TOF for ATLAS Forward Proton Upgrade AFP concept: adds new ATLAS sub-detectors at 220 and 420 m upstream and downstream of central detector to precisely.

Slides:



Advertisements
Similar presentations
T958! Fermilab Test beam experiment to study fast timing counters for FP420 MOU between UTA, Alberta, Louvain, Fermilab (Brandt spokesman) Data taking.
Advertisements

AFP QUARTIC Fast Timing System James L Pinfold University of Alberta.
Barrel PID upgrade K. Inami (Nagoya-u) and PID group - R&D status - TOP counter - iTOP - Focusing DIRC - To do, cost estimation.
LHC/HERA workshop, WG 4 (17. Jan. 2005)
AFP STATUS REPORT – WHERE ARE WE ???? Steve Watts We have spent the last year being reviewed. Decision and letter from ATLAS EB November Proceed.
Photon Counting Sensors for Future Missions
1 QUARTIC, A TOF for ATLAS/CMS Forward Protons You didn’t know that ATLAS+CMS had forward protons? FP420 = Forward Protons 420m downstream of CMS & ATLAS.
1 QUARTIC: UTA Update Andrew Brandt, Chance Harenza, Joaquin Noyola, Pedro Duarte Preliminary UTA drawing of Mike Albrow’s concept for a fast time resolution.
Groups Involved University of Alberta, University of Texas at Arlington, University College London. Prague, Saclay, Stoneybrook, Giessen, Manchester,
High Energy Physics at UTA UTA faculty Andrew Brandt, Kaushik De, Andrew White, Jae Yu along with many post-docs, graduate and undergraduate students investigate.
LHC Fast Timing Detector R&D Use arrival time difference between protons to measure z- vertex compared with the central tracking primary vertex Purpose:
Jornadas LIP, Dez P. Martins - CFTP-IST The NA60 Silicon Vertex Telescopes Dimuon measurements Dimuon measurements Vertex telescope used in: Vertex.
Fast Timing Workshop Krakow, Nov 29 - Dec 1 st 2010 Part 2b.
FP420 Vacuum Ray Veness. Contents o What is FP420? o How would it be installed in the LHC? o What would it look like? o What are the issues/interest for.
Experimental set-up Abstract Modeling of processes in the MCP PMT Timing and Cross-Talk Properties of BURLE Multi-Channel MCP PMTs S.Korpar a,b, R.Dolenec.
High Energy Physics at UTA UTA faculty Andrew Brandt, Kaushik De, Andrew White, Jae Yu along with many post-docs, graduate and undergraduate students investigate.
Photodetection EDIT EDIT 2011 N. Dinu, T. Gys, C. Joram, S. Korpar, Y. Musienko, V. Puill, D. Renker 1 Micro Channel plate PMT (MCP-PMT) Similar to ordinary.
ATLAS Forward Proton Electronics Andrew Brandt, University of Texas at Arlington 1 AFP concept: adds new ATLAS sub-detectors at 220 and 420 m upstream.
1 QUARTIC Update Andrew Brandt (UT-Arlington), Mike Albrow (FNAL), Jim Pinfold (Alberta) Preliminary UTA drawing of Mike Albrow’s concept for a fast time.
1 ALICE T0 detector W.H.Trzaska (on behalf of T0 Group) LHCC Comprehensive Review, March 2003.
FP420/AFP Timing Two types of Cerenkov detector are employed: QUARTIC – two QUARTIC detectors each with 4 rows of 8 fused silica bar allowing up to a 4-fold.
The primary goal has been to have the AFP timing system fully defined for the AFP Technical Proposal by December The end result should be a system.
ATLAS Forward Detector Trigger ATLAS is presently planning to install forward detectors (Roman Pot system) in the LHC tunnel with prime goal to measure.
Experimental set-up for on the bench tests Abstract Modeling of processes in the MCP PMT Timing and Cross-Talk Properties of BURLE/Photonis Multi-Channel.
RPC detection rate capability ≈ 1/ρ Float-Glass ( Ω-cm) RPC rate capability < Bakelite( Ω-cm) one. New kind of doped glass was developed.
Start Counter Collaboration Meeting September 2004 W. Boeglin FIU.
Andrew BrandtSept 13 th 2005FP420/Cerenkov Intro 1 Location of LHC in France and Switzerland, with lake Geneva and the Alps in the background The ATLAS.
TOP counter overview and issues K. Inami (Nagoya university) 2008/7/3-4 2 nd open meeting for proto-collaboration - Overview - Design - Performance - Prototype.
Mike AlbrowSept 14 th 2006Time-of-Flight with GASTOFs im Test Beam 1 Fast Timing Counters for FP420/CMS and Test Beam Particle ID Mike Albrow, September.
AFP Introduction September 10th 2014 M. Bruschi, INFN Bologna (Italy) 1.
Timing properties of MCP-PMT K.Inami (Nagoya university, Japan) - Time resolution - Lifetime - Rate dependence Photon Detector Workshop at Kobe,
Fast Timing Mtg April 15 th 2009 Mike Albrow Fast Timing studies at Fermilab : Test beam plans notes from meeting April 15 th 2009 MTest May Wed 27 th.
July 4, 2008 SuperBelle Meeting, KEKPeter Križan, Ljubljana Peter Križan University of Ljubljana and J. Stefan Institute Burle MCP PMTs as photon detector.
O R&D programme to test detector concepts being developed for neutrino factory: wrong sign muon “Golden” signature R&D Programme MIND & TASD 15 m 100 m.
QUARTIC STATUS Nov 19 th 2014 Mike Albrow, Fermilab Baseline Plan Detector : Optics, SiPMs, (Readout board, connectors – S. Los) Time schedule Testing.
Apollo Go, NCU Taiwan BES III Luminosity Monitor Apollo Go National Central University, Taiwan September 16, 2002.
APS April Meeting Detector Construction of the Forward Proton Detector at D0 Michael Strang University of Texas at Arlington Diffractive Events FPD.
Barrel PID upgrade K. Inami (Nagoya) Ljubljana, Hawaii, Cincinnati and PID group - R&D status - Structure design - Prototype study - Beam test - Photon.
T979 QUARTIC Timing detectors for HPS240 M.Albrow, A.Ronzhin, S.Malik, Sergey Los, A.Zatserklyanyi, E.Ramberg, Heejong Kim New physics channels for CMS.
Matching monitors for SPS and LHC E. Bravin 31 March 2011.
1 10 Psec Workshop April 28 at UTA Follow up on visit to SLAC to meet Jerry Va’vra and very successful Pico-Second Timing Hardware Workshop at University.
The RICH Detectors of the LHCb Experiment Carmelo D’Ambrosio (CERN) on behalf of the LHCb RICH Collaboration LHCb RICH1 and RICH2 The photon detector:
1992PH.D. UCLA/CERN (UA8 Experiment discovered hard diffraction) Post-doc and Wilson Fellow at Fermilab -Discovered hard color singlet exchange.
High Energy Physics at UTA UTA faculty Andrew Brandt, Kaushik De, Amir Farbin, Andrew White, Jae Yu along with many post-docs, graduate and undergraduate.
Module-0 of AFP ToF Detector Libor Nozka on behalf of ATLAS Forward Proton Group Palacky University 1.
Overview of detector requirements Purpose: To put today’s session into context. Steve Watts and Krzysztof Piotrzkowski.
FP420/AFP Fast Timing Stage I: LHC luminosity 2 x10 33  t < 20 ps (
Pileup Background Rejection Ex, Two protons from one interaction and two b-jets from another Fast Timing Detectors for FP420 z=c(TR-TL)/2  z (mm) =0.21.
Mike AlbrowFP420 – May Timing and Pile-up Considerations 1 Pile-up in trigger and pile-up off-line (HLT) very different issues. Here I consider.
AFP Fast Timing System Andrew Brandt, University of Texas at Arlington in collaboration with Alberta, Giessen, Stony Brook, and FNAL, Louvain, LLNL (CMS)
Mike AlbrowSept 8 th 2005Test Beam for FP420 Vacuum Chambers/Detectors 1 Things we need to test (and why) How we could, together with BTeV people, detectors,
The BTeV Pixel Detector and Trigger System Simon Kwan Fermilab P.O. Box 500, Batavia, IL 60510, USA BEACH2002, June 29, 2002 Vancouver, Canada.
10 picoseconds original design goal (light travels 3mm in 10 psec!) gives large factor of background rejection; Phase I: lum up to several  t
Mike Albrow, FermilabHPS Comments, Manchester 20l0 Some random HPS comments Mike Albrow HPS is accepted in CMS as an R&D project : Physics case is accepted.
Precision Drift Tube Detectors for High Counting Rates O. Kortner, H. Kroha, F. Legger, R. Richter Max-Planck-Institut für Physik, Munich, Germany A. Engl,
Time resolution for the full detector system: 1. Intrinsec detector time resolution 2. Jitter in PMT's 3. Electronics (AMP/CFD/TDC) 4. Reference Timing.
FARICH status E.A.Kravchenko Budker INP, Novosibirsk, Russia.
ATLAS Forward Proton Upgrade AFP concept: adds new ATLAS sub-detectors at 220 and 420 m upstream and downstream of central detector to precisely measure.
CRYSTALS AS LONG-TERM IMPROVEMENT FOR LHC COLLIMATION
The timing upgrade project of the TOTEM Roman Pot detectors
Andrew Brandt, University of Texas at Arlington
HPS: R&D issues Krzysztof Piotrzkowski (UCLouvain/CERN)
Test Beam Studies for FP420 Fast Timing
CMS muon detectors and muon system performance
Andrew Brandt (UT-Arlington), Mike Albrow (FNAL),
(with R. Arcidiacono, A. Solano)
2017 AFP Beam Tests AFP has 1 week as main user and will also measure together with ATLAS ITk Pixel in H6B -> 2 periods of ~3 weeks
Latest Results from T979: PSec Time-of-flight
Variable distance from beam.
Performance test of a RICH with time-of-flight information
Presentation transcript:

TOF for ATLAS Forward Proton Upgrade AFP concept: adds new ATLAS sub-detectors at 220 and 420 m upstream and downstream of central detector to precisely measure the scattered protons to complement ATLAS discovery program. These detectors are designed to run at a luminosity of cm -2 s -1 and operate with standard optics (need high luminosity for discovery physics) AFP Components 1)Rad-hard edgeless 3D silicon detectors with resolution ~10  m, 1  rad 2)Timing detectors to reject overlap background (SD+JJ+SD) 3) New Connection Cryostat at 420m 4) “Hamburg Beam Pipe” instead of Roman Pots beam p’ AFP Detector LHC magnets 420 m 220 m H Andrew Brandt, University of Texas, Arlington 1

What does AFP Provide? 2 Allows ATLAS to use LHC as a tunable  s glu-glu or  collider while simultaneously pursuing standard ATLAS physics program Acceptance >40% for wide range of resonance mass Combination of 220 and 420 is key to physics reach! Mass and rapidity of centrally produced system Mass resolution of 3-5 GeV per event

4x8 array of 5x5 mm 2 fused silica bars QUARTIC is Primary AFP Timing Detector Multiple measurements with “modest” resolution simplifies requirements in all phases of system 1) We have a readout solution for this option 2)We can have a several meter cable run to a lower radiation area where electronics will be located 3)Segmentation is natural for this detector 4)Possible optimization with fibers instead of bars proton photons Only need a 40 ps measurement if you can do it 16 times: 2 detectors with 8 bars each, with about 10 pe’s per bar 3 UTA, Alberta, Giessen, Stonybrook (w/help from Louvain and FNAL) MCP-PMT

4 Micro-Channel Plate Photomultiplier Tube Burle/Photonis 64 channel 10 and 25  m pore 64 channel MCP-PMT has been tested extensively with test beam and laser and would be default for first stage except for lifetime issues

MCP-PMT Requirements Excellent time resolution: ps or better for 10 pe’s High rate capability: I max ~ 3  A/cm 2 Long Lifetime: Q ~ 30 C/cm 2 /year at 400 nm Multi anode: pixel size of ~6 mm x 6mm Pore Size: 10  m or better Tube Size: 40 mm round, 1 or 2 inch square Need to have capability of measurements in different parts of tube between 0-2 ns apart, and in same part of the tube 25 ns apart 5 Photek 240 (1ch) Hamamatsu SL10 (4x4)

Dt QUARTIC Timing 2008 CERN TB 56.6/1.4=40 ps/bar using Burle 64 channel 10  m pore tube including CFD! Time difference between two 9 cm quartz bars after CFD implies a single bar resolution of 40 ps for about 10 pe’s (10 pe’s from simulations/Test Beam). N pe =(area/rms) 2 6

6 mm Events Strip # Efficiency (a) (b) (c) QUARTIC Efficiency CERN TB All tracks (Bonn Silicon Telescope) Tracks with a Quartz bar on Use tracking (b)/(a) to determine that QUARTIC bar efficiency is high and uniform Shape due to veto counter with 15mm diameter hole 7

Beam Mode Fiber Mode (a) (b) (d) (c) 8 UTA Laser System

Time Resolution from Laser Tests 9 Laser tests of 10 µm tube show that with sufficient amplification there is no dependence of timing on gain (low gain operation extends lifetime of tube)

10 Saturation from Laser Tests Saturation independent of number of pixels hit, with proposed glass can obtain required rate

11 Electronics Layout  t~25ps  t~5ps  t~15ps

12 LOI approved, Technical Proposal being prepared UK groups funding cut leaves a hole/creates opportunity We have developed a fast timing system for AFP that seems to be capable of ~10 ps resolution, still some loose ends to address, requires R&D funding Work in progress: 1) final optimization of detector 2) developing final HPTDC board and trigger circuit 3) test beam analysis and laser tests (including studies of multiple proton effects, lifetime) 4) developing and testing long-life MCP-PMT (need funding) 5) evaluating radiation tolerance of all components Status