SCRF WebEx Meeting May 14, 2008 1.Report from PMs and APMs 2.Technical Design Phase R&D plan (rev. 3) 1.High Gradient R&D guideline 2.S1-global preparation.

Slides:



Advertisements
Similar presentations
Interface of Plug-Compatible Cryomodule Components KEK Norihito Ohuchi 2008/3/41GDE-Sendai Meeting.
Advertisements

SCRF Cavity R&D Goal and ILC Operational Gradient Akira Yamamoto: Prepared for discussions at Cavity Webex Meeting, July 20, , A. Yamamoto1SCRF.
SRF Cryomodule Assembly Facility Plans Tug Arkan AAC, May 10-12, 2005.
FNAL-SCRF 会議報告 1. Cryomodule, Plug-compatible Interface ( 大 内) 2. High Pressure Code, 5K Shield (Tom Peterson)
ILC PM Meeting S0 Webex Global Design Effort 1 S0/S1 Next Steps Lutz Lilje GDE.
WG3: Main Linac H. Hayano, C. Nantista, C. Pagani.
Overview of the ILC and SRF Program (With an emphasis on Px) Shekhar Mishra ILC & SRF Program Fermilab.
ILC S0 Strategy Proposal FNAL GDE status 報告会 4月28日: (空胴表面プロセス、空胴システム)
ILC08 Chicago Global Design Effort 1 Discussion of Optical Inspection and Temperature mapping Results Several new inspection and mapping systems.
Akira Yamamoto Project Manager, SCRF To be presented, April 19, 2009 AAP Review – SCRF Introduction AAP-SCRF-Introduction.
Jim Kerby, Fermilab for Rongli Geng and the S0 Cavity Team 23 May 2010 Current Status of SCRF Cavity Development SCRF Cavity Technology and Industrialization.
S1G Experiment Schedule Plan H. Hayano. Assembly work after cavity arrived Assumption: cavity with VT, with pickup antena, with Ar or N2 filled,
1 Global R&D Effort in the Technical Design Phase for the ILC I. Overview II. Superconducting RF Development Akira Yamamoto (KEK) for the ILC-GDE Project.
1 Eiji Kako (KEK) in cooperation with Japanese Industries IPAC-2010 Satellite Workshop, Kyoto, May 23, A Satellite Workshop at IPAC Superconducting.
1 Global R&D Effort of Superconducting RF Technology for the International Linear Collider Akira Yamamoto, Marc Ross, and Nick Walker ILC-GDE Project Managers.
Needs of a European SCRF Facility - the BIG plan Lutz Lilje DESY -MPY- DESY 11/2006 Planning Resource needs.
SCRF Monthly WebEx Meeting June 30, 2010 Agenda 1.Report from PMs (5 min.) 2.General Report from Group Leaders(15 min.) 3.Special Discussions 1.TDP R&D.
Summary of Main Linac SCRF-part H. Hayano, ILC08 at UIC.
STF plan overview H. Hayano, KEK LCPAC 02/25/2005.
Type IV Cryomodule Proposal (T4CM) Don Mitchell, 16 JAN 2006.
M. Ross, N. Walker, A. Yamamoto ILC Cost Review, (updated for TB) and Cost Drivers  Future R & D ILC Cost Review (M. Ross,
1 The Design & Value Costs SRF Technology The XFEL as a Prototype Japan as a Host International Linear Collider Status Mike Harrison.
Cavity Gradient for the R&D and ILC Operation Akira Yamamoto ILC-GDE SCRF Presented at the AD&I meeting held at DESY, Dec. 2-3, 2009 A, Yamamoto,
AAP Review on SCRF to be prepared Akira Yamamoto, Marc Ross, and Nick Walker ILC-GDE Project Managers To be presented at ILC-10, Beijing, March 26, 2010.
Parallel session summary ML/SCRF L. Lilje, H. Hayano, N. Ohuchi, S. Fukuda, C. Adolphsen (with help of Chris Nantista) TILC09,
ML Planning for ILC08 First Pass + SCRF agenda Chris Adolphsen Hitoshi Hayano.
ML Planning for ILC08 First Pass Chris Adolphsen Hitoshi Hayano.
Global Design Effort 1 S0 Status High-Gradient cavities Lutz Lilje DESY supplement by H. Hayano 04Sep2008 EC
Revised SPL-study work-plan W. Weingarten 3 May 20101SPL Cavity WG Meeting.
S1G Experiment Schedule Plan; H. Hayano ILC10 GDE meeting.
