Dec 2, 2003Tom Gaisser IceTop freeze tests Interim report from South Pole December 2, 2003.

Slides:



Advertisements
Similar presentations
Solar Thermal Install …KR Construction Arroyo Grande Central Coast KR & Hayward Lumber Install.
Advertisements

Preparation for ATLAS SCT/ID Endcap Completion at CERN Jo Pater Manchester, 4 January 2006.
20th July 2002 Chevron UK full surface tank fire.
Installation Instructions. Delivery Light fixtures, mounting structures and electrical components ship together Poles ship on a separate truck.
Catfish Pond Construction Gary Burtle Animal & Dairy Science, UGA Tifton, GA.
DoE Review June 6-7, 2000 Current Detector Configuration June 6, 2000  Solenoid, Central Preshower installed in central bore  A-layer MDTs installed.
AG-FS-6. The student will demonstrate and understanding of forest regeneration principles and practices. c. Identify the procedure to follow when ordering.
Sabine Block 13: Oil Remediation. SS. W. BEAUMONT BACKGROUND – INTIAL INDICATION  OIL SHEEN OBSERVED BY HELICOPTER  PIPELINE WAS INITIAL PROBABLE CAUSE.
Wed 15 Jul 2009 ATF2 weekly meeting Oxford MONALISA 1 MONALISA at ATF2 First installation report 15 July 09.
April 26, 2007 Rolf Nahnhauer IceCube Spring Meeting 1 IceCube Digital Optical Module Production R. Nahnhauer DESY.
Update Hardware for conductive cooling of the quench resistors has been fabricated at LBNL. Preparation for installation to start this week. Installation.
© 2010 McQuay International 1 McQuay Delivered VAV System Product Overview October 2010.
MICE - UK Project Progress Roy Preece 30 th April 2013.
November 24, 2004 Rolf Nahnhauer1 PROJECT : IceCube Digital Optical Module Production at DESY Zeuthen.
RICE-II Engineering & Deployment Kenneth Ratzlaff, John Ledford Instrumentation Design Lab The University of Kansas.
Enhanced Hot Water Drill Season Drill Operations Overview Berkeley Meeting March 19-23, 2005.
LBT Q Engineering Review DYB. 26-Oct-2007LBT Q Engineering Review Highlights (Q3/2007) Currently in Commissioning Phase Currently in Commissioning.
Preparations in the MICE hall Video Conference 25 th June 09 Tim Hayler Andy Lintern Peter Lau Geoff Barber.
Status of IceTop tank testing Tom Gaisser, Madison, Feb 20, 2003.
NSF Baseline Review February 10-12, 2004 IceTop Tom Gaisser Bartol Research Inst., Univ. of Delaware Jan 28, 2004T. Gaisser, L3 Lead for IceTop1.
End-To-End Real Estate Solutions Confidential Winterization Training.
David Seckel, IceTop Status, Mons, Oct. 22, 2003 IceTop: PY2 Bartol Res. Univ. Delaware: Xinhua Bai, John Clem, Paul Evenson, Tom Gaisser, Andrew.
Karsten Heeger, Univ. of Wisconsin UW, June 3, 2010 The DM-Ice Test Detector Detector Concept Mechanical Assembly Vessel Options Logistics Considerations.
Nov 30, 2003Tom Gaisser The IceTop component of IceCube Perspective from the South Pole.
Chapter 37 Pipeline Construction. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Explain the.
The Mary Rose. The Raising of the Mary Rose The Mary Rose was built between 1509 and 1511 and served in Henry VIII’s navy for 34 years until she sank.
SAWMILL SAFETY Module 4 - Kilns. Timber Products Safety There is a high incidence of serious and fatal injuries in our industry. The Timber Products Manufacturers.
March 2015 ALLEN INDEPENDENT SCHOOL DISTRICT School Board Meeting March 2015 Construction Update for the Service Center.
TRENTON Casing Filler Presentation
Status of the MICE Project & Dashboard MICE Project Board 14 th November 2013 Roy Preece.
Icecube DOM Main Board Status and Development Plans R. Minor October 2003.
Engineer Training Ink Insertion TJ8300 / TJ8500 Ink Insertion.
Jan 16, 2004Tom Gaisser 1.3 Cost & schedule review The IceTop component of IceCube Area--solid-angle ~ 1/3 km 2 sr (including angular dependence of EAS.
Science Advisory Committee March 30, 2006 Jim Yeck IceCube Project Director IceCube Construction Progress.
1 US Cost & Schedule Summary W. R. Edwards US Project Manager CD-2/3a Review January 8, 2008 BNL.
Spectrometer Solenoid Schedule MICE Schedule Review May 23 rd 2011 Roy Preece (STFC RAL, LBNL)
David Seckel, IceTop Baseline Review, Madison, Dec. 4, 2003 IceTop Baseline Review Dec. 4, Madison WI.
M. Brooks DC Meeting, 15-Sep-00 MuTr Mechanics Status SOUTH ARM: Chambers fabrication complete Stations 2+3 installed Station 1 test-installed will be.
CM 28 – 6 th October 2010 LH2 Infrastructure M Hills M Courthold T Bradshaw I Mullacrane P Warburton.
Substation L1/ Booster Substation Y-BE2 Update #3 August 15,2012.
Paul Evenson Thursday, December 4, 2003 IceTop Tank Manufacturing Paul Evenson University of Delaware December 4, 2003.
IceTop Collaboration Meeting Uppsala, Oct. 9, 2004Tom Gaisser1 IceTop IceTop station 2004 test tanks Calibration Verification 04/05 DOM operation Summary.
1 HBD: Update and Schedule Itzhak Tserruya DC Meeting, BNL, April 13, 2005 Outline:  Full scale prototype status  Light source test  Construction Schedule.
Nov 30, 2003Tom Gaisser The IceTop component of IceCube Perspective from the South Pole.
IBL CO 2 cooling planning 03 July 2013 Jan Godlewski, Bart Verlaat, Lukasz Zwalinski 1
Physical Description of IceTop 3 Nov IceTop Internal Review Madison, November 3-4, 2010 Physical Description of IceTop Paul Evenson, University.
Substation L1/ MCC L1 Update #2 July 27,2012. Status of Procurement  Substation  All approval drawings submitted  Testing is expected to take place.
Dec
04/05 IceTop schedule * Power required ** Water required Dec 1 Dec 10 Dec 20 Jan 6 Connect to TCH Fill tanks Jan 20 Feb 3 Backfill Cover tanks Run DOMs.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
Cathode Production Status Muon Week April10th 2003 A. Benvenuti INFN Bologna.
DOM Thermal Test Sept X.Bai, D.Swarnkar,. 26”(L) X 28(1/4)”(W) X 20”(H) blue board box filled with fiber glass insulation blue board insulation.
5K shield removal experiment in STF cryomodule Norihito Ohuchi 2008/11/181ILC08-GDE-Meeting (CHICAGO)
Karsten Heeger, Univ. of Wisconsin UW, June 3, 2010 The DM-Ice Test Detector Detector Concept Mechanical Assembly Vessel Options Logistics Considerations.
Mike Andrews August 17, Week 16 NuMI Activities Leak testing of DI bottles & Casks Complete all bottles & casks RAW Impulse line upgrade Finished.
S A Griffiths CM42 June 2015 Electrical & Control.
WBS 1-7 System Assembly & Installation John Voirin August 10-11, 2011.
Plaistow BOS Meeting 7/24/2017
IBBelle: Status & Plans
S1G Experiment Schedule Plan
Francois and Lau EATM 17 July 2012
Optimized Factory + Logistics
Far Detector Activities Late 2017 – Early 2018
10/month is the present production rate 2 FTE + sporadic contributions
South Pole Tank Test This presentation contains some information about the tank sensors and measurements.
Subsea 100 Global Services Products Presentation
IBBelle: Status Commissioning at MPP Transport to KEK
TRENTON Casing Filler Presentation
Teleconference ACS – FREIA 19th June 2017
Alignment Diagnostic System Status
Presentation transcript:

Dec 2, 2003Tom Gaisser IceTop freeze tests Interim report from South Pole December 2, 2003

Dec 2, 2003Tom Gaisser South Pole 03/04 season SPASE counting house

Dec 2, 2003Tom Gaisser 100 m Location of two test tanks, Nov ‘03

Dec 2, 2003Tom Gaisser Construction of tanks 2 Tanks delivered to Bartol in July; plumbing assembled Tanks & plumbing integrated, palletized and foamed at factory in VA late August Tanks arrive at Pt. Hueneme Sept 2

Dec 2, 2003Tom Gaisser Freeze-control equipment & DOMs Freeze control assembled at Bartol August - October Shipped with support equipment Sept-Oct (including sunshades) 4 DOMs with rev2 boards assembled, tested, shipped from UW October 31 Two views of freeze-control equipment mounted on tank inside sunshade at site

Dec 2, 2003Tom Gaisser Reassembly at South Pole Gaisser, McDermott, Roth arrive at South Pole Nov 10 Used half of 40’x15’ heated Jamesway #76 in construction/cargo area Uncrated and assembled tanks near Jamesway; location convenient to logistical support Time: 2 persons, 1.5 weeks DOMs arrive Nov 15

Dec 2, 2003Tom Gaisser Preparation of site In parallel with assembly –Locate & survey site –Excavating trenches: two hours using bulldozer with 14’ blade Nov 18 –Trenches 15 ft wide by about 40 ft long –Tanks separated by 10 m –Power cord from SPASE supplied by RPSC Nov 19

Dec 2, 2003Tom Gaisser Transport to site Nov 19 –Load tanks on sled – pull across skiway to MAPO –Forklift from MAPO to site –Level bottom of trenches –Set & level tanks –3-man RPSC crew took a total of 2 hours

Dec 2, 2003Tom Gaisser Install freeze-control & DOMs Tank10 (1.0 m ice) –Install freeze box –Install ejection pipe –Bring up software –Install DOMs –Nov Tank09 (0.9 m ice) –Same procedure –Nov 25-26

Dec 2, 2003Tom Gaisser Fill tanks Tank10 –Freeze up of hose on first attempt (Nov 21) –Successful fill Nov minutes to fill < 10 RPSC man hours for transport and filling Tank09 –Filled Nov 26, very smooth operation

Dec 2, 2003Tom Gaisser Monitor freezing Two days to freeze over –Frost-covered ice –Clear; wind 6-10 kts –T = -40 to -35 deg C –Ice-surface at -20 deg C  37 days to freeze 1 m But Tank10 at 2/3 ideal rate Will reduce heat tape, pump cycle time, add fans to reduce freeze time Tank09: problems with temp sensors currently being addressed. No water ejected after 100 hours suggests slow leak. To be investigated. Ice appears good. Winter-over scientist will take over monitoring to bridge until arrival of next crew (J. Eisch, S. Yoshida)

Dec 2, 2003Tom Gaisser Remainder of season Dec 1-5: train winter-over scientist (J. Lackey) and address problems Dec 10-30: Monitoring continues –S. Yoshida, Dec 10-31; J. Eisch Dec 20-Jan 6 Dec 29-Jan 20: Install DOM-DAQ –J. Kelley, A. Karle with Evenson & S. Tilav Jan 12-27: Close tank –P. Evenson, Jan 12-27

Dec 2, 2003Tom Gaisser Lessons so far Modularize equipment –“plug and play” design to reduce labor needs – Programmable Logic Control to streamline assembly and operation Should include temperature control of heat tape Commercial OTS control units at each tank –See memo of Andrew McDermott based on experience this season Manufacturing schedule should be at least one season ahead to allow shipping by vessel Need full Jamesway (40 x 15 ft) for staging Begin early in season with tank assembly Counting house, surface cables required early to allow setting tanks Tanks to be filled as soon as Rodriquez well for drilling is ready—should not wait to be filled as each hole is drilled.