Presentation to the 26 th CEOS Plenary at Bengaluru, India 24-27 October, 2012 Annual Report on CEOS Implementation of the GEOSS Space Segment Michael.

Slides:



Advertisements
Similar presentations
Makoto Kajii SIT Chair 2010 – th Annual Report on CEOS Implementation of the GEOSS Space Segment Agenda Item accomplishments and lessons.
Advertisements

The CEOS Constellations Status and Way Forward SIT September 2006.
Makoto Kajii SIT Chair 2010 – th Annual Report on CEOS Implementation of the GEOSS Space Segment - Virtual Constellations: 2011 Progress & requests.
CEOS Plenary Meeting Lucca, Italy November 8-9, 2011 CEOS Systems Engineering Office (SEO) Annual Report Brian Killough NASA Agenda Item #18.
WGClimate Work Plan for John Bates, Chair WGClimate 4th Working Group on Climate Meeting.
Committee on Earth Observation Satellites John Bates Chair, Joint CEOS-CGMS Working Group on Climate 3 rd WCRP Data Advisory Committee.
© GEO Secretariat GEO WP & 2013 GEO priorities for CEOS Support GEO Secretariat CEOS SIT-28 NASA - Langley March 2013.
CEOS SIT-28 Introduction of the Agenda, Overall Objectives, and Essential Business Topics Hampton, Virginia, USA March 12-14, 2013.
Progress on CEOS Implementation of GEOSS Space Segment Including Highlights of Contributions to GEO Work Plan Pascale Ultré-Guérard, Brian Killough CNESNASA.
Presentation to the 26 th CEOS Plenary at Bengaluru, India October, 2012 Accomplishments and Challenges 2012 ….. report from the chair Kiran Kumar.
GEO ADC Co-Chair meeting USGS, Reston, Dec Slide # 1 Virtual Constellations (DA-07-03) I.Petiteville, CEOS GEO ADC Co-Chairs Meeting, USGS,
Coordination Group for Meteorological Satellites - CGMS Climate Monitoring Architecture: Status and way forward Presented to CGMS-41 plenary session.
Slide: 1 27 th CEOS Plenary |Montréal | November 2013 Agenda item: 29 Adrian Simmons, Chair of the GCOS Steering Committee Update from the Global.
Presentation to the 26 th CEOS Plenary at Bengaluru, India October, 2012 CEOS Response to the Updated GCOS IP & Satellite Supplement Mitch Goldberg.
AS Kiran Kumar ISRO, INDIA 12 th CEOS PLENARY Nov 10-12, 1998.
28 th CEOS Plenary Session Position Paper and Recommended Way Forward for the LSI-VC Thomas Cecere, USGS Jonathon Ross, GA CEOS Plenary, Agenda Item 19.
WGClimate John Bates NOAA SIT Workshop Agenda Item #8 WGClimate Work Plan progress & Issues CEOS SIT Technical Workshop CNES, Montpellier, France 17 th.
Earth Observations to Benefit Societies A Briefing on the Activities of the Committee on Earth Observation Satellites (CEOS) Timothy Stryker U.S. Geological.
Anticipated Outcomes from CEOS WGs in 2010 Strategic Discussion on what the WGs should seek to achieve 1 23 rd CEOS Plenary I Phuket, Thailand I 3-5 November.
Slide: 1 Osamu Ochiai Water SBA Coordinator The GEO Water Strategy Report – The CEOS Contribution Presentation to the 26 th CEOS Plenary at Bengaluru,
Slide: 1 CEOS SDCG-3 Meeting|Sydney, Australia| 7-9 February 2013 Space Data Coordination Group Land Surface Imaging Virtual Constellation Ake Rosenqvist,
GEO Work Plan Symposium 2012 ID-03: Science and Technology in GEOSS ID-03-C1: Engaging the Science and Technology (S&T) Community in GEOSS Implementation.
CEOS Participation in GEO Work Plan Management Structure Agenda 5 Kerry Ann Sawyer CEOS Executive Officer CEOS SIT-28 Meeting Hampton, Virginia, USA 12.
CEO Team SEO SIT Technical Workshop 25 – Agenda #16 EUMETSAT 17 th to 18 th September 2015 Committee on Earth Observation Satellites CEOS in the future.
Overview of CEOS Virtual Constellations Andrew Mitchell NASA CEOS SIT Team / WGISS NASA ESRIN – Frascati, Italy September 20, 2013 GEOSS Vision and Architecture.
