Accessing the GEF and the GEF Project Cycle GEF Expanded Constituency Workshop Managua, Nicaragua March 3-4, 2015.

Slides:



Advertisements
Similar presentations
GEF Training for New Agencies 1 November 2013 Washington D.C. The System for Transparent Allocation of Resources (STAR) Sonja S. Teelucksingh.
Advertisements

GEF PROJECT TEMPLATES ANDGUIDELINES George Manful (PhD) Senior Task Manager, Climate Change UNEP UNFCCC Asia and Pacific Regional Workshop on Preparing.
GEF Expanded Constituency Workshop
Accessing the GEF and the GEF Project Cycle GEF Expanded Constituency Workshop Windhoek, Namibia February 17-18, 2015.
OPTIONS AND REQUIREMENTS FOR ENGAGEMENT OF CIVIL SOCIETY IN GEF PROJECTS AND PROGRAMMES presented by Faizal Parish Regional/Central Focal Point GEF NGO.
GEF Project Cycle GEF Expanded Constituency Workshop 22 to 24 March, 2011 Kyiv, Ukraine.
GEF Expanded Constituency Workshop Managua, Nicaragua March 3-4, 2015
GEF Expanded Constituency Workshop 5 to 6 November 2012 New Delhi, India Roles and Responsibilities of Council Members and Focal Points.
Home William Ehlers Team Leader, External Affairs GEF Familiarization Seminar Washington, DC November 1 st, 2013 What is the GEF?
GEF Policies and Processes in GEF 4 Sub-regional Workshop for GEF Focal Points Europe and the CIS 7-8 March 2007, Istanbul.
GEF Project Cycle GEF Expanded Constituency Workshop April 5 – 7, 2011 Da Lat, Vietnam.
GEF Project Cycle Sub-Regional Workshop for GEF Focal Points in the Pacific SIDS Auckland, New Zealand, September 2008.
LDCF/SCCF Climate Change Adaptation Strategy GEF Expanded Constituency Workshop 27 – 29 September 2011 Honiara, Solomon Islands.
GEF Project Cycle Sub-Regional Workshop for GEF Focal Points in Asia May 2008, Manila.
System for Transparent Allocation of Resources: STAR GEF Expanded Constituency Workshop Windhoek, Namibia February 17-18, 2015.
WHAT IS THE GEF? History and Structure GEF Expanded Constituency Workshop Tbilisi, Georgia June 22-24, 2015.
Evaluation in the GEF and Training Module on Terminal Evaluations
GEF and the Conventions GEF Expanded Constituency Workshop 1 to 3 November 2011 Cape Town, South Africa.
Lily Uy Hale Sr. Operations Officer Operations and Business Strategy GEF Familiarization Seminar Washington, DC January 17 – 19, 2012 How to Access GEF.
Mobilizing Resources through Programmatic Approaches GEF Expanded Constituency Workshop February 15-17, 2011 Hotel Memling, Kinshasa, DR Congo.
How to Access GEF Financing & The GEF Secretariat New Agency Training May 2015 Dr. Yasemin Biro-Kirtman Senior Environmental Specialist - GEFPPO.
GEF Project Cycle Seminar for new GEF Project Agencies (Introduction to the GEF) Washington, DC May 28-29, 2015.
Country Presentation- GEF Operational Focal Point, Sri Lanka GEF Sub-Regional Workshop 2-3 December 2007, Bali, Indonesia Anura Jayatilake Director, Environmental.
Accessing the GEF & GEF Project Cycle GEF Expanded Constituency Workshop Colombo, Sri Lanka March 17-18, 2015.
GEF Project Cycle GEF Expanded Constituency Workshop 11 – 13 October 2011 Tashkent, Uzbekistan.
GEF Policies and Processes in GEF 4 Sub-regional Workshop for GEF Focal Points Eastern and Southern Africa Nairobi, May 2007.
Click to edit Master title style Click to edit Master subtitle style Overview of Policies & Procedures in GEF 4 Sub-regional Workshop for GEF Focal Points.
System for a Transparent Allocation of Resources - STAR GEF Expanded Constituency Workshop 11 – 13 October 2011 Tashkent, Uzbekistan.
SUB-REGIONAL WORKSHOP FOR GEF FOCAL POINTS IN THE MIDDLE EAST, NORTH AFRICA, AND WEST ASIA CAIRO, EGYPT, OCTOBER 2009 System for Transparent Allocation.
Institutional Structure of the GEF William Ehlers, Head, External Affairs Team American University Seminar April 9, 2012 Washington, DC.
System of Transparent Allocation of Resources - STAR GEF Expanded Constituency Workshop March 1 – 3, 2011 Kyiv, Ukraine.
GEF Project Cycle GEF Expanded Constituency Workshop 1 to 3 November 2011 Cape Town, South Africa.
System of Transparent Allocation of Resources - STAR GEF Expanded Constituency Workshop February 15-17, 2011 Hotel Memling, Kinshasa, DR Congo.
Institutional Structure of the GEF GEF Expanded Constituency Workshop September 2011 Honiara, Solomon Islands.
GEF Policies and Processes in GEF 4 Sub-regional Workshop for GEF Focal Points East and Southeast Asia Bangkok, 2-3 April.
GEF Project Cycle GEF Expanded Constituency Workshop September 2011 Honiara, Solomon Islands.
Institutional Structure of the GEF GEF Expanded Constituency Workshop February 15-17, 2011 Hotel Memling, Kinshasa, Democratic Republic of Congo William.
SUB-REGIONAL WORKSHOP FOR GEF FOCAL POINTS IN ASIA HANOI, VIETNAM MARCH 10-12, 2010 GEF-5 System for Transparent Allocation of Resources 1.
GEF Project Cycle GEF Expanded Constituency Workshop March 1-3, 2011 Belize City, Belize.
How to Access GEF/ LDCF/SCCF Trust Fund Resources: The GEF Project Cycle Seminar for new GEF Project Agencies (Introduction to the GEF) Washington, DC.
GEF Training for New Agencies May 2015 Washington D.C. The System for Transparent Allocation of Resources (STAR) Sonja S. Teelucksingh.
System for a Transparent Allocation of Resources - STAR GEF Expanded Constituency Workshop 15 to 17 February 2012 Dead Sea, Jordan.
Sub-Regional Workshop for GEF Focal Points in Eastern and Southern Africa Sandton, South Africa, 3-4 November 2010 System for Transparent Allocation of.
Developing National GEF Strategies and Setting Priorities Nino Tkhilava GEF Operational Focal Point in Georgia Europe and CIS workshop for GEF Focal Points.
System of Transparent Allocation of Resources - STAR GEF Expanded Constituency Workshop March 1 – 3, 2011 Belize City, Belize.
Mobilizing Resources through Programmatic Approaches GEF Expanded Constituency Workshop March 1-2, 2011 Belize City, Belize.
GEF Expanded Constituency Workshop
GEF Expanded Constituency Workshop
GEF Expanded Constituency Workshop
System for a Transparent Allocation of Resources - STAR
GEF governance reforms to enhance effectiveness and civil society engagement Faizal Parish GEC, Central Focal Point , GEF NGO Network GEF-NGO Consultation.
Mobilizing Resources through Programmatic Approaches
THE GEF QUIZ! History-Structure-Policies
System for a Transparent Allocation of Resources - STAR
Mobilizing Resources through Programmatic Approaches
GEF Project & Program Cycle & Key Policies GEF-7 National Dialogue
LDCF/SCCF Climate Change Adaptation Strategy
Mobilizing Resources through Programmatic Approaches
Mobilizing Resources through Programmatic Approaches
LDCF/SCCF Climate Change Adaptation Strategy
System for a Transparent Allocation of Resources - STAR
LDCF/SCCF Climate Change Adaptation Strategy
LDCF/SCCF Climate Change Adaptation Strategy
Roles and Responsibilities of Council Members and Focal Points
GEF and the Conventions
GEF and the Conventions
GEF Project Cycle Sub-Regional Workshop for GEF Focal Points
LDCF/SCCF Climate Change Adaptation Strategy
Mobilizing Resources through Programmatic Approaches
The GEF-7 System of Transparent Allocation of Resources (STAR) GEF Expanded Constituency Workshop Nadi, Fiji July 2019.
Presentation transcript:

Accessing the GEF and the GEF Project Cycle GEF Expanded Constituency Workshop Managua, Nicaragua March 3-4, 2015

Acronyms Used in this Presentation FSP = Full-Sized Project MSP = Medium-Sized Project EA = Enabling Activities PA = Programmatic Approach MIA=Minamata Convention Initial Assessment ASGM NAP = “Artisanal and Small Scale Gold Mining” National Action Plan PIFs = Project Identification Form/concept of a project PFD = Program Framework Document PPG = Project Preparation Grant

GEF Financing Financing Objective: to provide resources to recipient countries to meet the agreed incremental cost of activities that generate global environmental benefits (GEBs). GEF Trust Fund, Least Developing Countries Fund (LDCF), Special Climate Change Fund (SCCF) & Nagoya Protocol Implementation Fund (NPIF). Who can apply? A GEF country member government, any eligible individual or group may propose a project through the OFP. GEF Operational Focal Point (OFP) plays a key role in assuring that GEF projects are aligned to meet the needs and priorities of the respective country.

Eligibility of Project Proposal A project proposal has to fulfill the following criteria for consideration for GEF financing, : It is undertaken in an eligible country and is consistent with country’s national priorities and programs. It addresses one or more of the GEF Focal Area objectives in improving the global environment or advancing the prospect of reducing risks to it. It is consistent with the GEF operational strategy. It seeks GEF financing only for the agreed incremental costs on measures to achieve global environmental benefits It involves the stakeholders in project design and implementation. It is endorsed by the government(s) of the country/ies in which it will be implemented.

Accessing the GEF Trust Fund TRADITIONAL MODE Project proponents work closely with national GEF Operational Focal Points (who formally endorse project concepts) and the GEF Partner Agency, to develop concepts and move through the project cycle and are approved either by the GEF Council or the GEF CEO, depending on the type of project. DIRECT ACCESS MODE In response to country request to improve country ownership, country drivenness and capacity building Project proponents work directly with the GEF Secretariat without going through a GEF Agency; projects follow the same project eligibility criteria and focal area strategic objectives.

Types of GEF Projects GEF project types by Grant Size: Full-Sized Projects (FSPs): GEF grant > $2 million Medium-Sized Projects (MSPs): GEF grant < $2 million Enabling Activities (EAs): GEF grant is capped by respective focal area threshold: Biodiversity and Climate Change = up to $500,000; Land Degradation = up to $150,000 Chemical and Waste (MIA = $200,000; Persistent Organic Pollutants and ASGM NAP=$500,000) Programmatic Approach (PA) Small Grants Program (max $50,000) MIA=Minamata Convention Initial Assessment ASGM NAP = “Artisanal and Small Scale Gold Mining” National Action Plan

Project Cycle Steps Two major approval steps for Full-Sized Projects: Council and the GEF Secretariat: 1.Council approval of work program 2.CEO endorsement of the project document GEF Agency: 1.Approval of the project by the GEF Agency and implementation start; 2.Completion of implementation, terminal evaluation and financial closure.

Full-Sized Project Cycle Council approval of Work Program* CEO endorsement of project GEF Agency approval of project** Project implementation and continues to completion*** * Work Program consists of PIFs cleared by the CEO ** GEF Agency approval of project signifies start of project implementation *** Project completion follows terminal evaluation and financial closure

Medium-Sized Project Cycle  One-step approach, preferred: Final MSP request and project document submit to the Secretariat for CEO approval, on a rolling basis. As needed, a PPG of up to $50,000 can be requested with MSP submission.  Two-step approach, only if required: Submission of a PIF with PPG request, if needed Submission of a final MSP document plus a MSP Approval Request for CEO approval

Enabling Activities follow two paths: Direct Access (follow direct access policy – applies the World Bank Operations Policies and Procedures):  Country applies directly to the Secretariat for funding Regular procedures :  Country works with a GEF Partner Agency to access funding. Enabling Activities Project Cycle

Programmatic Approach Cycle The new programmatic approach: approved by Council approval in the October 2014 Council meeting. Steps include:  Council approval of a Program Framework Document (PFD) included in a work program;  CEO endorsement of fully prepared child projects under the program

Features of a Program  Key document: Program Framework Document (PFD).  All child projects under the Program have to be submitted for CEO endorsement by a deadline (or Program Commitment Deadline) agreed by relevant stakeholders during the preparation of the program concept or PFD.  Child projects can apply for project preparation funding through submission of a PPG Request.

Project Review Criteria  Country eligibility and ownership  Global Environment Benefits  GEF Focal area strategy  Agency’s Comparative advantage  Resource availability  Project consistency  Project design  Project financing and co-financing  Monitoring and evaluation; and  Agency’s responses to comments and reviews.

Country Endorsement Endorsement by a national Operational Focal Point (OFP) is a requirement for the following:  all PIFs to enter the work program, and for application of Project Preparation Grants (PPGs);  PFDs submitted for work program inclusion;  Request for CEO approval of MSP final projects;  All EAs requesting CEO approval. Projects in biodiversity, climate change, and land degradation focal areas also follow STAR rules.

Recent Council Papers on Project Cycle Please consult the GEF website: for all relevant project cycle papers for more detailed policies and procedures. To name a few: GEF/C.31/7/Corr.1 GEF Project Cycle (Corrigendum) EnglishGEF Project Cycle (Corrigendum English GEF/C.38/05/Rev.1 Streamlining the Project Cycle andStreamlining the Project Cycle and Refining the Programmatic ApproachRefining the Programmatic Approach EnglishEnglish GEF/C.39/Inf.03 GEF Project and Programmatic Approach Cycles EnglishGEF Project and Programmatic Approach CyclesEnglish GEF/C.43/06 Streamlining of Project Cycle EnglishStreamlining of Project CycleEnglish GEF/C.47/07 Improving the GEF Project Cycle EnglishImproving the GEF Project CycleEnglish

System for Transparent Allocation of Resources: STAR GEF Expanded Constituency Workshop Managua, Nicaragua March 3-4, 2015

Outline  Background  The Workings of the STAR model  An Example Calculation  A Short Quiz!

Background  The current mechanism by which GEF resources are allocated to countries in three focal areas – Biodiversity, Climate Change, and Land Degradation  The Resource Allocation Framework (RAF) was the first PBA for the GEF and adopted for GEF-4  The STAR updated the RAF and was implemented for GEF-5  The STAR was recently updated for GEF-6

Objectives STAR aims to allocate scarce GEF resources within and among focal areas in order to:  maximise impact on the global environment  promote sound environmental policies and practices  meet convention requirements  match country driven priorities

Calculating STAR Allocations 1 Determine Available Focal Area Funds 2 Calculate “Country Scores” 3 Calculate Preliminary Country Allocations 4 Adjust for Floors and Ceilings 5 Obtain Final Allocations 6 Determine post-allocation Flexibilities

Available Focal Area Funds

Calculating STAR Allocations 1 Determine Available Focal Area Funds 2 Calculate “Country Scores” 3 Calculate Preliminary Country Allocations 4 Adjust for Floors and Ceilings 5 Obtain Final Allocations 6 Determine post-allocation Flexibilities

The Main Indices Global Benefits Index: measures a country’s relative share of GEF potential benefits that can be generated by a fixed amount of resource input into a focal area Country Performance Index: measures a country’s performance and capacity to deliver potential global environmental benefits GDP Index: designed to increase allocation of countries with a low GDP per capita

COUNTRY SCORE Global Benefits Index BiodiversityClimate Change Land Degradation Country Performance Index GDP Index The Country Score Country Score = GBI 0.8 CPI 1.0 GDP -0.08

Calculating STAR Allocations 1 Determine Available Focal Area Funds 2 Calculate “Country Scores” 3 Calculate Preliminary Country Allocations 4 Adjust for Floors and Ceilings 5 Obtain Final Allocations 6 Determine post-allocation Flexibilities

Preliminary Country Allocations  Country Share = Country Score / Sum of Country Scores for all eligible countries  Preliminary Allocation = Country Share * Available Focal Area Funds

Calculating STAR Allocations 1 Determine Available Focal Area Funds 2 Calculate “Country Scores” 3 Calculate Preliminary Country Allocations 4 Adjust for Floors and Ceilings 5 Obtain Final Allocations 6 Determine post-allocation Flexibilities

Floors and Ceilings Focal Area Floor for LDCs Floor for Non LDCs Ceiling % Ceilings (US Mn) Climate Change3210%126 Biodiversity21.510%129.6 Land Degradation %43.1

Calculating STAR Allocations 1 Determine Available Focal Area Funds 2 Calculate “Country Scores” 3 Calculate Preliminary Country Allocations 4 Adjust for Floors and Ceilings 5 Obtain Final Allocations 6 Determine post-allocation Flexibilities

Final Allocations  Adjustments for floors and ceilings mean there is a surplus or deficit relative to the preliminary allocation  This is then allocated among countries using the country scores  Process iterates until the full amount has been allocated among countries

Calculating STAR Allocations 1 Determine Available Focal Area Funds 2 Calculate “Country Scores” 3 Calculate Preliminary Country Allocations 4 Adjust for Floors and Ceilings 5 Obtain Final Allocations 6 Determine post-allocation Flexibilities

Flexibilities and Marginal Adjustments  Flexibilities relate to the utilization(not allocation) of GEF resources  Countries are allowed to adjust their focal area allocations (but not their total envelope) Total Allocation XAllowed Marginal Adjustment X ≤ 7 millionunlimited X > 7 million2 million

Approximate Calculation: Trinidad and Tobago BIODIVERSITYCLIMATE CHANGELAND DEGRADATION GBI CPI 3.65 GDPI COUNTRY SCORE (GBI 0.8 CPI 1.0 GDP ) SUM OF COUNTRY SCORES COUNTRY SHARE FOCAL AREA ALLOCATION PRELIMINARY COUNTRY ALLOCATION FINAL COUNTRY ALLOCATION TOTAL ALLOCATION = 6.22 MILLION (FULLY FLEXIBLE COUNTRY)

Question Country A has the following STAR allocations: Biodiversity = 3 million Climate Change = 4 million Land Degradation = 1 million (a)Does this country have full flexibility in the use of its resources? Why, or why not? (b) Is this country allowed any marginal adjustment across focal areas? If so, how much?

Question Country B is an LDC. During the STAR model simulations, Country B has preliminary allocations as follows: Comment on these values. (hint – floors!) BIODIVERSITY CLIMATE CHANGE LAND DEGRADATION PRELIMINARY ALLOCATIONS

Floors and Ceilings Focal Area Floor for LDCs Floor for Non LDCs Ceiling % Ceilings (US Mn) Climate Change3210%126 Biodiversity21.510%129.6 Land Degradation %43.1

Question During the STAR model simulations, Country C has preliminary allocations as follows: Comment on these values. (hint – ceilings!) BIODIVERSITY CLIMATE CHANGE LAND DEGRADATION PRELIMINARY ALLOCATIONS

Question Given the following values, calculate the Country Scores for Country D for each of the three focal areas. BIODIVERSITY CLIMATE CHANGE LAND DEGRADATION GBI CPI3.25 GDPI13000 COUNTRY SCORE???

. Thank you for your attention! Questions?