Site Selection and Security Considerations Mark Heggli Innovative Hydrology, Inc. Consultant To The World Bank Expert Real-Time Hydrology Information Systems.

Slides:



Advertisements
Similar presentations
HYDROMETRIC SITE SELECTION Training for PNG Power Port Moresby July 2012.
Advertisements

Application of the Continuous Slope-Area Method for Determining Stream Discharge and Development of Rating Curves in Ephemeral Channels Navajo Nation Hydroclimate.
A section has been added regarding Stream Restoration Design Criteria: A. Designs for stream restoration try to mimic natural conditions present in stable.
Surface Water Chapter 9.
Mark Heggli Consultant to the World Bank Expert Real-time Hydrology Information Systems Workshop Module 4: Data Management Solutions for a Modernized HIS.
Weirs and Canal Intakes By: Nell Kolden and Taylor Barnett Thursday April 12, 2012 CIVE 717.
COURSE COORDINATOR: DR. J. O. ADEJUWON OFFICE LOCATION: ROOM B203, COLERM BUILDING OTHER LECTURERS: DR. GRACE O. OLUWASANYA.
Warm – Up 9/9 What are the four conditions that influence the amount of runoff an area would have? Get out your surface water notes from Friday to prepare.
Streamflow and Runoff The character, amount, and timing of discharge from a basin tells a lot about flow paths within the basin Therefore, important to.
River Studies. Outline of Events During your river field work you will be visiting two different sites in the lower course of the river. At each site.
Subwatershed Outlet (B1 project area) Hydrological Monitoring Institutional strengthening The newly established Tana Basin Organisation have been trained.
Hydrological Information System Module 20 – Integrated Reservoir Monitoring System.
Defining the Status Quo. Definition of Status Quo The “Status Quo” describes existing or anticipated conditions of a water resources system if policies,
Design of Open Channels and Culverts
RQ30 RADAR SYSTEM (An Australian Perspective) RQ30 RADAR SYSTEM (An Australian Perspective) Malaysia JPS Offices Ampang, Kuala Lumpur 8 th May 2012.
FLOODS, STREAMS AND MEANDERS. GAUGING STATION On all major streams Measures Stream Height Height vs. Discharge (volume) Flood Stage and height above Flood.
HEC-RAS US Army Corps of Engineers Hydrologic Engineering Center
G.C.S.E Controlled Assessment An investigation of river erosion along a chosen stretch of river.
Part 2 Some Basic Aspects of CHANNEL HYDRAULICS. The volume of water that passes by any given point along a watercourse is called “Q”, for quantity of.
Discharge Measurement Concepts September 2012 – Glen Hess,TESNAR, Oregon (Many slides from USGS Surface Water Field Techniques May 2008 Class)
Using field exercises to develop critical thinking skills in hydrology students Eric W. Peterson Department of Geography-Geology.
1 Toggle Fullscreen mode with this button above Audio also available via phone: For assistance, call: If.
Tower SystemsJanuary AMS Short Course on Instrumentation 1 Installation and Use of Meteorological Tower Systems Melanie A. Wetzel Desert Research.
Abstract Background Conclusion Stream Bed Morphology and Discharge Rates of Deckers Creek Data was collected at 5 different points along a 100 meter transect.
1D Steady State Hydraulic Modelling Bratton Stream Case Study.
Workshop on DEVELOPING REGIONAL COOPERATION FOR SHARED KARST AQUIFER MANAGEMENT IN SEE June 2008 Thessaloniki, Greece Monitoring data and existing.
Workshop Mark Heggli Consultant to the World Bank Expert Real-time Hydrology Information Systems Module 11: Managing HIS During Warranty Period.
Workshop Mark Heggli Consultant to the World Bank Expert Real-time Hydrology Information Systems Module 6: Operations & Maintenance and Training.
Workshop Mark Heggli Innovative Hydrology, Inc. Consultant to the World Bank Expert Real-time Hydrology Information Systems Module 6: Training, Operations.