Update on S0, S1 for ILC R&D H. Padamsee, Cornell For the S0/S1 Task Force.
R.L. Geng, 5/27-31,2013 ECFA LC2013, DESY 1 Update on Raising Q0 at Ultra-High Gradient via Large-Grain Niobium Material Rongli Geng Jefferson Lab ECFA.
ALCPG/GDE Meeting FNAL Global Design Effort 1 Cavity Work Packages Lutz Lilje GDE.
Global design effort DOE meeting 8/10/06 Global design effort Americas 1 FY07 DOE ILC Budget recommendations G. Dugan ILC-GDE/Cornell University GDE Americas.
Requirements for Cryomodule What have to be inevitably realized?
SCRF Meeting Fermilab, April 21-25, 2008 Draft agenda updated, April-10 General Agenda: 4/21: Cavity: Gradient R&D, performance, diagnostics (S0), 4/22:
Summary ( Cryomodule, Plug-compatible Interface) Norihito Ohuchi.
Americas Cavity Specification C.M. Ginsburg (Fermilab) On behalf of the Fermilab cavity crew October 20, 2010.
TILC09 SCRF Session Global Design Effort 1 EU Status TILC09 SCRF Session Lutz Lilje DESY.
Beam Dynamics WG K. Kubo, N. Solyak, D. Schulte. Presentations –N. Solyak Coupler kick simulations update –N. Solyak CLIC BPM –A. Latina: Update on the.
ILC Global Design Effort 1 ILC S0 Strategy Proposal FNAL
E. KAKO (KEK) 2009' Oct. 26 ILC KEK Global Design Effort 1 Cavity Preparation for S1-Global Eiji Kako (KEK, Japan)
ILC Accelerator Operational Gradient Akira Yamamoto: SCRF Webex Meeting, July 28, , A. Yamamoto1SCRF Cavity Meeting.
HiGrade-Kickoff DESY Global Design Effort 1 ILC-HiGrade WP6 High-Gradient cavities Lutz Lilje DESY.
SCRF Cavity WebEx Meeting May 17, 2010 Reports from PM (10 min.) – Brief report from ILC-PAC – Industrialization workshop as IPAC satellite meeting, Kyoto,
2 nd Workshop of the IHEP 1.3 GHz SRF R&D Project and 2nd IHEP-KEK 1.3 GHz SRF Meeting Opening Remark J. Gao December 2-3, 2009, IHEP, Beijing, China.
Summary of SCRF Meeting Fermilab, April 21-25, 2008 April 25, 2008 General Summary and Further Plan: 4/21: Cavity: Gradient R&D, performance, diagnostics.
Detail plan of S1-Global H. Hayano (KEK),
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
S1-Global status report KEK Norihito Ohuchi 2008/11/171ILC08-GDE-Meeting-Chicago.
ILC Gradient R&D Rongli Geng Jefferson Lab ILC Main Linac WebEx Meeting July 28, 2010.
Visiting DESY for S1-G module Norihito Ohuchi 2009/8/251 19th Biweekly Webex meeting (S1-G, Cryomodule, Cryogenics)
Plans for Gradient R&D and Cavity Processing and Testing in the Americas Region in FY08-09 Mark Champion 21 April 2008.
ILC R&D Activities at KEK Superconducting Linac Development Beam-handling Technology Development.
PM Report CFS /Gbl ILC PAC (19-20 May) Agenda: –Akira, Rongli, Hitoshi H, Marc, Nick, Toshiaki, Mark P., Peter G. –Nick will report on Design.
SCRF: Monthly WebEx Meeting Oct., 19, 2011
SCRF WebEx Monthly Meeting Agenda and Reports from PM
S1G Experiment Schedule Plan
ILC10 Beijing Global Design Effort
WP5 Elliptical cavities
ILC-SCRF Test Facilities considerations
Meeting for S1-Global module design Cryomodule and Cryogenics
Evolving an ILC focused SCRF Facility from the XFEL Infrastructure
Input coupler assembly, high power and thermal performance in S1-Global at KEK E. KAKO (KEK) 2011' Dec. 07 TTC meeting in Beijing.
SCRF Monthly WebEx Meeting May 20, 2009
A. Yamamoto, S. Michizono, and B. List
Yamamoto WG3: ML-SCRF Parallel Session,
IHEP Cryomodule Status
ILC Cryogenics -- Technical Design Report Planning
Cavity Degradation Experience at S1-Global
Presentation transcript:

SCRF WebEx Meeting May 14, Report from PMs and APMs 2.Technical Design Phase R&D plan (rev. 3) 1.High Gradient R&D guideline 2.S1-global preparation 3.Work-package organization update 3.Report from Group Leaders, if any

Report from PMs and APMs SCRF meeting at Fermi Lab, April – Minutes prepared, and comments appreciated – Work-packages should function now Cost Management Group meeting at DESY, May 5-8 TD-Phase R&D plan rev. 2 – SCRF part updated (still need to be improved: S2, MLI) – SCRF appendix and work-package to be further updated – Submitted to FALC-RG Talks to be served at Conferences – EPAC-08 (June 22): “Coordinated Global R&D Effort for the ILC Linac Technology” – ASC-08 (Aug. 26): “Superconducting RF Cavity Development for the ILC”

Cavity: Work-packages Dec. 07 (ED-plan)TDP-R&D (proposed)Coordinator 1.1.1Gradient performanceGradient performance & specification LL, HH, MC 1.1.2Fabrication specification 1.1.3Process specification 1.1.4Specification 1.1.5Industrialization and cost ?LL, TS

Guideline: Standard Procedure and Feedback Loop Standard Fabrication/Process (Optional action) Acceptance Test/Inspection FabricationNb-sheet purchasingChemical component analysis Component (Shape) FabricationOptical inspect., Eddy current Cavity assembly with EBWOptical inspection (Tumbling)(Optical Inspection) ProcessEP-1 (Bulk: ~ 150um) Ultrasonic degreasing (detergent) or ethanol rinse High-pressure pure-water rinsingOptical inspection Hydrogen degassing at 600 C (?) Field flatness tuning EP-2 (~20um) Ultrasonic degreasing or ethanol(Flash/Fresh EP) (~5um)) High-pressure pure-water rinsing General assembly Baking at 120 deg. C Cold Test (vertical test) Performance Test with temperature mapping If cavity not meet specification Optical inspection

Lutz Lilje ILC Global Design Effort5 Apply Prescribed Processing Protocol within identified tolerances Cavity in Starting State Standard Cavity Test 35 MV/m, >8E9 ? Pass/Fail TDP1 Any 9-cell cavity at anytime determined to be “within the reference starting conditions” Specify both standard protocol & acceptable variations Cavity Fabrication Learning Feedback Samples & 1-cell R&D Cavity QC ILC “S0” Cavity Progress Map Proposal by C. Reece

Lutz Lilje ILC Global Design Effort6 ILC S0 Feedback Loop Cavity Incoming QC Countermeasure (Guided Repair) Huge Irregularities eg. Scratches Feedback: Improve Specification/QC Standard Cavity Preparation Cycle Identify Irregularities eg. pits Standard Vertical Test Cavity Horizontal Tests or Module Assembly Additonal Processing Cycle Understand nature of high gradient limitation e.g. does minor EP move quench location Single Cells Witness Samples > XX MV/m < XX MV/m Standard Vertical Test Cavity

Cavity Integration: Work-packages Dec. 07 (ED-plan)TDP-R&D (proposed)Coordinator 1.2.1Tuner HH 1.2.2Input coupler 1.2.3Magnetic shieldMag. Shield and He-vessel 1.2.4He-vessel 1.2.5Integration and test High Pressure Code issue HH 1.2.6IndustrializationIndustrialization & CostHH, TS

S1-Global Cryomodule Norihito Ohuchi 2008/5/9Telephone Meeting with Carlo8 Module-A Module-B Module-C

Cryomodule: Work-packages Dec. 07 (ED-plan)TDP-R&D (proposed)Coordinator 1.3.1StandardizationStandardization/Plug- compatibility 1.3.2Cooling pipe config.Cold-mass engineeringNO K shield 1.3.4Quadrupole assemblyQuadrupole installation 1.3.5Assembly processAssembly and Eng. w/CAD work 1.3.6Engineering w/ CAD 1.3.7Sys. Performance eval. System test and 1.3.8Transportation 1.3.9Industrialization/CostIndustrialization & CostNO, RS

Cryogenics: Work-packages Dec. 07 (ED-plan)TDP-R&D (proposed by TP)Coordinator 1.4.1Heat loads 1.4.2Cryo-plant designCryo-plant design and surface impact 1.4.3Reliability, repairTunnel cryogenic system and Integration 1.4.4Venting pressure limitVenting press. Limits & vessel/piping standard 1.4.5Surface impact 1.4.6Hazard 1.4.7Cryo-box design 1.4.8Liquid control 1.4.9Optimization of cryogenics K heat exchanger Standard (H.P. code) E+/e- cryogenicsE+/- sources cryogenics DR cryogenicsDamping ring cryogenics BDS cryogenics RTML cryogenics MLI vacuumMain Linac vacuum RTML vacuum CostTP, TS

HLRF: Work-packages Dec. 07 (ED-plan)TDP-R&D (proposed)Coordinator 1.5.1Modulator 1.5.2Klystron 1.5.3RF power distr. system 1.5.4HV charger system 1.5.5Interlock and control 1.5.6Industrialization and CostSF, TS

MLI: Work-packages Dec. 07 (ED-plan)TDP-R&D (proposed)Coordinator 1.6.1Quadrupole design 1.6.2Qudrupole prototype 1.6.3Latt. opt. & Emittance 1.6.4Initial alignment 1.6.5Energy errors 1.6.6Static tuning 1.6.7Dynamic tuning 1.6.8Topics 1.6.9CostCA, TS

Next Meetings Webex Meeting:Jun 11, July 9 – Functional parameters, Plug-compatible conditions to be settled. Post TTC: Can we manage it ? LCWS-08, GDE: We must have meeting