INTEGRATION OF RF STRUCTURES IN THE TWO-BEAM MODULE DESIGN G. Riddone, CERN, Geneva, Switzerland A. Samoshkin, D. Gudkov, JINR, Dubna, Russia Abstract.

Slides:



Advertisements
Similar presentations
COOLING TUBE ACCELERATING STRUCTURE MANIFOLD COUPLER VACUUM INTERFACE FLANGE RF INTERFACE FLANGE TUNING STUD ENGINEERING DESIGN AND FABRICATION OF X-BAND.
Advertisements

CLIC two-beam module integration issues 4 th CLIC Advisory Committee (CLIC-ACE), May 26-28, 2009 CLIC two-beam module integration issues G. Riddone on.
CLIC08 workshop Structure production: CERN activities and Master Schedule G. Riddone, W. Wuensch, R. Zennaro, Contributions from C. Achard, S. Atieh, V.
PETS components and waveguide connections CLIC Workshop 2007 David Carrillo.
5th Collaboration Meeting on X-band Accelerator Structure Design and Test Program. May 2011 Review of waveguide components development for CLIC I. Syratchev,
SLAC workshop 7-10 July 2009 WP1: microwave based accelerators Status of CLIC X-band high-power components G. Riddone, (contribution from A.
Time Varying Structural Behaviour of the PETS “On-Off” mechanism piston movement impact Riku Raatikainen
TMM of the CLIC Two-Beam Module T0 in the LAB – Proceedings to structural FEA Riku Raatikainen
Influence of the Gravity, Vacuum and RF on CLIC Module T0 Behavior R. Raatikainen.
R. Corsini, CLIC Project Meeting - 24 th May 2013 CTF3 1 CTF3: Highlights of the 1 st run R. Corsini for the CTF3 Team 1.
Different mechanisms and scenarios for the local RF
K. Alam, CLIC workshop, October 16-18, CLIC workshop, October 2007 Working group “ Two beam hardware and integration” Test module in the two.
CIEMAT CONTRIBUTION TO TBL PETS (January 2009) David Carrillo on behalf of the Accelerators Team.
ENGINEERING DESIGN AND FABRICATION OF PETS V. Soldatov¹, D. Gudkov¹, I. Syratchev², A. Samoshkin¹, G. Riddone², A. Olyunin¹, S. Atieh² 1 – JINR, Dubna,
Status of vacuum & interconnections of the CLIC main linac modules C. Garion TE/VSC TBMWG, 9 th November 2009.
30 GHz waveguide line modification towards 12 GHz.
International Workshop on Linear Colliders 2010 Design and fabrication update on PSI/Trieste X-band phase- space rotator structure Dmitry Gudkov 21-OCT-2010.
R&D proposals for EuCard 2 EuCard2, April 21Steffen Döbert, BE-RF  SRF basic research (W. Weingarten)  CTF3 and CTF3+, possible infra - structure for.
CTC, Two-beam module program (WP CTC-004) CLIC Modules (boundary conditions, technical system design and integration) CDR modules Prototypes.
RF Power production at CTF3 X-band structure collaboration meeting,SLAC 6 th July 2009 Steffen Döbert, BE-RF  30 GHz power production  12 GHz power production.
06-November-2013 Thermo-Mechanical Tests BE-RF-PM Review of the CLIC Two-Beam Module Program Thermo-Mechanical Tests L. Kortelainen, I. Kossyvakis, R.
1 Status of the CLIC two-beam module program A. Samochkine, G. Riddone Acknowledgements to the Module WG members 4 February 2014 CLIC Workshop 2014 (3-7.
X-Band RF Structure and Beam Dynamics Workshop, December 2008 CERN experience with 12 GHz high power waveguide components Igor Syratchev (CERN)
CLIC RF structure development meeting Structure cost study (introduction) G. Riddone,
CLIC cost estimate Hans-H. Braun, CLIC-GDE meeting, February 8, 2008  Cost model goals  Methodology  Cost distribution  Future improvements.
ABSTRACT The Compact Linear Collider (CLIC) is currently under development at CERN as a potential multi-TeV e + e – collider. The manufacturing and assembly.
Cost Model including Civil Engineering and Conventional Facilities Hans-H. Braun, CLIC ACE, June 20, 2007  Cost model goals  Methodology  Scaling assumptions.
18/04/12 Arnaud ACKER Mechanical Analysis of RF Network 1/14 CLIC Two-Beam Module type 0.RF Network. Drive-Beam Main-Beam.
ENGINEERING DESIGN AND FABRICATION OF X-BAND DAMPED DETUNED STRUCTURE V. Soldatov¹, D. Gudkov¹, A. Samoshkin¹, G. Riddone², A. Grudiev², S. Atieh², A.
CTC, Outcome from Two-beam Module Review on15/ G. Riddone,
CLIC08 workshop CLIC module layout and main requirements G. Riddone, on behalf of the CMWG Home page of the TBM WG:
CLIC Module WG 20/07/2009 H. MAINAUD DURAND, BE-ABP/SU Pre-alignment system and impact on module design.
CLIC two-beam modules TEST modules final schemes Dmitry Gudkov BE/RF CLIC Module Working Group.
cern.ch 1 A. Samoshkin 28-Feb-2011 Progress on CDR module design.
cern.ch International Workshop on Linear Colliders 2010 CLIC TWO-BEAM MODULE DESIGN & INTEGRATION 21-Oct-2010 WG 8 «TECHNICAL SYSTEMS»
Updated Thermo-Mechanical Model of the CLIC Two-Beam Module Riku Raatikainen
ENGINEERING DESIGN AND FABRICATION OF X-BAND ACCELERATING STRUCTURE TD24 WITH WFM Abstract To achieve high luminosity in CLIC, the accelerating structures.
CLIC Stabilisation Day’08 18 th March 2008 Thomas Zickler AT/MCS/MNC/tz 1 CLIC Quadrupoles Th. Zickler CERN.
TBTS Test Program & Schedule G. Riddone
cern.ch CLIC MEETING (17-Dec-2010) CLIC TWO-BEAM MODULE LAYOUT (short introduction) BE / RF 1.
October 14, 2008 C. Hauviller 1 Review of the mock-up’s C. Hauviller.
CLIC requirements on Warm Magnets (for CLIC Modules mainly) 1 M. Modena, CERN TE-MSC 13 April 2011 CERN-UK Collaboration Kick-off Meeting.
7-Sep-2011 CLIC RF Structure Development Meeting «BE/RF» TD26 WITH COMPACT COUPLER FOR CLEX (TD26 CC SiC) ENGINEERING DESIGN this structure will be used.
Peak temperature rise specification for accelerating structures: a review and discussion CLIC meeting
CLIC meeting CLIC module status G. Riddone on behalf of the CLIC Module WG,
CLIC workshop ”Two beam hardware and integration” working group Module layout and main requirement G. Riddone, A. Samoshkin
Risto Nousiainen, CLIC workshop ” Technical Issues, Integration & Cost ” working group Progress on Study of Module Cooling Risto Nousiainen.
1 CTF3 CLEX day July 2006 CLEX day 2006 Introduction G.Geschonke CERN.
Alignment system and impact on CLIC two-beam module design H. Mainaud-Durand, G. Riddone CTC meeting –
Pre-alignment of quadrupoles 1 CLIC stabilization day, STARTSLIDE PRE-ALIGNMENT OF THE MAIN BEAM QUADRUPOLES Hélène MAINAUD DURAND.
TBL experimental program Status and Results  Introduction  Status  Experimental program for 2010 and beyond  Outlook ACE, Steffen Döbert.
I. Syratchev, HGW 2012, KEK, Japan The high power demonstration of the PETS ON/OFF operation with beam. I. Syratchev for CLIC team.
Time Varying Structural Behaviour of the PETS “On-Off” mechanism piston movement impact Riku Raatikainen
02-Dec XB Dec-2010 XB-10 Engineering design, production and follow-up of X-band RF components G. Riddone in collaboration.
BRAINSTORMING ON LASER BASED SOLUTIONS FOR CLIC PRE-ALIGNMENT INTRODUCTION Hélène MAINAUD DURAND, BE/ABP/SU, 09/02/2010 Status of the study CLIC pre-alignment.
GOLD- ELECTROPLATING COOLING FITTING ADAPTER ACCELERATING STRUCTURE CONCEPTUAL DESIGN OF X-BAND ACCELERATING STRUCTURE TD26 CC SIC Abstract Many accelerating.
Module layout and types Two-beam module review, September 2009 Module layout and types G. Riddone for the CMWG,
Status of the CLIC module R&D G. Riddone on behalf of the CLIC module WG (special contributions from A. Samoshkin, D. Gudkov, A. Solodko, N. Gazis)
Two-beam module layout
TBL experimental program, evolution to RF power testing in TBL ACE 2011, February 2-3Steffen Döbert, BE-RF  Current status of TBL  Experimental program.
LCWS11 WG4 Fully featured accelerating structure engineering design
CLIC Parameter Working Group Two Beam Module Design
Update on the DB Girders FE Analyses
CLIC module working group
Thermal-Structural Finite Element Analysis of CLIC module T0#2
Thermal-Structural Finite Element Analysis of CLIC module T0#2
12 GHz High Power RF components requirements for CEA activities
List of changes and improvements for the next generation CLIC module
Update of CLIC accelerating structure design
Thermal test (lab modules)
Presentation transcript:

INTEGRATION OF RF STRUCTURES IN THE TWO-BEAM MODULE DESIGN G. Riddone, CERN, Geneva, Switzerland A. Samoshkin, D. Gudkov, JINR, Dubna, Russia Abstract The CLIC (Compact LInear Collider) design is based on two-beam acceleration concept currently developed at CERN. The RF power is generated by a high current electron-beam called Drive Beam (DB), running parallel to the Main Beam (MB). The DB is decelerated in dedicated power extraction structures (PETS) and the generated RF power is transferred via waveguides to the accelerating structures (AS). To facilitate the matching of the beams, components are assembled in 2-m long modules of few different types. Special modules are needed in damping regions or to contain dedicated instrumentation and vacuum equipment. The module design and integration has to cope with challenging requirements from the different technical systems. This paper reports the status of the engineering design and related technical issues. REFERENCES [1] H. Braun et al., "CLIC 2008 Parameters", CERN-OPEN ; CLIC-Note-764. [2] G. Riddone et al.: “Technical Specification for the CLIC Two-Beam Module”, MOPP028, EPAC’08, Genoa, Italy, June [3] I. Syratchev, A. Cappelletti, "A new High-Power RF device to vary the output power of CLIC Power Extraction and Transfer Structure (PETS)", WEPE026, IPAC’10, Kyoto, Japan, May [4] A. Grudiev, W. Wuensch, "Design of the CLIC Main Linac Accelerating Structure for CLIC Conceptual Design Report", LINAC’10, Tsukuba, Japan. [5] R. Nousiainen et al: "Studies on the Thermo-Mechanical behaviour of the CLIC Two-Beam Module", LINAC’10, Tsukuba, Japan. CONCLUSION More than 10,000 modules, housing micro-precision components with stringent requirements, are needed in the CLIC main linac. The module design and integration also aims at maximising the filling factor by optimization of the layout and better functioning of the related technical systems. Possible configurations are being implemented and compared in order to identify critical zones requiring a particular attention for further simulations and design. The manufacturing methods and their influence on the product cost are also addressed in the design phase. The CLIC Conceptual Design Report will be issued by mid of Therefore the baseline module configuration has been defined. For this, the thermo-mechanical behaviour has been simulated [5], and the necessary changes were introduced into the module design. ACKNOWLEDGMENT Authors sincerely thank all members of the “CLIC Module Working Group” for their valuable contribution. Compact Coupler with On-Off mechanism RF System The CLIC two-beam RF network includes the standard X-band rectangular waveguides WR-90 connecting PETS, AS and other supplementary devices such as choke-mode flange (CMF), Hybrid, high power load, splitter and WFM. The compact couplers, collecting and guiding the RF power from PETS and transferring it to the AS, were designed to combine a few functions. The “On-Off” mechanism stands for momentary (< 20 ms) cut of the power produced by PETS. VacuumInstrumentation Wake field monitor (WFM) Mechanical design under way in collaboration with CEA- Saclay. AS with WFM  in 2010 Beam position monitor (BPM) The DB BPM is developed and mechanical design is done. The MB BPM is still under design Power Extraction and Transfer Structure (PETS) The PETS are composed of eight bars milled with mm shape accuracy. The octants assembly, mini-tank, “On-Off” mechanism [3] combined with compact coupler, vacuum system, cooling circuits and interconnection are the subject for integration study. Accelerating Structure (AS) The AS design [4] is based on experience of an international collaboration. The AS with damping features is made of disks Ø80 mm joined by diffusion bonding at 1040°C. The shape accuracy is relatively high (0.005 mm). Many features of different systems, such as vacuum, cooling, wake field monitor as well as damping waveguide absorbers are incorporated into design. CLIC Module (Type 1) integration layout The design of a typical CLIC Module Type 1 incorporates all main components, including the MB Quad, replacing two AS, and technical systems, such as supporting, stabilisation, vacuum, alignment and BPM. Choke Mode Flange & Hybrid with Load The power transmission without electrical contact between two beams, and MB and DB independent alignment is getting possible with CMF. The Hybrid provides the power to two adjacent AS. The RF load is attached to one of the hybrid ports to avoid the RF reflection to the corresponding PETS. The RF splitters are used to equally feed the AS. A low pressure level (10 -9 mbar), needed for keeping the good beam quality and a number of components in a very limited space (i.e. with very low vacuum conductance) makes the design of the vacuum system very challenging. The interconnections between main components should sustain the vacuum forces, provide an adequate electrical continuity with low impedance and remain flexible not to restrict the alignment. Supporting and alignment systems The main components of both beams are supported on rectangular shaped girders linked to one chain all along the linac. The MB focusing magnet is an exception due to stringent position requirements. It has its own support and stabilization unit, which will be integrated in a later phase. The sensors of Wire Positioning System (WPS) are reading the transversal and vertical distances to one of the wires stretched between two beams for forming a straight reference line all along the linac..