Overview of CEOS Actions in Support of GEO Work Plan Ivan Petiteville CEO ESA 1 23 rd CEOS Plenary I Phuket, Thailand I 3-5 November2009.
CEOS Strategic Implementation Team (SIT) Report 2009 Accomplishments and Lessons Learned Agenda Item 9 Mary Kicza SIT Chair NOAA 1 The 23 rd.
CEOS Priorities for 2013 Agenda 3 Kerry Ann Sawyer CEOS Executive Officer CEOS SIT-28 Meeting Hampton, Virginia, USA 12 March 2013.
GEO ADC meeting, Washington DC, USA, Sep Slide # 1 DA DA Virtual Constellations Ivan Petiteville, CEOS GEO ADC Meeting, Washington DC,
WGISS and GEO Activities Kathy Fontaine NASA March 13, 2007 eGY Boulder, CO.
CEOS accomplishments in 2011 and future challenges Enrico Saggese ASI 25th CEOS Plenary Lucca 8-9 November 2011.
WGISS Response to CEOS Actions Assigned to WGISS Richard Moreno CNES – WGISS chair WGISS-40 Harwell – United Kingdom 28 th September 2015 Committee on.
|‌ 1 Task Coordinator: Brian Killough (CEOS) GEO Task IN-01 Status Report January 2014.
2010/11 SIT Chair Vision and Goals Makoto Kajii Japan Aerospace Exploration Agency 1 The 23 rd CEOS Plenary I Phuket, Thailand I 3-5 November 2009.
Committee on Earth Observation Satellites CEO Team Plenary Agenda Item #13b 29 th CEOS Plenary Kyoto International Conference Center Kyoto, Japan 5 – 6.
Land Surface Imaging VC: Terms of Reference Julio Dalge, P.G. Diwakar, John Faundeen INPE ISRO USGS CEOS SIT-28 Meeting Hampton, Virginia, USA March 12,
Overview: CEOS Capacity Building Activities CEOS Systems Engineering Office (SEO) WGCapD-5 Agenda Item 24 Working Group on Capacity Building & Data Democracy.
CGMS-42 CEOS-CGMS WP-01 V1, 11 May 2014 Coordination Group for Meteorological Satellites - CGMS Status report by the CEOS-CGMS Joint Working Group on Climate.
Meeting Strategy South African National Space Agency WGCapD-5 Agenda Item 3 Working Group on Capacity Building & Data Democracy Hampton, Virginia, USA.
Information on a potential CEOS Sea Surface Temperature Virtual Constellation (SST-VC) Craig Donlon (ESA) Kenneth S. Casey (NOAA) CEOS Plenary, Rio De.
SIT-27 Meeting La Jolla, CA, USA March 26-28, CEOS Priorities for 2012 Timothy Stryker CEOS Executive Officer.
The International Ocean Colour Coordinating Group International Network for Sensor Inter- comparison and Uncertainty assessment for Ocean Color Radiometry.
Committee on Earth Observation Satellites John Bates, NOAA Plenary Agenda Item 8 29 th CEOS Plenary Kyoto International Conference Center Kyoto, Japan.
Report on SBSTA-43 John Bates NOAA, National Centers for Environmental Information (NCEI) NOAA/NESDIS 6th Working Group on Climate Meeting.
Incoming Themes for 2017 Frank Kelly, USGS
Committee on Earth Observation Satellites
Committee on Earth Observation Satellites
GEO WP 1. INFRASTRUCTURE (Architecture and Data Management)
Broader Coordination on Carbon Observations
WGISS Working Group for Information Systems & Services
CEOS Status/Overview Steven Hosford WGCapD-7 Agenda Item #6
Committee on Earth Observation Satellites
WGCV Work Plan Actions K. . Thome NASA WGCV Plenary # 43
WGCV Chair’s Report K. Thome NASA WGCV Plenary # 44
CEOS and GEO Workplan Review
CEOS Status/Overview Steven Hosford LSI-VC-5 Agenda Item #1.4
CEOS/CGMS Working Group Climate
Precipitation Virtual Constellation (P-VC)
Proposed 2019 CEOS chair initiative
WMO Space Programme Office Geneva, Switzerland, 29 March 2018
Review of Chair Priorities
LSI-VC Work Plan Updates
SIT Chair Priorities and SIT-33 Objectives
WGCapD Perspectives of Work Plan –
SIT-31 Sessions CEOS SIT Chair Team ESA/ESRIN, Frascati, Italy
SIT Chair Priorities and SIT-34 Objectives
CEOS Organizational Matters
VC Title Goes Here Name (s), Organization, CEOS Affiliation
CEOS Working Group on Climate (WGClimate)
Precipitation Virtual Constellation
Presentation transcript:

Presentation to the 26 th CEOS Plenary at Bengaluru, India October, 2012 Annual Report on CEOS Implementation of the GEOSS Space Segment Michael Freilich, NASA, SIT Chair Agenda Item #12

The 26 th CEOS Plenary – Bengaluru, India October, 2012 Agenda  Part 1: 2012 CEOS Accomplishments and Lessons Learned  Review of the CEOS Annual Work Plan... What did we set out to accomplish in 2012?  CEOS-GEO Actions... What actions did we establish to accomplish these goals?  CEOS is generally making excellent progress on CEOS-GEO Actions that are tightly coupled to the CEOS Work Plan’s goals and objectives  CEOS progress is uneven and/or in many cases unclear on lower visibility CEOS-GEO Actions that may not be as tightly coupled to the CEOS Work Plan  Part 2: CEOS involvement in the GEO Work Plan Tasks and Components  CEOS Leadership roles  IN-01-C2 Task Objectives and Accomplishments  Part 3: Virtual Constellations Progress on Key CEOS Priorities

The 26 th CEOS Plenary – Bengaluru, India October, 2012 Part 1: CEOS Work Plan and Actions  Improved Coordination of Space Agency Activities Related to Climate  CEOS Response to the GCOS Implementation Plan (IP). Agenda Item 25, CEOS Action (CL)  Development of Fundamental Climate Data Records (FCDRs) and release of the ECV Inventory survey. Agenda Item 26, CEOS Action (CL)  Continued cooperation with GEO, GCOS, WMO, and CGMS in the development of a space-based system to support climate. Agenda Item 26 (Climate Architecture and ECV Inventory)  Further alignment of the Virtual Constellations objectives as building blocks of the space-based climate information strategy. Part-3 of this presentation. CEOS-GEO Actions related to Climate  There are 7 actions related to Climate  Other actions not noted above are: Climate Data Record Reanalyses, Climate Model Intercomparison Projects, and Greenhouse Gas Cal-Val.  All of these actions directly address the Work Plan objectives above.

The 26 th CEOS Plenary – Bengaluru, India October, 2012 CEOS Work Plan and Actions –Page 2  Progress Towards Established CEOS-GEO Priorities  CEOS leadership within and support to the GEO Forest Carbon Tracking (FCT) and the Global Forest Observations Initiative (GFOI), including the establishment of the Space Data Coordination Group (SDCG). Agenda Items 15 and 16. CEOS Action (CL)  Continued development of the CEOS Strategy for Carbon Observations from Space by the Carbon Task Force (CTF). Agenda Item 14, CEOS Action (CL)  Advancement of CEOS Data Democracy activities within the reorganized CEOS Working Group on Capacity Building and Data Democracy (WGCBDD). 3 CEOS Actions (ID-02)  Further alignment of the CEOS Virtual Constellation objectives to the GEO Work Plan Tasks. Part-3 of this presentation.  Continued support of the GEOSS Common Infrastructure (GCI) and an increase in GEO Data Collection of Open Resources for Everyone (GEO DataCORE) datasets. WGISS Report, Agenda Item 29 and SEO Report, Agenda Item CEOS Actions (ID-01)  Integrated approach to disaster management, including support to the Geohazards Supersites initiative. Agenda Items 17 and 18, 8 CEOS Actions (DI) including: Gap Analyses, Web Service Framework, Volcanic Ash, Supersites, Caribbean Pilot, African Flood and Health Pilot.  Continued support to the Joint Experiments on Crop Assessment and Monitoring (JECAM) initiative. CEOS Action (AG)  Continued CEOS leadership of, and support to, the Quality Assurance for Earth Observations (QA4EO) initiative. 2 CEOS Actions (IN-02)

The 26 th CEOS Plenary – Bengaluru, India October, 2012 CEOS Work Plan and Actions – Page 3  Considering CEOS Support to Further Key GEO Priority Initiatives  Exploratory dialogue on support to the GEO Global Agricultural Monitoring (GEOGLAM) initiative. Agenda Item 20  Continued dialogue on potential CEOS contributions to integrated water cycle products and services. 2 CEOS Actions (AG), 1 CEOS Action (HE), 5 CEOS Actions (WA)  Continued dialogue on potential CEOS contributions to the GEO Biodiversity Observation Network (GEO BON). CEOS Action (BI)  Continued and Enhanced CEOS Outreach to Key Stakeholders: GEO, COP, UNFCCC, SBSTA, G8/G20, and Others  Engagement, attendance, and where appropriate, participation and presentations at key meetings. Agenda Items 32 and 34.  Maintenance of the Missions, Instruments and Measurements (MIM) database. Agenda Item 33, Continuing well... thanks to ESA.  Publication of the CEOS Newsletter. Continuing well... thanks to JAXA  CEOS presence at the Rio+20 Summit, including the delivery of the CEOS Earth Observation Handbook. Rio+20 supported. Handbook not delivered due to Customs. CEOS Action ID-04.  Further review and, as appropriate, adoption of recommendations from the 2011 CEOS Self-Study. Agenda Items 6, 7, 8

The 26 th CEOS Plenary – Bengaluru, India October, 2012 CEOS Work Plan and Actions – Page 4  Facts and Figures from the CEOS-GEO Actions Tracker  50 Actions for 2012  3 closed (2 successfully)  47 remain open  35 actions with updated reporting in the past 2 months  12 actions with no recent reporting (in many cases, many months)  2 actions were re-mapped  “Educated Guess” Assessment on Progress of Open Actions  24 Actions with good progress/at or near milestones  13 Actions with limited progress  8 Actions with no progress and little/no relevant reporting Difficult to Assess Progress for the Full Range of CEOS-GEO Actions Due to infrequent/unclear reporting and obsolete information -- A new philosophy toward “CEOS Actions” may be needed --

The 26 th CEOS Plenary – Bengaluru, India October, 2012 Part 2: CEOS Roles in the GEO Work Plan Infrastructure (IN)  4 of 5 Tasks  5 of 11 Components Institutions and Development (ID)  1 of 5 Tasks  2 of 9 Components Information for Societal Benefits  8 of 16 Tasks  12 of 40 Components CEOS is making a significant contribution to GEO through its leadership roles, actions and accomplishments

The 26 th CEOS Plenary – Bengaluru, India October, 2012 IN-01-C2 Component CEOS Leads the IN-01-C2 Component (Space-based Earth Observing Systems), which includes these 7 elements...  Promote rapid development of CEOS Constellations (CEOS Constellation Leads)  Develop an arctic hydrometeorological satellite network (ROSKOSMOS)  Explore synergies with the Earthmapper constellation for global high resolution observations (Surrey Satellite Technology, LTD - SSTL)  Establish and upgrade ground station capacity in Africa for CBERS (INPE)  Promote the AfricaGeoSat-1 Project (SA Dept of Science and Technology)  Establish actions securing ECV data from satellites (CEOS WGClimate)  Promote space missions to fill gaps from the loss of key instruments (i.e., Envisat, AURA) (CEOS Constellation Leads) Approximately quarterly status reports within the IN-01-C2 Component are desired by CEOS to support the IN-01 Task, IIB, and GEO.

The 26 th CEOS Plenary – Bengaluru, India October, 2012 IN-01-C2 Highlights CEOS Virtual Constellations  CEOS has advanced its Virtual Constellations to improve data access and interoperability in the fields of Land Surface Imaging; Atmospheric Composition; Ocean Colour Radiometry; Ocean Surface Topography; Ocean Surface Vector Wind; and Precipitation.  A new Virtual Constellation for Sea Surface Temperature (SST-VC) has been established, building upon the work of the Group for High-Resolution Sea-Surface Temperature (GHRSST). Plan to publish an IOCCG report with Level-1 Ocean Colour Radiometry requirements by the end of New Essential Climate Variable (ECV) Inventory  CEOS, CGMS, and WMO have established a new ECV inventory database to capture climate data record products from space agencies in an effort to identify and address gaps in a sustained climate architecture. These groups have also continued efforts towards defining a Climate Monitoring Architecture for space-based observations, and further developed a draft strategy document. Progress on CBERS ground stations in Africa and Spain  Brazil (INPE) and China (CRESDA) are proceeding with plans to establish and upgrade CBERS ground stations in South Africa and Spain by November New ground receiving stations could be set up for CBERS-3 data (launch scheduled for December 2012) in Hartebeeshoek, South Africa (MOU between China, Brazil and South Africa (SANSA), and in Maspalomas, Spain (MOU between Spain (INTA) and Brazil). Brazil, France and Gabon are joining forces to develop the SEAS Gabon project, which will deploy an antenna and operational ground station for receiving data in West Africa.

The 26 th CEOS Plenary – Bengaluru, India October, 2012 Next Steps and Issues IN-01-C2 Management Plan Obtain progress reports from the 7 sub-elements including those 3 with CEOS leadership. Monitor the progress of 5 CEOS actions linked to IN-01-C2. Metrics and Mapping Work with the Infrastructure Implementation Board (IIB) to develop a set of Performance Indicators to assess progress on GEO Tasks. Recently completed mapping of task outputs to Strategic Targets. Management Issues (1) GEO to identify a lead for the IN-01-C3 component (Coordination across Surface-based and Space-based Observing Systems) (2) Lack of reporting from ROSKOSMOS and SSTL. Task Progress Issues (1) Lack of approval for AfricaGEOSat-1 Project.

11 Part 3: CEOS Constellations IN-01: Earth Observing Systems C2: Development and Coordination of Space-based Observing Systems -Promote rapid development of the “CEOS Constellations Concept”. Observations from Virtual Constellations provide higher temporal, spatial, and spectral resolution, as well as improved data management and dissemination. Virtual Constellations are under development in seven areas: Precipitation, Atmospheric Composition, Land Surface Imaging, Ocean Surface Topography, Ocean Colour Radiometry, Ocean Surface Vector Wind, and Sea-Surface Temperature

12 SIT approach to VCs in 2012 Presumption that VCs have a key role supporting delivery of GEOSS space segment outcomes -3-year outcomes defined in support of 2015 GEO horizon Consistent with CEOS Self Study VC Report recommendations -Sharp-end emphasis (inc. climate architecture) -Stronger top-down direction and target setting – aided by stronger feedback and support mechanisms -More integrated approach, priority-driven Stronger feedback and support mechanisms -First dedicated VC workshop at SIT-27 meeting -Regular SIT Chair telcons with VC leads -Systematic representation of VC issues on SEC (compilation report)

