MINICASE.

Slides:



Advertisements
Similar presentations
22 Real Options McGraw-Hill/Irwin
Advertisements

Investment Decision-making. Content Investment Issues with investment appraisal Investment appraisal techniques: –Payback –Average Rate of Return (ARR)
2-1 Copyright © 2006 McGraw Hill Ryerson Limited prepared by: Sujata Madan McGill University Fundamentals of Corporate Finance Third Canadian Edition.
CHAPTER 14 Real Options.
Valuation of real options in Corporate Finance
Lecture 8 - Capital Budgeting: Estimating Cash Flows and Analyzing Risk.
CORPORATE FINANCIAL THEORY Lecture 3. Interest Rate Cash Flow Interest Rate and Cash Flow - REALITY Is not guaranteed Has many different sources.
Chapter 6 Capital Budgeting Techniques © 2005 Thomson/South-Western.
WEMBA 2000Real Options26 Introducing Real Options What are Real Options? Expansion Options: Starsoft Inc. is considering expanding its internet software.
Chapter 8: Strategy and Analysis Using NPV
Real Options The Right to do Something Real. Introduction The classical DCF valuation method involves a comparison between the cost of an investment project.
Project Interactions, Side Costs, and Side Benefits 05/05/08 Ch. 6.
Chapter 4 Real Options and Project Analysis
CHAPTER 13 Other Topics in Capital Budgeting Evaluating projects with unequal lives Identifying embedded options Valuing real options in projects.
Chap 5 Numerical Methods for Simple Options.  NPV is forced to treat future courses of action as mutually exclusive, ROA can combine them into a single.
Copyright K. Cuthbertson, D.Nitzsche FINANCIAL ENGINEERING: DERIVATIVES AND RISK MANAGEMENT (J. Wiley, 2001) K. Cuthbertson and D. Nitzsche Lecture Real.
Session 21: The options to expand and abandon
Copyright © 2001 by Harcourt, Inc.All rights reserved. CHAPTER 13 Other Topics in Capital Budgeting Evaluating projects with unequal lives Evaluating.
©2002 Prentice Hall Business Publishing, Introduction to Management Accounting 12/e, Horngren/Sundem/Stratton Chapter 11 Capital Budgeting.
Copyright © 2003 Pearson Education, Inc.Slide 17-1 Chapter 17 Real Options.
Real Options and Other Topics in Capital Budgeting
McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights reserved. Chapter 12 Planning Investments: Capital Budgeting.
8- 1 McGraw Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights reserved Fundamentals of Corporate Finance Sixth Edition Richard.
Chapter 8 – Net Present Value and Other Investment Criteria
McGraw-Hill/Irwin Copyright © 2004 by The McGraw-Hill Companies, Inc. All rights reserved. 8-0 Corporate Finance Ross  Westerfield  Jaffe Seventh Edition.
MSE608C – Engineering and Financial Cost Analysis
COURS TITLE Derivatives Markets
CHAPTER 9 Capital Investment Decision Basics
Growth Options Martin Development Co. is deciding whether to proceed with Project X. The cost would be $9 million in Year 0. There is a 50 percent chance.
Introduction to options
1 Practical Problems in Capital Budgeting Lecture 3 Fall 2010 Advanced Corporate Finance FINA 7330 Ronald F. Singer.
Chapter 24 Fundamentals of Corporate Finance Fourth Edition Options Slides by Matthew Will Irwin/McGraw Hill Copyright © 2003 by The McGraw-Hill Companies,
CHAPTER 13 Option Pricing with Applications to Real Options
8- 1 McGraw Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights reserved Chapter 8 Net Present Value and Other Investment Criteria.
Chapter 7 Fundamentals of Corporate Finance Fifth Edition Slides by Matthew Will McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc.
CORPORATE FINANCE I ESCP-EAP European Executive MBA
12-1 Capital Budgeting and Financial Planning LECTURE 22 Course Instructor: M. Jibran Sheikh.
Venture Capital and the Finance of Innovation [Course number] Professor [Name ] [School Name] Chapter 21 Real Options.
McGraw-Hill/Irwin © 2008 The McGraw-Hill Companies, Inc., All Rights Reserved. 1-1 McGraw-Hill/Irwin © 2008 The McGraw-Hill Companies, Inc., All Rights.
FIN 614: Financial Management Larry Schrenk, Instructor.
© 2013 Cengage Learning. All Rights Reserved. May not be scanned, copied, or duplicated, or posted to a publicly accessible website, in whole or in part.
13-1 CHAPTER 13 Real Options and Other Topics in Capital Budgeting Identifying embedded options Valuing real options in projects Evaluating projects with.
Capital Budgeting and Financial Planning Course Instructor: M.Jibran Sheikh.
Dr. M. Fouzul Kabir Khan Professor of Economics and Finance North South University Lecture 5: Project Appraisal Under Uncertainty.
Capital Budgeting and Financial Planning Course Instructor: M.Jibran Sheikh.
CAPITAL BUDGETING &FINANCIAL PLANNING. d. Now suppose this project has an investment timing option, since it can be delayed for a year. The cost will.
Lecture 03.0 Project analysis Copyright © 2006 by The McGraw-Hill Companies, Inc. All rights reserved McGraw-Hill/Irwin.
Contemporary Engineering Economics
1 Real Options Ch 13 Fin The traditional NPV rule is a passive approach because … The traditional NPV approach assumes  mangers do not have influence.
McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
1 CHAPTER 12 Real Options Real options Decision trees Application of financial options to real options.
FIN 614: Financial Management Larry Schrenk, Instructor.
U8-1 UNIT 8 Project Valuation Should we build this plant?
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. Chapter 11 APPLICATION OF REAL OPTION TECHNIQUES TO CAPITAL.
Copyright © 2002 South-Western Financial options Black-Scholes Option Pricing Model Real options Decision trees Application of financial options.
Investment decision making. Capital investment Capital investments are usually long term and expensive. Examples of capital investment include: Plant.
Investment Decision-making Learning Outcomes To be able to perform investment appraisal calculations (E) To be able to analyse the investment appraisal.
BPP LEARNING MEDIA CIMA P2 Advanced Management Accounting For exams in 2016 江西财经大学会计学院 吉伟莉
1 Other Topics in Capital Budgeting Evaluating projects with unequal lives Evaluating projects with embedded options Valuing real options in projects.
Real Options in Project Evaluation: Project Timing Stephen Gray Campbell R. Harvey.
Copyright © 2014 by Nelson Education Ltd.
Real Options Konstantinos Drakos, Macrofinance, Real Options.
CHAPTER 14 Real Options.
Net Present Value and Other Investment Criteria
Introducing Real Options
CHAPTER 12 Other Topics in Capital Budgeting
Loose Ends II.
Capital Investment Appraisal: Appraisal process and methods
CHAPTER 13 Other Topics in Capital Budgeting
Presentation transcript:

MINICASE

Assume that you have just been hired as a financial analyst by Tropical Sweets Inc., a mid-sized California company that specializes in creating exotic candies from tropical fruits such as mangoes, papayas, and dates. The firm's CEO, George Yamaguchi, recently returned from an industry corporate executive conference in San Francisco, and one of the sessions he attended was on real options. Since no one at Tropical Sweets is familiar with the basics of real options, Yamaguchi has asked you to prepare a brief report that the firm's executives could use to gain at least a cursory understanding of the topics.

What are some types of real options? 1) Abandonment Option: This is an option to sell or close down a project. It is an American put option on the project's value. The strike price of the option is the liquidation (or resale) value of the project less any closing-down costs. When the liquidation value is low, the strike price can be negative. Abandonment options mitigate the impact of very poor investment outcomes and increase the initial valuation of a project.

What are some types of real options? 2) Expansion Option. This is the option to make further investments and increase the output if conditions are favourable. It is an American call option on the value of additional capacity. The strike price of the call option is the cost of creating this additional capacity discounted to the time of option exercise. The strike price often depends on the initial investment. If management initially chooses to build capacity in excess of the expected level of output, the strike price can be relatively small.

What are some types of real options? 3) Contraction Option. This is the option to reduce the scale of a project's operation. It is an American put option on the value of the lost capacity. The strike price is the present value of the future expenditures saved as seen at the time of exercise of the option.

What are some types of real options? 4) Option to defer. One of the most important options open to a manager is the option to defer a project. This is an American call option on the value of the project. 5) Option to extend. Sometimes it is possible to extend the life of an asset by paying a fixed amount. This is a European call option on the asset's future value.

What are the five steps for analyzing a real option? 1. DCF analysis of expected cash flows, ignoring the option. 2. Qualitative assessment of the real option’s value. 3. Decision tree analysis. 4. Standard model for a corresponding financial option. 5. Financial engineering techniques.

c. Tropical Sweets is considering a project that will cost $70 million and will generate expected cash flows of $30 per year for three years. The cost of capital for this type of project is 10 percent and the risk-free rate is 6 percent. After discussions with the marketing department, you learn that there is a 30 percent chance of high demand, with future cash flows of $45 million per year. There is a 40 percent chance of average demand, with cash flows of $30 million per year. If demand is low (a 30 percent chance), cash flows will be only $15 per year. What is the expected NPV?

Analysis of a Real Option: Basic Project Initial cost = $70 million, Cost of Capital = 10%, risk-free rate = 6%, cash flows occur for 3 years. Annual Demand Probability Cash Flow High 30% $45 Average 40% $30 Low 30% $15

Approach 1: DCF Analysis E(CF) =.3($45)+.4($30)+.3($15) = $30. PV of expected CFs = ($30/1.1) + ($30/1.12) + ($30/1.13) = $74.61 million. Expected NPV = $74.61 - $70 = $4.61 million

Investment Timing Option If we immediately proceed with the project, its expected NPV is $4.61 million. However, the project is very risky: If demand is high, NPV = $41.91 million. If demand is low, NPV = -$32.70 million

Investment Timing (Continued) If we wait one year, we will gain additional information regarding demand. If demand is low, we won’t implement project. If we wait, the up-front cost and cash flows will stay the same, except they will be shifted ahead by a year.