Technical Working Group on Nuclear Power Plant Instrumentation and Control Vienna, May 2009 NATIONAL REPORT ON NUCLEAR POWER PLANT INSTRUMENTATION AND.

Slides:



Advertisements
Similar presentations
Reporting on I&C status and recommendations to IAEA
Advertisements

Programme Tx / Dx Demarcation Feb 08. Programme Topics cover in this presentation Back Ground Existing and future MTS substations Lines.
Sistan & Balouchestan Electric Power Distribution Company
Electrical, Control and Information Systems in the Enhanced CANDU 6 ® Electrical, Control and Information Systems in the Enhanced CANDU 6 ® Candu – Official.
RISK INFORMED APPROACHES FOR PLANT LIFE MANAGEMENT: REGULATORY AND INDUSTRY PERSPECTIVES Björn Wahlström.
BHEL – Electronics Division, Bangalore
1 Regulatory Challenges During and Following a Major Safety or Security Event Muhammad Iqbal Pakistan Nuclear Regulatory Authority Presentation at General.
© ABB Group August 13, 2015 | Slide 1 Power Generation Service Life Cycle Management for Power Plants Daniel Looser, Power Gen Europe in Amsterdam, June.
ELECTRICITY MARKET RESTRUCTURING AND INVESTMENT IN NUCLEAR POWER GENERATION Evidence From Power Uprates In U.S. Nuclear Industry Chen-Hao Tsai Advisor:
Challenges of a Harmonized Global Safety Regime Jacques Repussard Director General IRSN IAEA 2007 Scientific Forum.
Quality Management Systems: A Comparison of GE Energy & Škoda Power Katarina Hranaiova Christina Gasserova Jessica McKennaova SPRING 2007.
ACTION PROPOSAL FOR FLYWHEEL ENERGY TECHNOLOGY Enhance future grid reliability, interoperability, & extreme event protection In 20 years, the flywheel.
INTERNATIONAL ATOMIC ENERGY AGENCY Technical Committee Meeting of Technical Working Group on Nuclear Power Plant Control and Instrumentation May.
U.S. DOE Light Water Reactor Sustainability Program: Advanced Instrumentation & Controls and Human System Interfaces Research Pathway Bruce Hallbert, Idaho.
The JINR engineering infrastructure is a multi component structure of the interacting elements. The following subsystems have the greatest effect on integrative.
Utilizing BPL to create a 21 st Century Grid. Agenda > Electrical Infrastructure Review > Oncor Electric Delivery - Current Relationship > Project Status.
October 2009 Klaus Grensemann, Division WS 23 St. Petersburg 1 Development and Implementation of an Overall E-Navigation Strategy.
Generation Aino Ahonen CABABILITY OF APROS IN THE ANALYSES OF DIESEL LOADING SEQUENCES E. Raiko, H.Kontio, K.Porkholm, presented by A. Ahonen.
Nuclear Research Institute Řež plc 1 DEVELOPMENT OF RELAP5-3D MODEL FOR VVER-440 REACTOR 2010 RELAP5 International User’s Seminar West Yellowstone, Montana.
Opting for “Long Term Operations” Technical, economic and regulatory considerations MARC Conference June 8, 2010 Sean Bushart, EPRI Sr. Program Manager.
Solution for Future Electrical Supply in the Middle Europe Nuclear Power Ivo Kouklík
Software Aspects of PQ in a DG Context By Dr. Siri Varadan.
Prepared By :.  Introduction  Techniques Used  Case Study  Advantages  Application  Conclusion OUTLINE.
IAEA - Department of Nuclear Safety & Security
TWG-NPPIC, May 2009, Vienna: UK status1 Current status of NPP I&C in the United Kingdom T P Smyth AMEC, Knutsford, Cheshire, UK 22 nd Meeting of the Technical.
AREVA: Steps towards a global leadership in the energy industry
Modern approaches to developing hardware and software system for operation and emergency control of large-scale power grid A.B. OSAK, A.V. DOMYSHEV, E.Y.
Opportunities and Challenges Joseph Naser Electric Power Research Institute IAEA Technical Working Group on Nuclear Power Plant Control and Instrumentation.
> AREVA NP GmbH NRPP-G, AREVA NP All rights are reserved, see liability notice.
© 2010 Cisco and/or its affiliates. All rights reserved. 1 Managing Microsoft Applications with Cisco UCS Manager & PowerTool.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/1 Design Geoff Vaughan University of Central Lancashire,
