CJK & APT activities November 2-3, 2004 WWRF Steering Board Toronto, Canada November 2-3, 2004 WWRF Steering Board Toronto, Canada Youngkyun KIM Senior.

Slides:



Advertisements
Similar presentations
11 Research activities on technologies for future mobile communications in Asia-Pacific region Chair TG-IMT, APT Wireless Group.
Advertisements

GSC-13 Closing Plenary Summary Report Art Reilly, GSC-13 Chair Nicole Butler, ATIS Staff DOCUMENT #:GSC13-CL-37 FOR:Information SOURCE:ATIS AGENDA ITEM:8.
Progress report of the SATRC working group on spectrum 2 nd Meeting of SATRC Working Group on Spectrum in SAP-IV March 2014, Tehran, Iran.
DOCUMENT #:GSC15-CL-03 FOR:Presentation SOURCE:CCSA AGENDA ITEM:Closing Plenary 2.2 CONTACT(S):Zhiqin Wang GRSC-8 Summary Report Zhiqin Wang, GRSC-8 Chair,
01/06/2015 ITU-R Studies in GRSC high interest subjects Progress Report F. Leite, ITU-R 1GSC-9, Seoul SOURCE:ITU-R TITLE:ITU-R Studies in GRSC HIS - Progress.
GLOBAL ICT STANDARDISATION FORUM FOR INDIA (GISFI) Prof. Dr. Ramjee Prasad, CTiF, Aalborg University Fellow IEEE, FIET, FIETE, FWWRF - Founding Chairman,
ITU Regional Workshop on on Efficiency of the Frequency Spectrum Use in the Arab Region Amman (Jordan), 5 – 7 December 2011 ITU Arab Regional Office Presented.
DOCUMENT #:GSC15-PLEN-13r1 FOR:Presentation SOURCE:ARIB AGENDA ITEM:OPENING PLEN 6.1 CONTACT(S):Kohei Satoh Update ARIB.
DOCUMENT #:GSC15-PLEN-69; GSC15-GRSC8-10 FOR:Presentation SOURCE:ARIB AGEND ITEM:OPENING PLEN 12.2; GRSC 7.1 CONTACT(S):Kohei Satoh
TIA Report on Global Standards Collaboration 11 Meeting (GSC-11) Telecommunications Industry Association Dan Bart.
International Telecommunication Union ITU Asia and Pacific Regional Support for WSIS 2003 prepared by: Dr. Michael A. Calvano, Ph.D. Head, ITU Regional.
1 IoT Standardization Activities in CCSA China Communications Standards Association Duo Liu 21th meeting CJK UNIOT-WG Jun ,
1 CJK9, Zhangjiajie, China (CJK B3G #20) Summary of AWF-6 (31 st March – 3 rd April, Danang, Vietnam Zhangjiajia, China 8-10 April 2009 Juyeon Song
NID Expert Group Activities in ASTAP Jun Seob Lee Hyoung Jun Kim ETRI, Korea.
Doc.: 18-13/0032 Submission March, 2013 Michael Lynch, MJ Lynch & Associates LLCSlide 1 RR-TAG Opening Report Notice: This document has been prepared to.
ASIA-PACIFIC TELECOMMUNITY (APT) “Key Activities and Programs” TCT/TTA Joint Seminar “NGN Broadband Development and Implementation” 29 January 2009 By:
International mobile telecommunications
APEC EWG 23 Bangkok, Thailand Earthquake Response Cooperation Program for Energy Supply Systems Phase 2 Progress Report By Chinese Taipei May 16, 2002.
CJK IMT 28 Xi’an, China 2-3 June /n CJK IMT 28, Xi’an, China CJK-IMT Summary of AWG-10 HIROIKE, Akira
Overview of the 11 th CJK IT Standards Meeting (CJK-11) ARIB, TTC 1 M2M Meeting of Potential Consolidation Partners # March 2012 in Tokyo, Japan.
EC proposal: Formation of a Cooperation SIG Akinori Maemura APNIC 38 Brisbane, Australia Tuesday, 16th September 2014.
Report of Closing Plenary Shuichi Matsumoto (GSC Chair) Rapporteurs: Nicole Butler & Julian Pritchard SOURCE:GSC Chair TITLE:Report of Closing Plenary.
CJK9, Zhangjiajie, China 1/14 Discussion: [Drafted] 3GPPs works in CJK Cooperation CJK 9, Zhangjiajie, China April 8-10,2009 Changho RYOO
GSC-8090 SOURCE:TTA TITLE:IMT-2000 & Beyond IMT-2000 in Korea AGENDA ITEM:GTSC/GRSC Joint Plenary /04/2003GSC-8, OTTAWASlide 1 IMT-2000 and Beyond.
1/10 CJK IMT 25, Beijing, China TTA PG707 Status Report CJK IMT 25 Beijing, China May 19, 2010 CHUNG, Hyun Kyu (HK) CJK-IMT25-xxx.
1 Status Report on CJK NGN Working Group China Communications Standards Association 9 th CJK meeting April 2009 HeyuanXu, Chairman of NGN-WG.
International Telecommunication Union COPANT/PASC April ITU and international standards collaboration Gary Fishman Chairman ITU Telecommunication.
Fostering worldwide interoperabilityGeneva, July 2009 GSC-14 Closing Plenary Summary Report Malcolm Johnson, GSC-14 Chair Global Standards Collaboration.
ITU-R WP 5D Update Orlett W. Pearson, Report to TR-45.5 August 2012.
Status report on CJK NGN Working Group April 9, th CJK Standard Meeting Taesang Choi Chairman of CJK NGN Working Group.
WRC–12 Industry Debrief 23 April 2012 Agenda Items 1.1 Deletion of country footnotes 2 Incorporation by Reference 4 Review of ITU-R Resolutions and Recommendations.
CJK Standards Collaboration - Brief overview of CJK NID WG HyoungJun Kim Telecommunications Technology Association.
ITU-R Liaison Group Report - Session #64 Opening Plenary IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE L /0127 Date.
RADIO FREQUENCY SPECTRUM POLICY NOVEMBER Making South Africa a Global Leader in Harnessing ICTs for Socio-economic Development 2 WHAT IS SPECTRUM?
Asia Leading the future Yoshio UTSUMI, Secretary-General, ITU Forum Opening, ITU T ELECOM A SIA 2004 Busan, 7 September.
CJK B3G Standards Collaboration Jinsung Choi Ph.D TTA PG301 Chair & Vice-President of LGE, Mobile Communication Technology Research Lab. Telecommunications.
GRSC Report to GSC-9 Plenary Presented by Kyu Jin Wee- TTA.
Fostering worldwide interoperabilityGeneva, July 2009 GSC IMT Task Force Report Kohei SATOH Managing Director, ARIB Global Standards Collaboration.
Committed to connecting the world Preparing for WTSA-12 Status at TSAG July 2012 Bruce Gracie, TSAG Chairman.
Jeju, 13 – 16 May 2013Standards for Shared ICT TTA activities since GSC-16 Keun Hyeob Lee, President of TTA Document No: GSC17-PLEN-39 Source: TTA Contact:
GSC IMT Task Force Report Kohei SATOH ARIB DOCUMENT #:GSC13-PLEN-64r1 FOR:Presentation SOURCE:Kohei Satoh (ARIB) AGENDA ITEM:GRSC (7); Plenary (6.1) CONTACT(S):Kohei.
Jeju, 13 – 16 May 2013Standards for Shared ICT CJK activities on WPT Standardization Mr. YJ CHUNG (TTA) on behalf of CJK-WPT WG* Document No: GSC17-PLEN-24.
Jeju, 13 – 16 May 2013Standards for Shared ICT GSC Emergency Communications Task Force Report (GSC-EM TF) Presenter: Chantal Bonardi GSC-EM Task Force.
GSC-16 Closing Plenary Summary Report
GSC-14 Closing Plenary Summary Report
Status report on CJK NGN Working Group
WRC agenda item Perspectives from APT -
Jun Seob Lee Rapporteur of ASTAP NID EG TTA
Introduction to ECC PT1 February 2011.
Status report on CJK NGN Working Group
Preparations for the 2015 World Radiocommunication Conference (WRC-15)
THURAYA Proprietary Information
GSC Emergency Communications Task Force Report (GSC-EM TF)
TTA activities on IMT-Advanced
CJK B3G WG Report.
ITU Radio Issues in 2003 Progress Report ITU-R GSC /01/2019
Cindy Cook, GRSC-9 Chair, ISACC
Standardization Activities in TTC
GSC-16 Closing Plenary Summary Report
CCSA Standardization Activities on Cognitive Radio System
Update ARIB Activities on IMT Standardization
Standardization Activities in TTC
Annual Report 2010 CITEL March, 2011.
GSC IMT Task Force Report
CJK activities on WPT Standardization
Status report from ITU-R WP 5A on ITS activities
GSC IMT Task Force Report
Activities of ARIB on IMT Standards
GSC IMT Task Force Report
Report of GSC-12 Opening Plenary
Presentation transcript:

CJK & APT activities November 2-3, 2004 WWRF Steering Board Toronto, Canada November 2-3, 2004 WWRF Steering Board Toronto, Canada Youngkyun KIM Senior VP Samsung Electronics

WWRF SB, Toronto, 2-3 November Contents The 6 th CJK B3G WG meeting The 1 st APT Wireless Forum

WWRF SB, Toronto, 2-3 November CJK( China Japan Korea ) meeting The 6 th CJK B3G WG Meeting Participants: 23 ( ARIB/TTC(6), CCSA(10), TTA(7)) Chair : CCSA B3G WG chair, Mr. Wan Yi (CCSA) Discussed items - Introduction of each SDO’s B3G activities - Discussion of ITU-R WP8F Service WG activities - Service Questionnaire & spectrum calculation methodology - How to prepare joint responses - Discussion on CJK B3G Phase 1 collaboration The 7th CJK B3G WG Meeting Tentatively, will be held in Beijing from 8 to 9 December 2004 Objective : - Completion of first response on the questionnaire - Discussion on B3G technologies scope for CJK B3G WG Future work plan : - The response sent to AWF will be discussed and approved via AWF reflector. - The approved response will be delivered to ITU in January 2005 with the name of AWF.

WWRF SB, Toronto, 2-3 November The 1 st APT Wireless Forum Date & Venue : 7 to 9 September 2004, Busan, Korea Participants : 160 around 25 countries Chair : Dr. Youngkyun KIM (Samsung Electronics, Korea) Issues New Task Group-3 dealing with convergence issues of telecommunication and broadcasting services was established Spectrum WG created 5 sub working groups Sharing issue between IMT-2000 FWA and IMT-2000 (Chair: Ms. Covell, Qualcomm, Hong Kong) PPDR (Public Protection and Disaster Relief) (Chair: Mr. Bhatia, Motorola, India) Agreement on coordination for terrestrial service (Chair: Mr. Oh, ETRI) BWA (Broadband Wireless Access) and SDR (Software Defined Radio) (Chair: Mr. Prins,Cemdia Asia, Australia) Sharing studies for UWB, RF-ID (Chair: Mr. Lim Yuk Min, Singapore )

WWRF SB, Toronto, 2-3 November The 1 st APT Wireless Forum Each group outputs Spectrum WG Establish 5 Sub-Working Groups and develop their Terms of Referenc e and completion deadlines for their work. TG-1 Develop draft responses to questionnaire including the template of res ponses for the questions to which the template is effective Future work plan and working method TG-2 Finalize the report regarding the possibility of evolving FWA (Fixed Wir eless Access) that uses IMT-2000 radio access technology to full scal e IMT-2000 & get approval from AWF Next period study items considering developing countries Next Meeting Interim meeting will be in March 2005 Regular meeting will be in September/October 2005

WWRF SB, Toronto, 2-3 November ANNEX Overall Objective of AWF To promote new wireless applications To add value, and not duplicate, the work being undertaken by other relevant APT programs, and to work closely with other APT programs promoting a harmonized visions of wireless communications systems and services in the Asia-Pacific region to meet the emerging digital convergence era To provide cost effective and timely radiocommunications solutions To facilitate the transfer of technology

Thank you Q&A Thank you Q&A