13 Our VCs Oceans -Ocean Surface Topography: NASA & EUMETSAT -Ocean Surface Vector Winds: NOAA, EUMETSAT & ISRO -Ocean Colour Radiometry: NASA, ESA & ISRO -Sea Surface Temperature: ESA & NOAA Land -Land Surface Imaging: USGS, INPE & ISRO Atmosphere -Precipitation: NASA & JAXA -Atmospheric Composition: NASA & ESA

14 Ocean Surface Topography Key outcomes -Development of Jason-3 as continuation of the reference time series, and planning for Jason-CS -Sea level ECV support -OST Implementation Plan Progress -Jason-3 launcher selected, target launch date December 2014, Jason-CS satellite phase B on going, program approval process initiated by agencies -Engagement of OST Science Team (OSTST) as VC home Issues -How do we transform the OSTST from a multi-agency funding-driven construct into a CEOS mechanism for international involvement. (analogue to GHRSST for SST)? -Need to encourage involvement in the OSTST from agencies that fly “complementary missions” that are not presently formal members of OSTST (e.g. ESA).

15 Ocean Surface Vector Winds Key outcomes -OSVW data continuity (& reprocessing etc) -Cross-calibration of OSVW sensors -Improved utilisation in forecasting and warning services -User Training courses Progress -Engaging the IOVWST to leverage programs and resources -Training courses continuing Issues -Want clear direction in context of CEOS Implementation Plan -Operational requirements are as critical as climate

16 Ocean Colour Radiometry Key outcomes -ECV development -In-situ OCR White Paper Progress -Standing ECV WG established by IOCCG -INSITU-OCR White Paper circulated Issues -CEOS Agency review and support for INSITU-OCR -IOCCG Report: Mission Requirements for Future Ocean Colour Sensors – relevant agencies to reflect in planning -Resources a challenge

17 Sea Surface Temperature Key outcomes -ECV support -VC Portal -Improved SST calibration, inter-calibration, and validation -Training activities for satellite SST practitioners Progress -First VC meeting -Implementation Plan endorsed by SIT -Plan activities initiated including ECV pilot  All data being made available via CEOS IDN/CWIC Issues -Participation essential for the new VC

18 Land Surface Imaging Key outcomes -Mid Resolution Guidelines document -Support to GFOI & JECAM Progress -Reassessment of scope and direction (inc radar) -Exploring partnership with SDCG for GFOI needs etc -Addressing CSS and Portal Study points -Cross-catalogue and data access provision -LSI Explorer - Issues -Welcome direction on priorities from SIT -Participation

19 Precipitation Key outcomes -Deployment of GPM phase constellation satellites, maintaining continuity with TRMM, and advocacy of post-GPM phase PC -Precipitation ECV support – Response to GCOS Action A-8 - Ensure continuity of satellite precipitation products -PC Data Portal and links to CEOS Water Portal Progress -GCOM-W1 launch; M-T SAPHIR and MADRAS data availability -Phase 1 of data portal development Issues -Resources -Participation

20 Atmospheric Composition Key outcomes -Multi Sensor Volcanic Eruption Alert System -Implementation of Geostationary AQ Constellation Paper recommendations -ECV support – starting with Total Ozone -Limb scattering ozone profile measurement coordination -Potential implementation of GHG-relevant recommendations from CEOS Carbon Strategy Report Progress -Excellent progress in implementation of web-based volcanic alert system -AQ Paper work underway and societal benefits study planned Issues -Resources

21 Common issues - discuss Resources -Multiple VCs looking at SST model of alignment with GHRSST – suggesting existing VC arrangements and resources not commensurate with their objectives? Participation -The global challenges being addressed by the VCs requires coordination of all available observing systems -Participation status survey by SIT Team identified the systems of China, India and Russia as the most frequent omissions that would bring significant capability to the GEOSS Space Segment Direction -Some VCs less clear than others as to their purpose and outputs -LSI and OSVW would welcome clarity and context of a master plan -New planning documents must address this and engage VCs in development Information systems -SIT Vice Chair has proposed a study of more consistent capabilities