1 ESTABLISHMENT OF REQUIREMENTS Module “ Development of regulatory framework for oversight of decommissioning Project BG/04/B/F/PP , Program “Leonardo.
Fukushima Lessons Learnt and Follow-up Activities of Rostechnadzor Alexey Ferapontov, Acting Chairman Second European Nuclear Safety Conference
Nuclear Power in the United States Joseph Naser Electric Power Research Institute IAEA Technical Working Group on Nuclear Power Plant Control and Instrumentation.
IAEA I&C Activities Presented by Björn Wahlström, Chairman TWG-NPP CI.
Configuration Management for Digital Upgrades Configuration Management Benchmarking Group 2008 Conference Scott Patterson Program Manager for I&C Obsolescence.
Centre for Energy Research, Hungarian Academy of Sciences A New Virtual Control Room System for the Paks NPP Full- Scope Simulator G. Házi, J. Páles, T.
Utility Engineers, PC.  Generation  Transmission  Distribution.
1 Review of Specifications for Digital Upgrades NHUG Summer Meeting July 17, 2008 Tim Mitchell Component Engineering Palo Verde Nuclear Generating Station.
International Atomic Energy Agency 1 Grid, Industrial involvement and procurement Akira OMOTO DIR, NENP.
IAEA International Atomic Energy Agency IAEA Safety Standards for Research Reactors W. Kennedy Research Reactor Safety Section Division of Nuclear Installation.
Regional Meeting on Applications of the Code of Conduct on Safety of Research Reactors Lisbon, Portugal, 2-6 November 2015 Diakov Oleksii, Institute for.
P1. Overview of Objectives & Agenda of Technical Meeting
© 2014 HDR Architecture, Inc., all rights reserved. © 2014 HDR, Inc., all rights reserved.
4rd Meeting of the Steering Committee on Competence of Human Resources for Regulatory Bodies Vienna, 4-7 December 2012 Current Status of the Human Resources.
Nuclear Research Institute Rez plc. Division of Integrity and Technical Engineering BULATOM June LESSONS LEARNED FROM AGING MANAGEMENT ACTIVITIES.
"... To design the control system that effectively matches the plant requires an understanding of the plant rivaling that of the plant's designers, operators,
Current Status of the National Nuclear Infrastructure and Human Resources Development in the Republic of Belarus TM/WS on Topical Issues on Infrastructure.
The 22nd Meeting of The IAEA Technical Working Group on Nuclear Power Plant Instrumentation & Control ( TWG-NPPIC) May 2009.
Risk-informed On-Line Maintenance at Cofrentes NPP IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Workshop Information IAEA.
IAEA International Atomic Energy Agency The Human and Organizational Part of Nuclear Safety Monica Haage – International Specialist on.
I & C.
IAEA International Atomic Energy Agency New IAEA Safety Guide (information) Human Factor Engineering for NPP (DS492) Alexander Duchac SAS,NSNI.
IAEA International Atomic Energy Agency Development of the Basis Document for Periodic Safety Review for Research Reactors William Kennedy Research Reactor.
Nuclear Research Proposal for EURATOM/HORIZON2020 call Karel Katovsky, PhD. Nuclear Power Research Group Department of Electrical Power Engineering Faculty.
DECOMMISSIONING OF NUCLEAR POWER PLANTS IN THE CZECH REPUBLIC Peter Lietava Division of Radioactive Waste and Spent Fuel Management State Office for Nuclear.
Survey of Smart Grid concepts and demonstrations Smart substation Ari Nikander.
Dr. Vidya Vankayala Director, Grid Modernization (604) Richard Guo
An overview of I&C Systems in APR 1400 Parvaiz Ahmed Khand December 28, 2007.
Knowledge-centric Plant Information Model
Technical-economical study of Czech NPPs Long Term Operation P
Dept. of Nuclear and Quantum Engineering
Session Name: Ageing Management
Regulatory Oversight of HOF in Finland
Nuclear Program in Czech Republic
PSS verification and validation
Yes, Nuclear can be Bold and Innovate
I&C requirements and configuration management
Mikael Olsson Control Engineer
Presentation transcript:

Technical Working Group on Nuclear Power Plant Instrumentation and Control Vienna, May 2009 NATIONAL REPORT ON NUCLEAR POWER PLANT INSTRUMENTATION AND CONTROL STATUS IN CZECH REPUBLIC AND RECOMMENDATIONS TO IAEA JIRI PLISKA I&С ENERGO

2www.ic-energo.eu CONTENT Major projects at the NPP Dukovany and NPP Temelin I&С system refurbishment project at the NPP Dukovany Other I&С projects at the NPP Dukovany Recommendation to IAEA

3www.ic-energo.eu Main projects NPP Dukovany – two important and closely interlinked long- term projects of large scale: 16 TERA safely; to achieve yearly production of 16 TWh by 2013 Long Time Operation (LTO); to operate NPP beyond the designed service life term = 2015 it means to 2025 or 2035 or 2045 NPP Temelin 15 TERA safely; to achieve yearly production of 15 TWh by 2012 All of those projects incorporate a number of partial projects and They are a part of a general business plan of the ČEZ – Reduction of emissions and increase in efficiency

4www.ic-energo.eu 16 TERA Safely The main goal of the project is an increase in efficiency and power output – to achieve yearly production of 16 TWh by 2013 and to maintain it for at least 20 years by utilization: reserves of NPP Dukovany original project, experience of personnel with the management of outage on condition that the nuclear power plant retains its place among the best rated nuclear plants in the world, especially in the field of safety and operation indicators. Project involves a number of partial projects aimed at increasing the output and production by means of equipment modernization, reduction of outage time and improvements in Load Factor (LF) These partial projects are incorporated under a single umbrella project.

5www.ic-energo.eu 16 TERA Safely (continue) The project partial goals involve : an increase in output of the individual blocks to 500 MWe, a reduction of outages by 35 days a year on average The modifications to equipment include mainly: a replacement of the LP parts of the turbines a replacement of the HP parts of the turbines a modernization of the block transformers and the transformer monitoring system a modification of the generator stators changes of algorithms I&C M1, M2 an upgrade of the core surveillance system Scorpio

6www.ic-energo.eu ARCHITECTURE OVERVIEW I&C project involves those unit control systems : RSBP – Primary circuit systems and equipment part (M3) RSBT – Turbine part (M4) RSBS – Secondary circuit systems and equipment part (M5) IS DIAG – diagnostic and information system for M345 MCR / ECR – corresponding modifications to the main control rooms and emergency control rooms

7www.ic-energo.eu ARCHITECTURE OVERVIEW Platforms, Safety category A, B, C (, N): HW for Technological level (A) – Automating system ZAT–RA, HW for Technological level (B) – Automating system ZAT–PRIMIS, HW for Technological level (C) – Automating system ZAT–DV, HW for Process level (C) – Automating system ZAT–FS with computer stations and servers of industrial design, HW for Operator (HSI) level (C) – Automating system ZAT–FS with computer stations of industrial design, SW for Technological level (B) – Operating system OS–9000 and applications for creating, managing and maintaining of projects PERTINAX IDE, SW for Process level (C) – Operating system MSW/XP and a high- performance industrial computer server (VS) with computing modules, SW for Operator (HMI) level (C) – Operating system MSW/XP and MS SQL server, Wonderware InTouch and Wonderware Industrial SQL server.

8www.ic-energo.eu ARCHITECTURE OVERVIEW Concept: Concept maintains the existing concept of division into three mutually independent systems (divisions), non-system, MCR, ECR

9www.ic-energo.eu ARCHITECTURE OVERVIEW Disposition, Function: Disposition of new systems remain the same in comparison to current one Scope of functions is maintained with an exception: - new turbine regulation (shift of the limit between the electric and hydraulic part of the turbine regulation) - self-diagnostics - periodic testing

10www.ic-energo.eu ARCHITECTURE OVERVIEW Communication: deterministic, independent on technology state communication redundant optical ring for safety category B redundant optical ring for safety category C SDL from system of higher safety category to the system of lower category

11www.ic-energo.eu M345 Refurbishment (continue) Schedule: Number of shutdow ns Unit B1      3+2 Unit B2     3+1 Unit B3  3+2 Unit B4    3+2  - short outage  - long outage

1 st OUTAGE

2 nd OUTAGE

3 rd OUTAGE

4 th OUTAGE

5 th OUTAGE

FINAL

19www.ic-energo.eu Others I&С projects at NPP Dukovany Cabling management system Transformer monitoring system On-line monitoring system SCORPIO system modernization

20www.ic-energo.eu Recommendation to IAEA Cabling management system Topic Common language for unified description of complex cabling systems. Motivation Cabling system belongs to the critical subsystems of NPPs. It covers both electric systems and I&C systems. Goal To create a common language for unified description of complex cabling systems using the ISO approach and principles. (Generic Data Model and Reference Data Library)

21www.ic-energo.eu Recommendation to IAEA (continue) Measurement reliability and accuracy Topic Measurement reliability and accuracy enhancement Motivation Measurement reliability and accuracy is a permanent and serious requirement of I&C system functions to ensure safety, reliability and economic goals of NPP operators Goal To elaborate an analysis of available methods based on advanced data processing and process simulation and designed to improve measurement reliability and accuracy. On the basis on this analysis to give recommendation and guideline for using these methods to operators, regulators and vendors

Thanks for attention Jiri PLISKA telefon: