SPD Mechanics and Cooling Status of the activity in Padova Rosario Turrisi Contents: Calibration of Johansson measuring machine Cooling components Half-stave.

Slides:



Advertisements
Similar presentations
Manchester 09/sept/2008A.Falou & P.Cornebise {LAL-Orsay}1 CALICE Meeting/ Manchester Sept 2008 SLAB Integration & Thermal Measurements.
Advertisements

Marcello Lunardon - ALICE SPD Meeting 04/02/2003 Problems to be studied Test protocol Thermal conductivity tests What next STATUS OF GLUING AT
P. Béné, F. Cadoux, A. Clark, D. Ferrère, C. Husi, M. Weber University of Geneva IBL General Week - 11, 12 February 2010 IBL Stave Loading Status Summary.
1 IBL Stave & loading tools University of Geneva: G.Barbier, F.Cadoux, A.Clark, D.Ferrère, C.Husi, P. Iacobucci, M. Weber The main goal for today…  Review.
Workshop on Silicon Detector Systems, April at GSI Darmstadt 1 STAR silicon tracking detectors SVT and SSD.
Status Update on Mechanical Prototype in Rome November 6,
Stave loading with Si-heaters at UniGe with jigs v-1 August 2011 Maarten, Coralie, Franck, Didier.
SPD general meeting Pixel bus and Pilot MCM Integration CERN October 8, 2002.
MM mechanical prototype Work progress at CERN MicroMegas General Meeting, CERN, 5-6 November
1 CARRIER BUS LAYOUT(a) ± 193 mm ladder1ladder mm mm Pixel chip Michel Morel EP/ED 09/ x 425µ 256 x 50µ Decoupling capacitors
Ladder QA Status. Ladder QA Summary Ladder Remarks 1XXXXXXXXOOOOOXOO left : short (via-GND) right chip3 : cannot mask 2OOOOOOOOOOOOOOO.
MM mechanical prototype Work progress at CERN MMM Rome, 15/07/20131.
ILC Main Linac Superconducting Cryogen Free Splittable Quadrupole Progress Report V. Kashikhin for Superconducting Magnet Team.
Velo Module 0 minus minus Paula Collins. Investigating Module 0 thermal performance Baseline module design combines elements of different CTE (and Young’s.
IBL Mock Up IBL Mock Up MANUFACTURING 2011/04/29 François-Xavier NUIRY Maxence CURDY Andrea CATINACCIO CERN PH/DT/PO 1.
WP7&8 Progress Report ITS Plenary meeting, 23 April 2014 LG, PK, VM, JR Objectives 2014 and current status.
SVX4 chip 4 SVX4 chips hybrid 4 chips hybridSilicon sensors Front side Back side Hybrid data with calibration charge injection for some channels IEEE Nuclear.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MAP Winter Collaboration Meeting at JLab, Virginia February 28, 2011.
18 November 2010 Immanuel Gfall (HEPHY Vienna) SVD IR Mechanics 7 th B2GM.
Thomas Jefferson National Accelerator Facility Page 1 IPR October Independent Project Review of 12 GeV Upgrade Jefferson Lab October 18-20,
The ALICE Silicon Pixel Detector Gianfranco Segato Dipartimento di Fisica Università di Padova and INFN for the ALICE Collaboration A barrel of two layers.
The SPD cooling plant: status and plan of upgrades Rosario Turrisi.
Status of CERN M1R2 production LHCb Muon meeting sept.061Thomas Schneider -Beginning of 2006 two visits to Erbicol because of several reasons: -Material.
November 16, 2001 C. Newsom BTeV Pixel Modeling, Prototyping and Testing C. Newsom University of Iowa.
SPD Mechanics and Cooling Status of the activity in Padova Rosario Turrisi Contents: News about mechanics components Report on first test of cooling plant.
The SPD geometry in AliRoot Alberto Pulvirenti University & INFN Catania In collaboration with: Domenico Elia (INFN Bari) Outline:  Implementation  Volumes.
Thermo-mechanical activities at Valencia V. Castillo, C. Lacasta, A. Oyanguren, P. Ruiz PXD support (IFIC - Valencia) 26/7/2011.
Update on Alignment kit and Stave 250 frame and thoughts for Stave 130 M.Gibson (RAL) 2/5/13 1 Status of the frame for stave 250 Status of infrastructure.
Silicon Meeting July 10, 2003 Module and Stave Production Status James Fast Fermilab.
Mechanical Status of EUDET Module Marc Anduze – 05/04/07.
EP/ED group meeting1 ALICE PIXELS DETECTOR.
MWPC sandwich panels C.Forti INFN-LNF / LHCb-MUON EDR CERN 16 th April sandwich panels typologies of cathodes the mould the production procedure.
LNF activities on WPC Panels Construction of prototypes and layout Status of tooling Proto 0, open items, plan,...
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM29 at RAL, UK February 17, 2011.
SPD CFSS screening/Harness RB24-RB26 /ALICE Week A. Pepato – INFN PD 1 CFSS and ES electrical screening for SPD Harness RB24-RB26 Electrical.
M. Gilchriese U.S. Pixel Mechanics Overview M. G. D. Gilchriese Lawrence Berkeley National Laboratory April 2000.
SVD Mechanics Markus Friedl (HEPHY Vienna) BPAC, 26 October 2015.
13 January 2004V. Manzari - Quark Matter Oakland1 The Silicon Pixel Detector (SPD) for the ALICE Experiment V. Manzari/INFN Bari, Italy for the.
Marcello Lunardon - ALICE Gluing Meeting 010/03/2003 Study of glues for the assembly of the ALICE Silicon Pixel Detectors Status at The PADOVA.
QA/QC in MM SM1 Mod 0 Production at INFN QA/QC MM SM1 Mod 0 - G. Maccarrone 19-Jan
G.Barber Mice Tracker Mechanical Progress Tracker Mechanical Progress Contents:- Station Space Frame Station Layout Light Guide Map Connectors Patch.
Walter Sondheim 6/9/20081 DOE – Review of VTX upgrade detector for PHENIX Mechanics: Walter Sondheim - LANL.
K.W. Glitza University of Wuppertal IBL Stave (Lessons for Upgrade)
CERN SPD meeting, 4/06/2002V. Manzari for Bari SPD-Group1 Half-stave assembly Gluing procedure & glue characteristics Status of dummy components.
Progress on the Prototype design Catania Goikoetxea, Mikel Navarro Medrano, Javier Mainz, March 31st,
Marc Anduze – CALICE Meeting – KOBE 10/05/07 Mechanical R&D for Technological EUDET ECAL Prototype.
A.Cheremukhin (JINR, Dubna) CMS Preshower PRR, July 5-6, 2001, CERN1 Micro-module assembly -  -module elements - alignment of the silicon sensors to the.
RICH2 support and cooling mechanics status update Massimo Benettoni July 30,
IBL – UniGe involvements UniGe Team : G. Barbier, F. Cadoux, A. Clark, S. Débieux, D. Ferrère, C. Husi, G. Iacobucci, M. Weber Other member (KEK): Y. Takubo.
ITS week CERNR. Dima ALICE SPD, INFN-PD Assembling the complete stave on the Carbon Fiber Sector Support.
Stave #12 This stave core was built together with William Emmet, Tom Hurteau, and Jeffery Ashenfelter from Yale University in the week of November.
Assembly, construction and testing of the ALICE Silicon Pixel Detector V. Manzari / INFN Bari, Italy for the SPD Project in the ALICE Experiment INFN and.
Origami and PA design 6 February 2012 Christian Irmler (HEPHY Vienna) 1 Common SVD-PXD Meeting.
G. GiraudoGSI-Darmstadt MVD updates Thermal properties improvement Thermal properties improvement Cooling circuit test (Torino) Cooling circuit.
Marc Anduze first drawings of Ecal eudet module COPIED FROM : Marc Anduze PICTURES FROM : CALICE/EUDET electronic meeting – CERN – 12 July 07.
Marc Anduze – EUDET Meeting – PARIS 08/10/07 Mechanical R&D for EUDET module.
P. Sutcliffe Liverpool University
Study of Indium bumps for the ATLAS pixel detector
Beijing Institute of Technology
Micro Vertex Detector of PANDA Status of Strip BARREL and DISC
Hybrid Pixel R&D and Interconnect Technologies
Micro Vertex Detector of PANDA Strip Detector
WP9 ITS Mechanics and Cooling
Gluing jigs for Demonstrator
ALICE PD group meeting Andrea Francescon.
LumiCal mechanical design, integration with LDC and laser alignment
Studies of Quad Pixel Module assembly using paper laminate
The Stave Thermo-Conductivity QC Procedure Idea
Module/Ladder Assembly
Simplified Procedure Draft
Presentation transcript:

SPD Mechanics and Cooling Status of the activity in Padova Rosario Turrisi Contents: Calibration of Johansson measuring machine Cooling components Half-stave test

February 18, 2004Rosario Turrisi - SPD Meeting - CERN2 Strong efforts for: Learning and testing the new software PCDMIS 3.2 (DEA, Italy) Learning and testing the new software PCDMIS 3.2 (DEA, Italy) Software development for semi-automatic measurements; Software development for semi-automatic measurements; Analysis procedure for CFSS, mandrels, supports Analysis procedure for CFSS, mandrels, supports (reference frame, checking points…) Non-trivial results interpretation; Non-trivial results interpretation; First results: New mandrel (l=140 mm) PLANARITY less than 30  m Old mandrel (l=280 mm) PLANARITY less than 50  m What’s going on/next: Mandrels being produced at EuroMeccanica Mandrels being produced at EuroMeccanica CFSS: prototype existing, new ones waiting for molds CFSS: prototype existing, new ones waiting for molds Status of Johansson machine

February 18, 2004Rosario Turrisi - SPD Meeting - CERN3 Status of cooling components Received from Medelec: Received from Medelec: –Phynox tubes –CuNi capillaries Processing started: Processing started: –Squeezing –Ni+Cu layer on tubes ends –Fittings procurement

February 18, 2004Rosario Turrisi - SPD Meeting - CERN4 Half-stave test: assembly Support: carbon fiber + rohacell Support: carbon fiber + rohacell Interface card as support Interface card as support AOS thermal grease, 50 to 100  m thickness (borders to center of the half- stave) AOS thermal grease, 50 to 100  m thickness (borders to center of the half- stave) Ladder fixed by u.v. gluing Ladder fixed by u.v. gluing Hydraulic connectivity as of final project: phynox tube + capillaries (55 cm in - 22 cm out) Hydraulic connectivity as of final project: phynox tube + capillaries (55 cm in - 22 cm out) p,T pick-up points along the cooling line + 2 pt1000 on ladders p,T pick-up points along the cooling line + 2 pt1000 on ladders IR camera for temperature map recording IR camera for temperature map recording

February 18, 2004Rosario Turrisi - SPD Meeting - CERN5

February 18, 2004Rosario Turrisi - SPD Meeting - CERN6 Cooling prototype scheme

February 18, 2004Rosario Turrisi - SPD Meeting - CERN7 Points A 25.00°C B 25.68°C C 28.74°C D 33.11°C E 38.16°C F 38.16°C P=1.17 W, no cooling T AVE =32 o C chip number

February 18, 2004Rosario Turrisi - SPD Meeting - CERN8 P=1.11W, cooling on T OUT =12 o C Points A 15.91°C B 15.31°C C 15.91°C D 20.13°C E 19.56°C T AVE =17 o C chip number

February 18, 2004Rosario Turrisi - SPD Meeting - CERN9 P=8.92 W Points A 21.69°C B 22.11°C C 22.80°C D 34.86°C E 40.20°C T OUT =12 o C T AVE =28 o C chip number

February 18, 2004Rosario Turrisi - SPD Meeting - CERN10 Wires cut…

February 18, 2004Rosario Turrisi - SPD Meeting - CERN11 Disconnected chips Bus extender chip 1 chip 2 Many thanks to M. Tessaro (CMS) INFN Padova When/where damage happened? No defects noticed at a visual inspection (by magnifing glasses) Always protected by plastic cover, except: during mount during measurement for chip disconnection main drawbacks: temporary jig used and no automated movement

February 18, 2004Rosario Turrisi - SPD Meeting - CERN12 Half-stave V vs. A

February 18, 2004Rosario Turrisi - SPD Meeting - CERN13 P=1.35W, cooling on T OUT =18 o C Points A 14.25°C B 14.55°C 1 st chip C 14.25°C D 14.86°C E 16.35°C F 16.35°C G 15.31°C H 15.31°C I 14.86°C J 14.71°C K 14.71°C 10 th chip T AVE =15 o C chip number

February 18, 2004Rosario Turrisi - SPD Meeting - CERN14 P=4.75 W (cooling on!) Points A 18.98°C B 20.98°C 1 st chip C 21.41°C D 22.25°C E 24.18°C F 25.27°C G 22.53°C H 21.83°C I 20.13°C J 18.70°C K 18.41°C 10 th chip T OUT =18 o C T AVE =21 o C chip number

February 18, 2004Rosario Turrisi - SPD Meeting - CERN15 Temperature vs. Power – before cut

February 18, 2004Rosario Turrisi - SPD Meeting - CERN16 Temperature vs. Power – 2 chips cut

February 18, 2004Rosario Turrisi - SPD Meeting - CERN17 Transverse T profiles 3.5 w – last 2 chips disconnected 2 1 before disconnection

February 18, 2004Rosario Turrisi - SPD Meeting - CERN18 Summary and conclusions Mechanics and Cooling – –Mandrel production started – –Cooling components produced, processing started Half-stave test – –Cooling principle verified with real chips – –Origin of wire bonding damage under investigation