Transmission Reliability Performance Metrics November 5, 2009 © 2009 Blue Arc Energy Solutions, Inc. All Rights Reserved.

Slides:



Advertisements
Similar presentations
Definition of Firm Energy and Interruptible Transmission Two Issues Causing Problems for Business in the Western Interconnection.
Advertisements

BAL-002-WECC-1 Contingency Reserves
Intra Hour Tagging/Oasis During System Contingencies The transmission tagging process was initially developed to solve an after the fact accounting issue.
WECC Reliability Management System
Manuel Losada Friend 2º Foro TIC y Sostenibilidad Sevilla, 27 de Mayo de 2009.
March 26, 2014 Transmission Coordination and Planning Committee 2014 Q1 Stakeholder Meeting.
Planning, optimization and regulatory issues
© 2011 Siemens Energy, Inc. All rights reserved. Answers for energy. PSS ® ODMS a proven solution for CIM-based network modeling Anna Geevarghese T&D Service.
Transmission Transporting Electricity by Wire Darcy Neigum Montana-Dakota Utilities Co.
FERC Federal Energy Regulatory C ommission May 30, 2002 Inter-RTO charges and RTO Membership decisions.
Conventional and Pumped Hydro = STRATEGIC FLEXIBILITY Richard R. Miller, P.E. HDR, Inc. _______________________________________________________________________________________________________________________________________________________________________
SPP’s 2013 Energy Consumption and Capacity 2 12% annual capacity margin requirement CapacityConsumption Total Capacity 66 GW Total Peak Demand 49 GW.
John B. Wharton, PE Technical Executive Baltimore, Maryland October 16, 2013 Perspectives on Grid-Integrated Microgrids Maryland Clean Energy Summit.
Reporting the Economics of Reliable Energy Ralph Fehr, P.E. Engineering Consultant Reliability of the U.S. Power Grid.
Cyber Security 2005 ERCOT COMPLIANCE ROLLOUT Lane Robinson Reliability Analyst.
1 Value now. Value over time. © Copyright 2009, OSIsoft Inc. All rights Reserved. Using OSIsoft to Become Compliant James Cosgrove, Northeast Utilities.
Smart Grid Research Consortium Conference Austin, Texas Mark Ponder President ElectSolve Technology Solutions and Services, Inc.
Tutorial on Power Distribution Circuits G. Heydt Arizona State University March, 2003.
Reliability Criteria for Bulk Power System Design Richard V. Kowalski Manager, Transmission Planning ISO New England.
Terry Chandler Power Quality Inc, USA Power Quality Thailand LTD Sept /6/20091www.powerquality.org all rights reserve.
Embedding Social Values in the Design of Offshore Wind Energy Systems Presentation Competition and Regulation in Network Industries Brussels, 22 November.
THE TRES AMIGAS SUPERSTATION Southwest Renewable Energy Conference Santa Fe, NMSeptember 16 th 2010 UNITING THE NATION’S ELECTRIC POWER GRID.
The Transmission Imperative November 3, 2011 Jay Caspary.
Macomber Map Demonstration
THE TRES AMIGAS SUPERSTATION IIEA - Dublin October 8, 2010 UNITING THE NATION’S ELECTRIC POWER GRID.
Section 3 TRANSMISSION & DISTRIBUTION US Bulk Power Transmission System Transmission & Distribution (T&D) Components New T& D Technologies This product.
Applying the Distribution System in Grid Restoration/NERC CIP-014 Risk Assessment Srijib Mukherjee, Ph.D., P.E. UC Synergetic.
PJM © PJM Overview ARIPPA Valley Forge, PA November 8, 2007.
1 The Tres Amigas SuperStation VLPGO November 2011.
WECC Market Interface Committee Update WSPP Spring 2008 Meeting April 8, 2008 Robert D. Schwermann MIC Chair.
Common Information Model and EPRI Smart Grid Research
Module 5, Unit A Vocabulary Review Game. 2 pt 3 pt 4 pt 5pt 1 pt 2 pt 3 pt 4 pt 5 pt 1 pt 2pt 3 pt 4pt 5 pt 1pt 2pt 3 pt 4 pt 5 pt 1 pt 2 pt 3 pt 4pt.
1. 2 NERC Bulk Electric System (BES) Definition (NERC Glossary of Terms Used in Reliability Standards) FERC Order 693 FRCC Handbook Review Task Force.
Frankfurt (Germany), 6-9 June 2011 MARTENSEN – DE – Session 4 – 1221 The Cell Controller Pilot Project (CCPP): From Surviving System Black-Out to Market.
Using a Dispersed Strategy in Your Region By Mike Michaud Matrix Energy Solutions Edited and Presented By Brian Antonich Windustry.
FCC Field Hearing on Energy and the Environment Monday November 30, 2009 MIT Stratton Student Center, Twenty Chimneys Peter Brandien, Vice President System.
Bulk Power Transmission System
Overview of Southern Company Transmission
Generation assets important to the reliable operation of the Bulk Electric System What does this mean?
Curtis Crews, Reliability Services Texas Reliability Entity, Inc. Changes in Relay Misoperations Reporting.
Transmission Equivalence Richard V. Kowalski Manager, Transmission Planning ISO New England.
20th Century Electric Transmission Grid
Updated 1/28/2011.
COMPLIANCE ROLLOUT Vann Weldon Compliance Training Administrator March 23, 2005 NERC FUNCTIONAL MODEL REVIEW.
Dale Osborn Midwest ISO October 13, 2008 EE 590 Transmission Planning with Significant Energy Resources.
THE TRES AMIGAS SUPERSTATION ABB Western Utility Executive Conference September 28, 2010 UNITING THE NATION’S ELECTRIC POWER GRID.
Real Time Tools Outreach Carlos Martinez January 27-29, 2004 Washington, D.C. Transmission Reliability Research Review.
The Wind Coalition: Membership  Member Directory  AES Wind Generation | Acciona | Apex | Blattner Energy, Inc. | BP Alternative Energy North America.
Power Plant Construction and QA/QC Section 4.3 – Electrical Interconnections Engineering Technology Division.
Lance Cunningham, Ph.D., PE November Frisco, TX 2.
How the Transmission System Works Really William F. Reinke.
Congestion FTR’s ISO Charges Congestion FTR’s ISO Charges Performance Monitoring is Essential for Harmonizing Reliability and Markets Distributed Generation.
Lauren Azar Senior Advisor to the Secretary U. S. Department of Energy May 31, 2013 – WI Public Utilities Institute 1 Transmission Planning – A National.
Grid Reliability Metrics by Jim Dyer Electric Power Group, LLC January 29, 2004 Washington, DC Transmission Reliability Research Review.
RAWG Agenda Item LAR Data WECC Staff. Data Elements Generator information – Existing – Changes Monthly Peak Demand and Energy (actual year and.
Integrated Transmission and Resource Assessment Byron Woertz Manager, System Adequacy Planning W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
PJM©2014www.pjm.com A System Operator’s Resilience Wish List Tom Bowe Executive Director Reliability and Compliance PJM Interconnection
Frankfurt (Germany), 6-9 June 2011 Romanens – CH – S3 – 0220 Impact of Distributed Generation on Grid Protection BKW FMB Energie AG Switzerland Florian.
PJM©2013 Cyber Threats to the Electric Power Grid Steven McElwee October 16, Copyright © 2013 by PJM Interconnection, LLC.
1 The Tres Amigas SuperStation Low Carbon Summit October 22, 2011.
1 A Conversation about MISO Paul Spicer November 8, 2007.
Black-Start in a Market Howard F. Illian, President Energy Mark, Inc. July 23, 2002.
This module will dig deeper into Smart Grid implementation issues. It will focus on two key issue of particular interest to the PNW: 1)How the Smart Grid.
HYBRID MICRO-GRID.
Grid Integration of Intermittent Resources
ISO/IOU T&D Interface Update Thomas Bialek PhD, PE Chief Engineer
Lorenzo Kristov, Ph.D. Principal, Market & Infrastructure Policy
WECC Annual Meeting 9/11/2018 Cameron Warren
AltaLink / Daniel Wong / 2009 Nov 05 / 1 of 2
WECC Annual Meeting 9/11/2018 Cameron Warren
Presentation transcript:

Transmission Reliability Performance Metrics November 5, 2009 © 2009 Blue Arc Energy Solutions, Inc. All Rights Reserved

Transmission reliability metrics are more complex due to many factors Factors Response © 2009 Blue Arc Energy Solutions, Inc. All Rights Reserved

Grid configuration, flows, and robust structural design sets transmission apart Distribution Radial Flow Transmission Bi-Directional Flow © 2009 Blue Arc Energy Solutions, Inc. All Rights Reserved

Multiple functions of transmission vs. Load Serving distribution function Generation Interconnection Load Circuit Switching Substation Critical Path DistributionTransmission © 2009 Blue Arc Energy Solutions, Inc. All Rights Reserved

Transmission is subject to significant market interaction Factors Interactions Response © 2009 Blue Arc Energy Solutions, Inc. All Rights Reserved

The transmission industry is undergoing significant change Factors Response (Metric) New Modified © 2009 Blue Arc Energy Solutions, Inc. All Rights Reserved

The physical attributes of the transmission grid are changing © 2009 Blue Arc Energy Solutions, Inc. All Rights Reserved

The ownership and organization of utilities in the industry is changing © 2009 Blue Arc Energy Solutions, Inc. All Rights Reserved

How we envision transmission grid use and its functionality is changing © 2009 Blue Arc Energy Solutions, Inc. All Rights Reserved

Transmission reliability performance metrics development takes time © 2009 Blue Arc Energy Solutions, Inc. All Rights Reserved

History 101: Two blackouts prior to the formation of NERC © 2009 Blue Arc Energy Solutions, Inc. All Rights Reserved

2003 Blackout initiates change. FERC gains authority of grid reliability 2006 © 2009 Blue Arc Energy Solutions, Inc. All Rights Reserved

NERC RMWG working group formed in May © 2009 Blue Arc Energy Solutions, Inc. All Rights Reserved

Complexity & Change with Time Ticking Complexity Change Clock © 2009 Blue Arc Energy Solutions, Inc. All Rights Reserved

Blue Arc Energy Solutions, Inc. your advantage in performance intelligence © 2009 Blue Arc Energy Solutions, Inc. All Rights Reserved