1 Dead Bus Pricing Issue/CRR Performance Issue TAC 3 February, 2010.

Slides:



Advertisements
Similar presentations
Outage Cost Study Market Analysis and Design Outage Coordination Improvement Task Force 3/23/2015.
Advertisements

CRR Shortfall – Revenue Equalization Part 2 (Continuation from 2/21/08 TPTF discussion) Bill Barnes TPTF 3/5/2008.
March 13, 2013 Day-Ahead Market (DAM) Clearing Process follow-up from February WMS Matt Mereness, ERCOT Manager DAM & CRR.
NPRR Proposed Changes TPTF Meeting 26 Aug 2008.
John Dumas Director of Wholesale Market Operations ERCOT Operating Reserve Demand Curve.
FAST Procurement and Pricing May 28, 2015 TAC Meeting 1.
ERCOT RMR Deployment and Cost Proposals By: Matt Mereness and Ino Gonzalez.
NPRRs NPRR680 Allow QSEs to Self-Arrange AS Quantities Greater Than Their AS Obligation. This Nodal Protocol Revision Request (NPRR) proposes to allow.
1 CRR Credit Policy Task Force Update TPTF July 21, 2008.
Real Time Mitigation During Exceptional Fuel Cost Events.
September 2012 Proposed CRR Auction Credit Changes: Summary of Draft NPRR.
1 Market Trials Congestion Revenue Rights Weekly Update June 25, 2010.
CRR Auction Scope John Moseley. To outline aspects of the CRR market process to assure that these proposed CRR market protocols (as interpreted by ERCOT.
1 NPRR 484/554 – Revisions to Congestion Revenue Rights Credit Calculations and Payments Market Call ERCOT Public July 31, 2013.
April, 2008 Maximum Shadow Price. April, 2008 Protocol Requirement: Transmission Constraint Management (2)ERCOT shall establish a maximum Shadow.
1 Nodal Stabilization Market Call December 14, 2010.
Bill Hellinghausen EDF Trading North America
NPRR385, Security Violation Analysis and Reporting and Negative Price Floor WMS Meeting February 15, 2012.
January 21, 2010 Security Constrained Economic Dispatch Resmi Surendran.
Nodal Program Update and SEWG Update COPS 1/11/2011 Jim Galvin.
Lead from the front Texas Nodal 1 Resource Node Locations WMS Meeting.
TAC Meeting Update. Board Update and TAC Voting Item Kenan Ogelman, Vice Chair of TAC gave the Board Update. It included recommendation that TAC.
CRR Shortfall – Revenue Equalization Part 3 (Continuation from 3/5/08 TPTF discussion) Bill Barnes/Sharon Wang TPTF 3/21/2008.
Slack Bus Change and Impact to Market Market Analysis, ERCOT QMWG Sep. 4, 2015.
MCWG Update to WMS 08/14/2013. MCWG Update to WMS General Update -July 31 st Joint MCWG/CWG Meeting Review NPRRs All operational except – NPRR 552 – Additional.
CRR Issues Transparency provided by CRR Reports CRR EDS handbook Business process NPRR TPTF November 27, 2007.
– 1Texas Nodal Texas Nodal Electrical Buses – 2Texas Nodal Electrical Bus Definition as Proposed in NPRR 63 Electrical Bus A physical transmission element.
Congestion Management Working Group WMS update 11/7/2012.
DAM Overview: Processes & Tools in the DAM Shams Siddiqi, Ph.D. Crescent Power, Inc. (512) April 2, 2008.
Commercial Operations Subcommittee Update to TAC September 7, 2012 Harika Basaran, COPS Chair 2012 Jim Lee, COPS Vice Chair 2012.
9/17/2012 CSWG CSWG – ERCOT Update ERCOT. 2 Settlements Project & Operational Updates February 27, 2012 NPRR 347: Combined Daily Invoice –Still on track.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Settlement Invoices Business Requirements Settlements and.