Mark Heggli Innovative Hydrology, Inc. Consultant to the World Bank Expert Real-time Hydrological Technology Module 1: Essential Elements of a Hydrological.
Impact of data quality on watershed management—Need for automatic watershed monitoring By: M. J. Abedini and P. Karimaghaei.
How Do You Choose A Bank Protection Method? A delicate balance is required, as demonstrated here by Roundman Chosen method (or combination of methods)
WORKSHOP Mark Heggli Innovative Hydrology, Inc. Consultant to the World Bank Expert Real-time Hydrology Information Systems Module 9: Equipment Delivery.
Site Selection and Security Considerations Mark Heggli Innovative Hydrology, Inc. Consultant To The World Bank Expert Real-Time Hydrology Information Systems.
__________________________ SITES INTEGRATED DEVELOPMENT ENVIRONMENT for WATER RESOURCE SITE ANALYSIS COMPLEX WATERSHEDS SITES IN SERIES.
THE HYDROLOGIC CYCLE. The Hydrologic Cycle The Hydrologic Cycle - Fresh Water Storage Reservoir % of Total Fresh Water Glaciers (Frozen)76% Groundwater22%
INTRODUCTION Mark Heggli, Meteorologist/Hydrologist Expert Real-time Hydrology Information Systems Innovative Hydrology, Inc. Consultant to the World Bank.
Design Guidance for Low-water Crossing in Gravel Rivers Xing Fang Lamar University.
Relative Velocity. Example 1 A man is trying to cross a river that flows due W with a strong current. If the man starts on the N bank, how should he head.
Design of meteorological data networks Dr. Anil Kumar Lohani National Institute of Hydrology, Roorkee India Hydro-Met Network Design Workshop, April 6-11,
This training was prepared by the U.S. Department of Agriculture (USDA) team of Otto Gonzalez-USDA Foreign Agricultural Service (Team Leader), Jon Fripp.
Aims today: To learn about: Channel Efficiency The Hydraulic Radius
Why use Index-Velocity Methods? Traditional Sites – Stage vs Discharge is predictable.
Lesson Understanding Soil Drainage Systems. Interest Approach Ask students the question, “What determines how fast water will flow through a funnel?”
Basic Hydraulics: Rating curve. Definition & terminology Rating curve, also known as stage–discharge curve, is a graph showing the relation between the.
Think about answering the questions: Who? What? Where? When? Why? How? Before your volunteers begin collecting data.
Mark Heggli Innovative Hydrology, Inc. Consultant to the World Bank Expert Real-time Hydrology Information Systems Module 12: Assuming Management of an.
What is the Bradshaw model?
Mark Heggli, Meteorologist/Hydrologist Expert Real-time Hydrology Information Systems Innovative Hydrology, Inc. Consultant to the World Bank HP-II Workshop.
Bridges Reach analysis Fundamental tool for design
Surface Water Movement
Relative Velocity.
Data Management Solutions for a Modernized HIS
Basic Hydrology & Hydraulics: DES 601
Hydrological Information System
HP-II Workshop on Real-time Hydrological Information Systems
Summary In addition to the oceans, where else is water found on Earth?
Surface Water Chapter 9.
Section 1: Surface Water Movement
6.1 BASIC ENGINEERING New ‘modernised’ diversion structures have promoted larger inequity in the distribution of irrigation water between upstream and.
Integrated River Basin Management Tools and methods for IRBM Monitoring, Acquisition and processing of Water Resource Data.
HP-II Workshop on Real-time Hydrological Information Systems
PAPER 3: Geographical Applications
Sediment Transport in Some Eastern United States Streams
Floods and Flood Routing
HEC-RAS US Army Corps of Engineers Hydrologic Engineering Center
Longitudinal Profile Survey for Successful Culvert Replacement
In-Stream Structures & Grade Control
Introduction: Real-time Hydrology Information System
Introduction: Real-time Hydrology Information System
Presentation transcript:

Site Selection and Security Considerations Mark Heggli Innovative Hydrology, Inc. Consultant To The World Bank Expert Real-Time Hydrology Information Systems

Examples that refer to products are intended for illustrative purposes only, and do not imply an endorsement or recommendation of any particular product

Site Selection and Security Consideration  Site selection Define the Site Purpose Site Survey/ Field Visit  Security considerations for all sites

Site Selection: Define The Site Purpose  Establish the purpose of the site What are you trying to measure? ○ Water Level ○ Discharge ○ Water Temperature ○ Water Quality ○ Rainfall ○ Other How crucial is the data? ○ Logging needs ○ Frequency of Data Collection  Consideration of future needs Additional sensors, additional telemetry

Site Selection: Site Survey/Field Visit  Why is it important to complete a site survey? Ease and safe accessibility Understand the characteristics of the area being measured ○ Understanding the characteristics will help in the decision making of proper equipment to make accurate measurements ○ A mismatch between local conditions and appropriate technology can result in: Poor quality of data High maintenance requirements for both field and office procedures

Site Survey/Field Visit: Accessibility and Safety  Safe access to site Road to Drive Walking Path Boat Aircraft  Minimization of risk during install, ongoing operation and maintenance Personnel, sub-contractors, public

Site Survey/Field Visit: Water Level and Discharge Sites  Stream characteristics Control Upstream and downstream considerations Contained and subterranean flow Streambed and banks Gauging sections

Stream Characteristics: Control  What to look for in a control? Control needs to be stable and sensitive Minimum change in discharge with minimum change in stage Cease to flow point should not be affected by sedimentation or weed growth Try to find a site with an existing natural control  Types of Control Natural control Man made control

Stream Characteristics: Upstream and Downstream Considerations  Straight section of stream According to the WMO, the general course of the stream is straight for about 10 times the stream width, upstream and downstream from the gauge site if the control is a river reach (channel control). Approach velocities are evenly distributed Minimize possibility of sedimentation fill  Downstream Effects Evaluate downstream effects ( tidal effects, water shortages, future civil works/dams)

Stream Characteristics: Contained and Subterranean Flow  Contained Flow Section needs to contain all flow including maximum flood flow No possibility of over bank or side channel flow  Subterranean Flow Evaluation should include possibility of subterranean upstream, causing bypassing of flow (prevalent in underground mining areas)

Stream Characteristics: Stable Stream Bed and Banks  Stable Stream Bed Minimal infill or scour  Stable Stream Banks Avoid locations with bank scour or erosion

Stream Characteristics: Gauging Sections  Gauging Sections Feasibility ○ Low flow wading ○ Boat measurement ○ Unmanned cableways

Rainfall Site Selection  Obstruction  Wind  Slopes  Height of gauge Wind velocities increase with height High enough to prevent splashing from the ground 1 m is standard according to WMO

Site Selection: Location of Instrumentation  Power AC DC- Generator or Battery Solar needs a clear access to sunlight  Telemetry Landline GPRS/GSM Coverage Radio Link Satellite Access  Housing of Equipment Location of instrumentation must be above maximum flood

Security Considerations  All Sites Locks Fencing Disguise

Suggestions  Rarely will an ideal site be found for a gauging station Judgment must be exercised in choosing between adequate sites, each of which may have some shortcomings  Often adverse conditions may exist at all possible sites for installing a required gauging station and a poor site must be accepted For example, all streams in a given region may have unstable beds and banks, which result in continually changing stage-discharge relations

QUIZ What is wrong with this location for a precipitation gauge?

QUIZ Is this a good location for a gauging site?

QUIZ a. High maintenance requirements c. Good equipment can fix poor choice in location d. Poor quality of data  Poor choice in site selection can result in what?

Thank You