CCFW32 – 25th July 2002 – JETF. Durodié LPP-ERM/KMS1 Work program for Validation of External Matching for The ITER-ICRF System F. Durodié CCFW32, 25 July.

Slides:



Advertisements
Similar presentations
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Advertisements

Chapter 3 Matching and Tuning
ELCT564 Spring /13/20151ELCT564 Chapter 5: Impedance Matching and Tuning.
ENE 428 Microwave Engineering
MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
Enabling Technology on Alcator C-Mod Jim Irby MIT-PSFC.
PETS components and waveguide connections CLIC Workshop 2007 David Carrillo.
Lorentz force detuning measurements on the CEA cavity
30 th September 2004 High Power RF Couplers James Rogers High Power RF Couplers ELSRF Daresbury Laboratory.
ELECTRON CYCLOTRON SYSTEM FOR KSTAR US-Korea Workshop Opportunities for Expanded Fusion Science and Technology Collaborations with the KSTAR Project Presented.
Introduction The input network of the power amplifier will be designed in the example. The network synthesized will be expanded to allow for biasing of.
Integration of Cavities and Coupling Coil Modules Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting March 28 – April 1, 2004.
Stephen Milton Undulator System 20 April, 2006 LCLS Undulator System Update S. Milton, ANL FAC, April 20 th, 2006.
Electromagnetics (ENGR 367) The Smith Chart: A Graphical Method for T-lines.
Chapter 5: Impedance Matching and Tuning
Microwave Amplifier Design Blog by Ben (Uram) Han and Nemuel Magno Group 14 ENEL 434 – Electronics 2 Assignment
IOS-5.2 Maintaining ICRH Coupling in expected ITER regime Spokes person: M. Goniche M.-L. Mayoral (JET), R. Pinsker (DIII-D), L. Colas (TS), V. Bobkov.
SLHC-PP – WP7 Critical Components for Injector Upgrade Plasma Generator – CERN, DESY, STFC-RAL Linac4 2MHz RF source Thermal Modeling Gas Measurement and.
1/10CCFW 34, Garching, June 24th TORE SUPRA Association Euratom-Cea S. BRÉMOND A few very simple technical elements on the internal / external matching.
Progress Towards RF Steady State Systems For Fusion Devices
M Nightingale/A WaldenArc Detection Meeting - JET - 4 August 2005 ARC DETECTION FOR THE EP ANTENNA - THE OPERATOR’S PERSPECTIVE Mark Nightingale, Tony.
Microwave Amplifier Design Blog by Ben (Uram) Han and Nemuel Magno Group 14 ENEL 434 – Electronics 2 Assignment
EKT 441 MICROWAVE COMMUNICATIONS
In Engineering --- Designing a Pneumatic Pump Introduction System characterization Model development –Models 1, 2, 3, 4, 5 & 6 Model analysis –Time domain.
F. Durodié18-Jan-2005JET-EP ITER-Like Antenna PB2005/1 JET-EP ITER-like ICRH Antenna - Technical Status Project Board 18 January :00- 16:00 JET.
I. Monakhov, ICRH CT antennas matching, SOFT-23 satellite meeting, Venice, Italy, September 21, 2004, Slide 1 I. Monakhov, A. Walden, T. Blackman, D. Child,
ASIPP EAST Overview Of The EAST In Vessel Components Upgraded Presented by Damao Yao.
Introduction to Controlling the Output Power of a Transistor Stage A load network will be designed to maximize the output power obtainable from the Mitsubishi.
IC IDRM2: 18 May 2011 P. Dumortier et al. Slide 1 Validation of the Electrical Properties of the ITER ICRF Antenna using Reduced-Scale Mock-Ups P. Dumortier,
Euratom TORE SUPRA G. Bosia Proposals for the ITER IC System R&D CCFW /11/2004 Proposals for ITER IC systems R&D developments G. Bosia, B. Beaumont,
The principle of SAMI and some results in MAST 1. Institute of Plasma Physics, Chinese Academy of Sciences, Hefei, Anhui, , China 2. Culham Centre.
Aug 9, 2008S. Kahn -- HCC Magnet Plans1 HCC Magnet Future Plans Steve Kahn Aug 9, 2008 NFMCC Friday Meeting.
1 Status of EMMA Shinji Machida CCLRC/RAL/ASTeC 23 April, ffag/machida_ ppt & pdf.
WP3 Required interfaces for cryostat design / integration Patxi DUTHIL SPL 3 rd Collaboration Meeting, CERN, Geneva November 12 th 2009.
39th Meeting of the Co-ordinating Committee on Fast Wave Heating and Current Drive Arc Detection Meeting - JET - 4th August 2005 Presented by M. Graham.
2.1GHz cavity without cell-to-cell coupling slots – 1.875” beam pipe Binping Xiao Aug
SPL Seminar 2012 BE-RF-LRF HOM couplers for SPL cavities Kai Papke 1 Comparison of different design approaches.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
704MHz Warm RF Cavity for LEReC Binping Xiao Collider-Accelerator Department, BNL July 8, 2015 LEReC Warm Cavity Review Meeting  July 8, 2015.
F. Durodié4-Aug-2005JET-EP ITER-Like Antenna / CCFW39 / JET Review of the Status of the Arc Detection Issues and Proposals for the JET-EP ITER-like ICRH.
Plasma Facing PFA Antenna Group POLITECNICO DI TORINO 19 Topical Conference on Radio Frequency Power in Plasmas June 1-3, Newport 1 Mitigation of.
Revised SPL-study work-plan W. Weingarten 3 May 20101SPL Cavity WG Meeting.
1.3GHz Input Coupler for ILC
2.1 GHz Warm RF Cavity for LEReC Binping Xiao Collider-Accelerator Department, BNL June 15, 2015 LEReC Warm Cavity Review Meeting  June 15, 2015.
Nov 3, 2008 Detection System for AdV 1/8 Detection (DET) Subsystem for AdV  Main tasks and requirements for the subsystem  DC readout  Design for: the.
Modulators for DB klystrons: requirements and plans for developments Serge Pittet, David Nisbet TE EPC.
DC Spark Developments Nick Shipman - Thursday, 16 August
1 DWS- SOFT Load tolerant matching Evaluated the conjugate tee configuration in plasma conditions Strong current imbalance between the straps was.
Summery of the power coupler session at the LCWS13 workshop E. Kako W.-D. Möller H. Hayano A. Yamamoto All members of SCRF WG November 14, 2013.
Euratom TORE SUPRA  CEA comments on documents provided by the Project Leader Introduction I Performance issues II Operation Issues III. Manufacturing.
LHC Cryostat evaluation Nikolay Solyak Thanks Rama Calaga, Tom Peterson, Slava Yakovlev, Ivan Gonin C11 workshop. FNAL, Oct 27-28, 2008.
SPL waveguide distribution system Components, configurations, potential problems D. Valuch, E. Ciapala, O. Brunner CERN AB/RF SPL collaboration meeting.
Direct Calculation of Tuner Losses Dave Birnbaum K2LYV.
Garching,June 24 th, 2003F. Durodié LPP-ERM/KMS – CCFW Comments on the Report on Internal Matching for ITER Garching 24 June 2003.
Hanyang University 1/24 Microwave Engineering Chapter 8.8 Wonhong Jeong
CW Cryomodules for Project X Yuriy Orlov, Tom Nicol, and Tom Peterson Cryomodules for Project X, 14 June 2013Page 1.
PXIE RFQ Engineering Design Steve Virostek Engineering Division Lawrence Berkeley National Laboratory April 10, 2012 Project X Collaboration
Prototype Cryomodule FDR Ken Premo 21 – 22 January 2015 High Power Coupler Design.
ITER ICRF R&D - ERM-KMS proposals P. Dumortier, F. Durodié, R. Koch, P. Lamalle, F. Louche, A. Messiaen, R. Weynants CCFW 37, Brussels, 22 November.
CLIC Civil Engineering & Infrastructure Working Group Meeting
Manipulating RF phase and amplitude at high power level.
X-band high-power variable RF splitter
Second SPL Collaboration Meeting, Vancouver May 2009
ENE 429 Antenna and Transmission lines Theory
CEPC Input Coupler Discuss 6th IHEP-KEK SCRF Collaboration Meeting
ENE 429 Antenna and Transmission lines Theory
IMPEDANCE MATCHING & SMITH CHART
Remote Handling Workshop Introduction
Electron Collider Ring Magnets Preliminary Summary
ENE 428 Microwave Engineering
Presentation transcript:

CCFW32 – 25th July 2002 – JETF. Durodié LPP-ERM/KMS1 Work program for Validation of External Matching for The ITER-ICRF System F. Durodié CCFW32, 25 July 02, Culham (JET) Motivation Work program FP5 and FP6

CCFW32 – 25th July 2002 – JETF. Durodié LPP-ERM/KMS2 Motivation Concerns raised about the FDR ITER ICRF System –High Voltages and Electric Fields in the Tuner stubs 40 kV (DDD) Need for ceramic supports to keep tight spacing (15mm) (DDD) –Need for High Current Sliding Contacts 4 kA sliding over 1.3m in vacuum (DDD) –Bandwidth Initially the straps and feeders in the FDR design were too long to guarantee operation above 55 MHz  In the DDD the straps and feeders are shortened to 30cm (in the tables but not in the drawings) to recover the bandwidth. –Overall Complexity

CCFW32 – 25th July 2002 – JETF. Durodié LPP-ERM/KMS3 Ex-Vessel Matching Shorter Straps 0.26m as in JET-EP –Stack 3 RDL in height –Power per RDL 1.7 MW Other Assumptions on Straps, Feeders and coupling as in DDD FDR Tuners AFBC W(V) W(I)

CCFW32 – 25th July 2002 – JETF. Durodié LPP-ERM/KMS4 Motivation (2) Is there enough scientific grounds to justify complexity of the FDR in- vessel matching when there is another solution with lower electrical stress (30 kV vs. 40 kV) ? In its report to the CCE-FU of 9 Jul 2001, the FPC endorsed the recommendation of the AHG on the JET-EP Phase II devoted to the ICRH antenna design (June 7, 2001) to request all interested Associations and EFDA to develop a programme of design and R&D work for the further development of the ITER ICRF array design and technology using alternative internal concepts and external matching concepts Two Task Agreements are put in place to study alternatives to the FDR baseline design : –An ITER relevant lumped capacitor –An Ex-vessel matching concept/design

CCFW32 – 25th July 2002 – JETF. Durodié LPP-ERM/KMS5 Work Program FP5 (till April 2003) Conceptual Design of Ex-Vessel Matching for ITER-FEAT –Identification of the Circuit + Electrical Analysis Select for compactness of tuning elements compatible with the overall requirements on electrical performance –Identification/Specification of Space Requirements – compatibility with fundamental ITER requirements (e.g. cryostat, bioshield,…) and requirements appearing from the FDR that could be relaxed RF components to implement the circuit The RF components that presently are not yet CW capable and the R&D required for those components –Input/Liaison with ITER required Torus and RF sources buildings layout drawings All other requirements specific to the area just outside the bio shield where the ex- vessel matching components will be located JET-EP ITER-like ICRF antenna

CCFW32 – 25th July 2002 – JETF. Durodié LPP-ERM/KMS6 Ex-Vessel Matching RF components (Vacuum Window) –The electrical stress is within the present day use on several experiments (< 30 kV). –A design exists for a CW vacuum window (Kaye, Walton) –Document operational experience of the LHD CW vacuum window. Ex-Vessel Transmission Line components –Phase-shifters and Stubs Investigate what are the limits for “standard” (dry) components (e.g. Spinner…) Investigate if “liquid” components (LHD) can be optimized for size –The stub has successfully been tested CW to 46 kV at 50 MHz –The LHD phase-shifter has been redesigned new tests could take place April 2003 –Cooling and Losses Document operational experience of the LHD cooled transmission line components. Ex-Vessel Capacitors –May still be the most compact solution but other ELM resilient circuits not requiring capacitors are emerging. (Goulding, Lamalle, Monakhov)

CCFW32 – 25th July 2002 – JETF. Durodié LPP-ERM/KMS7 Work Program FP6 ( ) JET-EP ICRF Launcher : experimental confirmation of –short strap design philosophy as a way to increase power density –performance of the ELM resilient nature of the circuit with real ELMs and H-mode SOLs (stability of control of the antenna array) –It appears to be possible to test an ITER relevant capacitor on the JET-EP antenna towards the end of the program : Remove present inner VTL and capacitors, replace the contacting flange on the feeder with the fixed electrode part of the “Open Capacitor or All-metal” capacitor, a plug-in inserted in the Outer-VTL caries the variable electrode, T-junction and Impedance transformer. Possibly size may limit operation to the upper frequencies (> 50 MHz), Disruption considerations may limit the plasma performance. BUT It may be an unique opportunity to validate an “open capacitor” facing an ELMing H-mode plasma Further detailed engineering and design of the RF components identified in the FP5 work program –TBD as components and specifications become clear during FP5 : collaboration with industry (e.g. Spinner, …) or effort (e.g. the launcher) from association(s) –follow-up of results obtained on the liquid filled transmission lines of LHD

CCFW32 – 25th July 2002 – JETF. Durodié LPP-ERM/KMS8 Replace Inner VTL with plug-in carrying Variable electrodes, T-Junction and Transformer Replace (bolted) finger contact with fixed electrodes on the feeder ends

CCFW32 – 25th July 2002 – JETF. Durodié LPP-ERM/KMS9 Array Stability Control Algorithm Studies are starting : –(MatLab-Simulink) –Use full impedance matrix from ICANT Later more refined models from MWS are expected –Will be able to use complex (amplitude, phase) power sources driving the array (now 0 and  ). –Can inject errors, noise (electric, mechanical), dead bands etc… –First “look and feel” : touchy Need to limit all sources to the one having the toughest conditions Consequences for a large array ? –Need to understand and control –Experimental verification on JET-EP

CCFW32 – 25th July 2002 – JETF. Durodié LPP-ERM/KMS10 Array Stability Only toroidal coupling No linkage between sources Slightly different in starting values of the capacitor Can be solved by linking the sources