1 Tests for Reasonable LMPs & Price Validation Tool Overview October 27, 2009 NATF.
Technical Advisory Committee (TAC) update to RMS Kathy Scott January 3, 2013Technical Advisory Committee 1.
DAM Performance Issues with CRR Offers Steve Reedy Market Design Manager NATF 31 August 2010.
Congestion Revenue Rights 1 Texas Nodal Market Implementation Program CRR Requirements Updates CRR Project Team – Presented by Beth.
ERCOT Market Credit Working Group Presentation to the Finance and Audit Committee Payment Short Pay/Default and Uplift for Congestion Revenue rights (CRRs)
CMWG NATF 11/02/2010- CCT/DME update + Outages in the CRR Model follow-up Steve Reedy – Market Design and Analysis 1.
Lead from the front Texas Nodal 1 Resource Node Locations WMS Subgroup Meeting.
November 27, 2012 NPRR322, Real-Time PTP Option Modeling Implementation Overview.
CMWG Update to WMS Report of CMWG Meeting of M. Wagner Edison Mission Marketing & Trading Thanks to ERCOT Staff for Graphics See ERCOT.
Market Operating Level Agreement (OLA) Discussion Betty Day 8 December 2009 Nodal Advisory Task Force.
Discussion on FGR Settlement Protocol Language David Maggio CMWG February 17, 2014.
NPRR 649 Addressing Issues Surrounding High Dispatch Limit (HDL) Overrides Katie Coleman for Air Liquide (Industrial Consumer) ERCOT Board February 9,
ERCOT Monthly Operational Overview (January 2015) ERCOT Public February 15, 2015.
MCWG Update to WMS 2/9/2010. Agenda Items Exposure / Collateral Status Update 1/26 MCWG/CWG Joint Meeting – Potential NPRR to enable expiring CRRs to.
2% Shift Factor dispatchable rule discussion and alternatives for the 2% rule Kris Dixit 1.
Protocol Revision Subcommittee Tom Burke January 3, 2013.
CMWG Update to WMS Report of CMWG Meeting of
1 Market Trials Congestion Revenue Rights Weekly Update May 28, 2010.
1 Nodal Stabilization Market Call December 16, 2010.
1 Credit Parameters Review TAC July 2, Protocol Section , “Credit Requirement for DAM Bids and Offers” specifies: Credit Requirement for.
DAM Performance Issues with CRR Offers Steve Reedy Market Design Manager TAC 2 September 2010.
RCWG Update to WMS March 7, Draft NPRR, Caps and Floors for Energy Storage Resources Chair of ETWG gave high level overview ERCOT had questions.
Day-Ahead Market Discussion/Clarification TPTF April 24, 2006.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Day-Ahead Mini Market Mini Market Walk Through for Day-Ahead.
CRR Network Model One-Line Diagram Beth Garza TPTF April 22, 2008.
CRR Default and the Nodal Market Wholesale Market Subcommittee February 20, 2008.
Money Transfer Due to Real-Time Irresolvable Constraint Resmi Surendran ERCOT.
Market Continuity WMS June 8, PUBLIC What is Market Continuity? The processes by which ERCOT market-related systems and activities are returned.
Day Ahead Market QSE’s Credit Requirements Concerns and Solutions August 14, 2008.
Real Time Revenue Neutrality CSWG 2/27/2012 Jim Galvin.
CRR Deration and NPRR821 WMS 09/06/2017.
Nodal Program Update to Cops
NPRR833 Workshop: Contingency Processing in CRR, DAM and SCED
DALE MCWG / CWG 3/10/2010.
LCRA Comments regarding NPRR 821
NPRRs 815NPRR Revise the Limitation of Load Resources Providing Responsive Reserve (RRS) Service.  This Nodal Protocol Revision Request (NPRR) revises.
John Dumas Director, Wholesale Market Operations
Settlements Analysis due to SFT Deration Issue
Presentation transcript:

1 Dead Bus Pricing Issue/CRR Performance Issue TAC 3 February, 2010

Dead Bus Pricing Issue CRRs and PTP Obligations were priced differently in different markets –Due to an unexpected interaction between the “Dead Bus” pricing logic and the network model, Models for forward markets should = models for settling markets –The CRR network model ~ The DAM network model –The DAM network model ~ the Real-Time network model Some Differences are unavoidable –Changes in line ratings due to temperature –Forced outages Critical that Pricing Location is the Same –If a product is sold at Permian Basin in the CRR auction it is a critical assumption that it will be priced at Permian Basin in the DAM market.

“Dead Bus” Pricing in the DAM Electrically dead locations cannot get priced in the normal way. If a Pricing Location is dead, system looks to get prices from other specially designated locations in the station –“Electric Buses” –DAM NP4.5.1 (9) –RT NP6.6.1 If all Electrical Buses in station are dead, the system uses the price of the system marginal energy cost. –Sometimes called “System Lambda” ERCOT discovered that some pricing locations were getting consistently priced at the “System Lambda” and this was leading to uplift and not fully paying CRRs

Example – Permian Basin Unit 5 in DAM Open Breaker Pricing Location at Dead Electrical Bus Electrical engineers think of these dots as buses, but they weren’t specially designated “Electrical Buses” in the model The only “Electrical Bus” in the model was dead; hence the system picked up “System Lambda” as the price Lines to other station

Revenue Neutrality Effects This can effectively cause overselling of the CRR and/or DAM market. CRR overselling leads to reduced payment to CRR holders DAM overselling leads to Real Time Revenue Neutrality charges

“Dead Bus” Pricing Logic Revenue Implications – CRR to DAM CRR from Permian Basin Unit 6 to Permian Basin Unit 5 –The Permian Basin Unit 5 bus is live in the CRR model. –The CRR price is calculated as the difference between the prices within a station. –They are very low cost (many times free). Permian Basin Unit 5 is dead in the DAM model. –The Permian Basin 5 station is such that if the unit is off-line there are no live Electrical Buses in the station. –Permian Basin Unit 5 is priced at “System Lambda” –May pay off significantly (depends on system conditions). –This payment will not be supported by congestion rent Causes lower payments to CRR Account Holders

“Dead Bus” Pricing Logic Revenue Implications – DAM to RT PTP Obligation from Permian Basin CT 1 to Permian Basin Unit 6 –The Permian Basin Unit 6 bus is live in the DAM model. –The PTP OBL price is calculated as the difference between the prices within a station. –They are very low cost (many times free). Permian Basin Unit 6 is dead in the Real Time model. –The Permian Basin 6 station is such that if the unit is off-line there are no live Electrical Buses in the station. –Permian Basin Unit 6 is priced at “System Lambda” –May pay off significantly (depends on system conditions). –This payment is unsupported by congestion rent May cause RT Revenue Neutrality Uplift Initial Estimates are that this caused ~$5M of RT Revenue Neutrality uplift for December

Solutions Add more Electrical Buses to model such that generator breaker switches cannot de-energize all Electrical buses in a Resource station –These were added in model load on the night of 1/31/2011 –609 “Electrical Buses” / 140 Substations Submit NPRR preventing CRR and PTP Obligation bids within a station.

Example – Permian Basin Unit 5 in DAM Open Breaker Pricing Location at Dead Electrical Bus Designate these as “Electrical Buses” With these “Electrical Buses” in the model the system will pick up the appropriate price Lines to other station

CRR Performance Issue The Run time of the CRR auction for February 2011 was very long Root Causes for increased length –Much larger number of bids/binding constraints Removing $ /MWh bids from the bid set cut the clearing time by 97% but only reduced auction revenue by 4% –Cycling of Tie-Breaking logic –Need for multiple “passes” of auction to account for SPS/RAPs

CRR Performance Solutions Implementable for March 2011 Auction –Different hardware/hardware settings –Different tie-breaking parameters –Configure model such that SPS/RAPs all included in model from outset –Our analysis indicates that these actions taken together will have very significant effect on run-time of the CRR auction Future actions under investigation –Implement Bid Fee (Should reduce # of bids) –NPRR to restrict max bid size to 500MW (reduces tie breaking issue) –Implement DAM SPS/RAPs logic in code –Install newer version of CRR clearing engine