer to the cooling water pipe * PASA can not be touched to digital so … Digital 3.3V ~13 A Digital 1.8V 35 A Analog 1.8V 38 A Analog 3.3V 29 A cooling

2005/Sep./2524 ADC-PASA noise measurements(1) David Muthers, Kaiserslautern

2005/Sep./2525 Noise Measurements 2 strong effect of badly routed pre- trigger line. But most of them have no problem.

2005/Sep./2526 No Correlation between with and w.o. PADs

2005/Sep./2527