C esr TA Future Plans David Rubin September 11, 2012.

Slides:



Advertisements
Similar presentations
Electron-cloud instability in the CLIC damping ring for positrons H. Bartosik, G. Iadarola, Y. Papaphilippou, G. Rumolo TWIICE workshop, TWIICE.
Advertisements

CESR as Light Source David L. Rubin for the CESR Operations Group Cornell University Laboratory for Elementary-Particle Physics.
CornellVideo Talk. Dec page 1 John Byrd Experimental studies of the fast- beam ion instability in the ALS- The Sequel John Byrd Lawrence Berkeley.
Damping ring K. Ohmi LC Layout Single tunnel Circumference 6.7 km Energy 5 GeV 2 km 35 km.
SuperB and the ILC Damping Rings Andy Wolski University of Liverpool/Cockcroft Institute 27 April, 2006.
CESR-c Status CESR Layout - Pretzel, Wigglers, solenoid compensation Performance to date Design parameters Our understanding of shortfall Plans for remediation.
Global design effort 2008 DOE/NSF review June 30, 2008 Global design effort Americas Slide 1 CesrTA Status and Planning for FY08-09 David Rubin Mark Palmer.
Overview of ILC Plans D.Rubin April 17, D. Rubin2 ILC R&D Activities and Plans 1.Positron Source 2.Damping Ring 3.Low Emittance Transport - damping.
Experimental Plan for Achieving Low Emittance in CesrTA David Rubin Cornell Laboratory for Accelerator-Based Sciences and Education.
Low Emittance Program David Rubin Cornell Laboratory for Accelerator-Based Sciences and Education CesrTA.
July 22, 2005Modeling1 Modeling CESR-c D. Rubin. July 22, 2005Modeling2 Simulation Comparison of simulation results with measurements Simulated Dependence.
LEPP, the Cornell University Laboratory for Elementary-Particle Physics, has joined with CHESS to become the Cornell Laboratory for Accelerator-based Sciences.
Searching for Quantum LOVE at the Australian Synchrotron Light Source Eugene Tan On behalf of Rohan Dowd 120/10/2010Eugene Tan – IWLC 2010, Genega ASLS.
Ultra-Low Emittance Storage Ring David L. Rubin December 22, 2011.
25-26 June, 2009 CesrTA Workshop CTA09 Electron Cloud Single-Bunch Instability Modeling using CMAD M. Pivi CesrTA CTA09 Workshop June 2009.
August 9, 2007M. Palmer1 CESR Machine Studies Planning Overview Principal Projects Other Milestones and Dates Machine Studies Schedule Proposed Plan.
Witness Bunch Experimental Studies at CESR-TA Robert Holtzapple Alfred University/Cal Poly San Luis Obispo.
Fast Ion Instability Studies in ILC Damping Ring Guoxing Xia DESY ILCDR07 meeting, Frascati, Mar. 5~7, 2007.
Beam dynamics on damping rings and beam-beam interaction Dec 포항 가속기 연구소 김 은 산.
Project Management Mark Palmer Cornell Laboratory for Accelerator-Based Sciences and Education.
CesrTA Experimental Plan M. Palmer for the CesrTA Collaboration November 17, 2008.
CesrTA Status Report & R&D Planning Mark Palmer Cornell University April 21, 2010.
November 14, 2004First ILC Workshop1 CESR-c Wiggler Dynamics D.Rubin -Objectives -Specifications -Modeling and simulation -Machine measurements/ analysis.
1 Proposal for a CESR Damping Ring Test Facility M. Palmer & D.Rubin November 8, 2005.
July 16-17, 2007 Joint NSF/DOE Review of CesrTA Proposal 1 * Mitigation techniques planning still underway with ILC DR group Answer to Questions 1 and.
Multibunch beam stability in damping ring (Proposal of multibunch operation week in October) K. Kubo.
28-May-2008Non-linear Beam Dynamics WS1 On Injection Beam Loss at the SPring-8 Storage Ring Masaru TAKAO & J. Schimizu, K. Soutome, and H. Tanaka JASRI.
E-cloud studies at LNF T. Demma INFN-LNF. Plan of talk Introduction New feedback system to suppress horizontal coupled-bunch instability. Preliminary.
Beam stability in damping ring - for stable extracted beam for ATF K. Kubo.
02/04/2009 AS-TAGL Mtg Global Design Effort 1 CesrTA Update Mark Palmer CLASSE.
Motivation and Overview David Rubin Cornell Laboratory for Accelerator-Based Sciences and Education.
C ESR TA Status Report July 22, 2010 Mark Palmer for the C ESR TA Collaboration.
Cesr-TA Simulations: Overview and Status G. Dugan, Cornell University LCWS-08.
Electron cloud measurements and simulations at CesrTA G. Dugan, Cornell University 4/19/09 TILC09 4/18/09.
LCWA09 – October 1 st S. De Santis Measurements of the Electron Cloud Density by TE wave propagation in Cesr-TA M. Billing, J. Calvey, B. Carlson, S. De.
Highlights from the ILCDR08 Workshop (Cornell, 8-11 July 2008) report by S. Calatroni and G. Rumolo, in CLIC Meeting Goals of the workshop:
November 18, 2011David L. Rubin1 CESR Test Accelerator – Investigation of the physics of charged particle beams Circumference = 768m - Beam energy
CesrTA Status Report Mark Palmer Cornell University September 2, 2009.
February 5, 2005D. Rubin - Cornell1 CESR-c Status -Operations/Luminosity -Machine studies -Simulation and modeling -4.1GeV.
Electron cloud beam dynamics G. Dugan, Cornell University CesrTA Advisory Committee 9/11/12.
Summary David Rubin Cornell Laboratory for Accelerator-Based Sciences and Education.
CESR Test Accelerator Optics Correction and Tuning Tools David Sagan Cornell University.
Electron cloud study for ILC damping ring at KEKB and CESR K. Ohmi (KEK) ILC damping ring workshop KEK, Dec , 2007.
Global Design Effort ILC Damping Rings: R&D Plan and Organisation in the Technical Design Phase Andy Wolski University of Liverpool and the Cockcroft Institute,
Pushing the space charge limit in the CERN LHC injectors H. Bartosik for the CERN space charge team with contributions from S. Gilardoni, A. Huschauer,
Characterization of the Fast Ion Instability at CesrTA David Rubin Cornell University.
Low-Emittance Tuning at CesrTA Jim Shanks Cornell Laboratory for Accelerator-Based Sciences and Education.
Beam Instrumentation of CEPC Yue Junhui (岳军会) for the BI Group Accelerator Center, IHEP HF2014.
Two-Stream Phenomena in CLIC G. Rumolo and D. Schulte for the ACE, 3 September 2008 * thanks to W. Bruns, R. Tomás, SPSU Working Team General introduction.
Two-beam instabilities in low emittance rings Lotta Mether, G.Rumolo, G.Iadarola, H.Bartosik Low Emittance Rings Workshop INFN-LNF, Frascati September.
Two beam instabilities in low emittance rings Lotta Mether, G.Rumolo, G.Iadarola, H.Bartosik Low Emittance Rings Workshop INFN-LNF, Frascati September.
Electron Cloud Experimental Plans at Cesr-TA ILCDR08 - July 10, 2009 G. Dugan Cornell Laboratory for Accelerator-Based Sciences and Education.
Electron Cloud R&D at Cornell ILCDR08--7/8/08
Test of Optical Stochastic Cooling in CESR
CesrTA Status and Planning
Coupling Correction at the Australian Synchrotron
RECENT DEVELOPMENTS IN MODELING
Recent Electron Cloud Studies at CESR and Future Plans
Low Emittance Tuning in CESR TA
M. Tigner, R. Helms, M. Palmer, D. Rubin, D. Sagan Cornell University
The Proposed Conversion of CESR to an ILC Damping Ring Test Facility
Low Emittance Tuning David Rubin Cornell Laboratory for
CesrTA Experimental Schedule and Priorities
Electron cloud studies at CESR
CLIC damping rings working plan towards the CDR
CTA 09 - Introduction David Rubin Cornell Laboratory for
Proposal for a CESR Damping Ring Test Facility
Recent Advances in Electron Cloud Buildup Measurements and Models at CESR (Part 2) Stephen Poprocki & Jim Crittenden Cornell University Accelerator Physics.
Yuri Nosochkov Yunhai Cai, Fanglei Lin, Vasiliy Morozov
Crab Crossing Named #1 common technical risk (p. 6 of the report)
Presentation transcript:

C esr TA Future Plans David Rubin September 11, 2012

CESR converted for low emittance operation Developed and implemented a dozen lattice configurations for multiple energies, emittances, with varying numbers of wigglers, etc. Instrumented storage ring to study electron cloud growth and mitigation Anchored electron cloud models with extensive and complementary measurements Recommended complete set of mitigations for ILC damping ring Used models to evaluate tolerance of ILC positron ring to electron cloud Summary- Electron Cloud R&D 2September 11, 2012CesrTA Program Review

Instrumented CESR for simultaneous measurement of bunch height, width and length Developed techniques for routine lattice correction and emittance tuning Exploited instrumentation and flexibility to make most extensive measurements to date of Intra- beam scattering in an electron/positron ring Summary – Low emittance 3September 11, 2012CesrTA Program Review

Completeness of electron cloud model Cloud induced emittance growth and instabilities Long lived cloud in quadrupoles/wigglers (precursor studies) TE wave measurement technique Minimum vertical emittance –Sources of emittance dilution –Emittance tuning techniques X-ray beam size measurement – optimization/interpretation of coded aperture images Visible light beam size measurement –horizontal and vertical – turn by turn Optical and Xray diffraction radiation beam size monitor Intra-beam scattering Fast Ion instability Outstanding questions and investigations 4September 11, 2012Program Review

Is there a self consistent set of model parameters ? –Fit of model to measured tune shifts in a long train constrains model parameters –Simultaneous fits to multiple data sets with varying beam current, bunch configuration, beam energy, beam species further constrains parameters and tests the completeness of the model –Similarly, RFA and SPU measurements can be fit to ecloud models with different sensitivities to the various parameters –Time resolving RFA’s (very recently installed) will give complementary data that can likewise be fit to the model Our goal is simultaneous fit of all data sets (RFA,SPU, tune shifts) to best constrain parameters and establish that the model does (or does not) include all of the relevant physics consistent with SEY data Electron cloud model 5September 11, 2012CesrTA Program Review

Photon Reflectivity Development of cloud depends on nature of scattering of synchrotron radiation photons Angular distribution of scattering depends on details of the surface of scatter on the scale of photon wavelength That dependence is parameterized in the model Reflectivity collaboration aims to measure dependence on - Surface material and roughness - Photon energy - Angle of incidence Electron cloud model 6September 11, 2012CesrTA Program Review

Instabilities and emittance blow up –We observe cloud induced head tail instability and emittance dilution –Connection between the two is not entirely clear. Does head-tail instability contribute to emittance growth or are the phenomena unrelated ? –Simulations (CMAD, PHETS) and analytic calculations are in rough agreement with measurement of both growth and instability – although not in detail –We aim to better understand the cause of sub-threshold emittance growth, connection to instability, nature of instability We would like to measure internal bunch motion Electron cloud - dynamics 7September 11, 2012CesrTA Program Review

Instrumentation for investigation of instability xBSM bunch slicing –Measure vertical position and size versus longitudinal position along bunch –Fast diode array – 35 ps rise time –4 size/position samples along the ~ 10 mm (30 ps) long bunch at 10 ps intervals Component testing beginning this fall Electron cloud - dynamics 8September 11, 2012CesrTA Program Review

Bunch slicing with xBSM September 11, 2012CesrTA Program Review9 High speed Diode array Multi channel data acquisition system with individual phase delay

Electron cloud dynamics September 11, 2012CesrTA Program Review10 Simulation of bunch/cloud interaction –Simulations (PHETS, CMAD) computationally intensive –Calculations of thresholds for instabilities and emittance growth Typically based on hundreds of turns (fraction of a damping time) Limited to cloud within 20 σ of beam –We need more efficient algorithms, and implementations to get at all of the physics

Observation of Blowup of lead bunch –Effect is mitigated with the help of a precursor bunch –Depends on bunch spacing, number of bunches, total current,... Hypothesis Long lived cloud that accumulates along beam line in quadrupoles and/or wigglers, and is blown away by the precursor bunch Evidence The relatively high current measured in the quadrupole RFA suggests buildup over multiple turns 3-D modeling of cloud in wigglers indicates that electrons are trapped in strong longitudinal field component Long lived electron cloud 11September 11, 2012CesrTA Program Review

We plan to test that hypothesis with –Simulation: Simulation of multi-turn effects is computationally intensive 3 D model may be required if longitudinal magnetic fields in wigglers, or in fringing fields of quadrupoles are important –Instrumentation: Time Resolving RFA in quadrupole –Measurements: Investigate dependence on various machine parameters, bunch configurations, species, etc. How do other features (tune shifts, internal bunch motion) respond to precursor A long lived cloud that is trapped in quadrupoles could have a significant impact on positron rings. Long lived electron cloud 12September 11, 2012CesrTA Program Review

Noninvasive –No special in vacuum hardware (Couple to TE wave via BPM buttons) –Possibility of measurement of transverse distribution of cloud density Requires: –Better understand relation of side band amplitude to cloud density –Details of spectrum of trapped modes TE wave measurement technique 13September 11, 2012CesrTA Program Review

We have achieved pm-rad Theoretical zero current limit (quantum limit) is nearly 100 times smaller Measured residual vertical dispersion and coupling can not account for observed vertical emittance. Evidently there are other sources of emittance dilution –Magnet motion, detector motion, unstable corrector magnet currents, noise coupled to the beam through RF system,... –We observe significant motion at high frequencies. (Betatron tunes are self excited) –Perhaps there is an electron cloud or ion effect that is relevant even at very low bunch current Our goal is to continue to identify and mitigate sources of emittance dilution and to approach the quantum limit Emittance 14September 11, 2012CesrTA Program Review

Emittance dilution due to beam motion September 11, 2012CesrTA Program Review15 Turn by turn xBSM data ~30 micron variation in centroid position ~ 3 micron variation in beam size FFT identifies vertical betatron motion We need to identify (and eliminate) source of excitation

Emittance dilution due to beam motion September 11, 2012CesrTA Program Review16 IBS run High current Low current

Real time emittance tuning –Measurement of lattice errors via resonant excitation affords the possibility to continuously monitor betatron phase/coupling and vertical dispersion (as well as orbit) –Drive a witness bunch using gated tune tracker at 3 normal mode frequencies –Turn by turn position at each BPM => Orbit, phase, coupling, dispersion Emittance September 11, 2012CesrTA Program Review17

Optimize coded aperture for –X-ray energy spectrum –Bunch size –Intensity Match x-ray energy to diode and optimize layout of diode array Refine fitting techniques for extracting size from coded aperture data All vacuum x-ray beam lines for full sensitivity across the spectrum X-ray beam size monitor September 11, 2012CesrTA Program Review18

Developing turn by turn capability based on linear array of photomultiplier tubes Exploring measurement of vertical beam size –Interferometry –Polarization As complement and check of xray beam size monitor Visible light beam size monitor September 11, 2012CesrTA Program Review19

Goal –Measure vertical beam size with 1μm resolution Phase I – optical diffraction radiation (Dec. 2012) - 400μm and 1 mm diffraction slit width => image odr pattern from ~ 20 μm beam Phase II – x-ray diffraction radiation (Dec. 2013) - 10 μm slit width => image xdr pattern from ~ 1 μm beam Depends on installation of mini-β insert to achieve 1 μm beam in CESR ODR/XDR 20September 11, 2012CesrTA Program Review

As we continue to achieve smaller vertical emittance, our sensitivity to collective effects (especially emittance diluting effects) is enhanced. Collective effects 21September 11, 2012CesrTA Program Review

–Continue to explore IBS and test theory with ever smaller zero current emittance –IBS has strong energy dependence. Measurements at 1.8 and 2.3GeV planned for December 2012, will bracket the 2.1GeV data Preliminary tests at 1.8/2.3 to explore dependence of xBSM on xray spectrum have been completed –Anomalous blowup of vertical beam size at high current ? –Dependence on dispersion in RF ? New capability in next run => Synchronized single pass measurement of horizontal and vertical beam size Intra-beam scattering 22September 11, 2012CesrTA Program Review

Fast-ion instability –CesrTA well instrumented for study of fast-ion effect –Sensitivity expected to increase as vertical emittance shrinks –xBSM and beam position monitors provides bunch by bunch and turn by turn measure of vertical emittance and position spectra (similarly to investigation of ecloud emittance growth) We plan direct measure of fast ion instability, and the threshold for emittance growth. Fast Ion 23September 11, 2012CesrTA Program Review

Graduate students J. Calvey, N. Eggert, M. Ehrlichman, R. Helms, W. Hopkins, B. Kreis, J. Shanks, J. Urban, Y. Yariv Undergraduates K. Butler, H. Kaminsky, J. Kim, Z. Leong, H. Liu, J. Livezey, J. Makita, M. McDonald, G. Ramirez, S. Santos, R. Schwartz, S. Vishniakou, W. Whitney, H. Williams, L. Fabrizzio, M. Randazzo, R.Campbell, S. Roy, J. Ginsberg REU (Research Experience for Undergraduates) D. Carmody, C. Cude, P. Kehayias, M. Lawson, B. Carlson, D. Gonnella, E. Wilkinson, L. Hales, K. Hammond, N. Omcikus, Z. Warecki, J. Bonilla, D. Duggins, E. Hemingway, K. Williams CesrTA Students September 11, 2012CesrTA Program Review24

Phase I (2008−2011) –80% NSF(CESR Conversion), 20% DOE (ILC-ART) –Total of 240 days dedicated CESR running time Phase II (2011 – 2014) –NSF (Lepton Collider) –40 days dedicated CESR running time/year Phase III (2014 − ?) Proposal due 9/13 –Request Beam physics and instrumentation for low emittance electron/positron rings 40 days/year machine time Details depend on CHESS upgrade plans Funding 25September 11, 2012CesrTA Program Review

CesrTA is a well instrumented laboratory for investigation of beam physics of low emittance rings –Flexible optics – mature interface of design/optimization/measurement/analysis tools (BMAD/CESRV/Tao) –State of the art instrumentation, and ongoing development –Sophisticated modeling and simulation capability based on integrated library of accelerator modeling code (BMAD ) Contributions –Electron cloud physics, emittance tuning, intra-beam scattering, materials characterization, beam instrumentation Collaborative effort (14 institutions) Accelerator physics education Compelling program of beam physics, experiment and theory Conclusion September 11, 2012CesrTA Program Review26

Thank you for your attention End September 11, 2012CesrTA Program Review27