Study of a new high power spallation target concept

Slides:



Advertisements
Similar presentations
Mike Fitton Engineering Analysis Group Design and Computational Fluid Dynamic analysis of the T2K Target Neutrino Beams and Instrumentation 6th September.
Advertisements

PAUL SCHERRER INSTITUT HPTW Malmö Cannelloni Technical Issues K. Thomsen.
Michael Butzek, Jörg Wolters, Bernhard Laatsch Mitglied der Helmholtz-Gemeinschaft Proton beam window for High Power Target Application 4th.
R.Valbuena NBI March 2002 CNGS Decay Pipe Entrance Window Structural and Thermal Analysis A.Benechet, P.Cupial, R.Valbuena CERN-EST-ME.
Studies of solid high-power targets Goran Skoro University of Sheffield HPT Meeting May 01 – 02, 2008 Oxford, UK.
First Wall Thermal Hydraulics Analysis El-Sayed Mogahed Fusion Technology Institute The University of Wisconsin With input from S. Malang, M. Sawan, I.
Status of T2K Target 2 nd Oxford-Princeton High-Power Target Workshop 6-7 th November 2008 Mike Fitton RAL.
May 17-19, 2000 Catalina Island, CA Neutrino Factory and Muon Collider Collaboration Meeting 1 Target Support Facility for a Solid Target Neutrino Production.
Thermal Analysis of Helium- Cooled T-tube Divertor S. Shin, S. I. Abdel-Khalik, and M. Yoda ARIES Meeting, Madison (June 14-15, 2005) G. W. Woodruff School.
 Stephen Brooks / UKNF meeting, Warwick, April 2008 Pion Production from Water-Cooled Targets.
The JPARC Neutrino Target
Rotating Tungsten Helium cooled Target RoTHeTa Cyril Kharoua Daniela Ene, Ferenc Mezei, Etam Noah, François Plewinski, Pascal Sabbagh, Luca Massidda (CRS4,
Solid Target Options NuFACT’00 S. Childress Solid Target Options The choice of a primary beam target for the neutrino factory, with beam power of
M. Yoda, S. I. Abdel-Khalik, D. L. Sadowski and M. D. Hageman Woodruff School of Mechanical Engineering Extrapolating Experimental Results for Model Divertor.
TED Thermomechanical Analyses Esposito Raffaele EN-STI-TCD.
2009 Linear Collider Workshop of the Americas Amann - 10/01/09 Global Design Effort 1 Status Update 18MW ILC Beam Dump Design John Amann Mechanical Engineer.
LCWS 2010 Amann - 3/26/10 Global Design Effort 1 Status Update 18MW ILC Beam Dump Design John Amann Mechanical Engineer SLAC National Accelerator Laboratory.
FETS-HIPSTER (Front End Test Stand – High Intensity Proton Source for Testing Effects of Radiation) Proposal for a new high-intensity proton irradiation.
ISIS Second Target Station
Proton Accelerators for Science and Innovation Workshop at Fermilab
Neutrino Factory Mercury Vessel: Initial Cooling Calculations V. Graves Target Studies Nov 15, 2012.
Introduction and Charge to the Review of ESS Target building and Instrument Hall design requirements Roland Garoby November 2014, Lund
High-Power Density Target Design and Analyses for Accelerator Production of Isotopes W. David Pointer Argonne National Laboratory Nuclear Engineering Division.
M. Yoda, S. I. Abdel-Khalik, D. L. Sadowski, B. H. Mills, and J. D. Rader G. W. Woodruff School of Mechanical Engineering Updated Thermal Performance of.
1 cm diameter tungsten target Goran Skoro University of Sheffield.
Horn design for the CERN to Fréjus neutrino Super Beam Nikolas Vassilopoulos IPHC/CNRS.
Completion of Water-Cooled Backup Study Eric Pitcher TAC-10 November 5, 2014.
Positron Source General Update M. Kuriki(Hiroshima U./KEK) ALCW2015, April 2015,Tsukuba/Tokyo, Japan.
The Materials Test Station Eric Pitcher Los Alamos National Laboratory Presentation to: AHIPA Workshop, Fermilab October 19, 2009.
Consideration of Baffle cooling scheme
PSB dump: proposal of a new design EN – STI technical meeting on Booster dumps Friday 11 May 2012 BE Auditorium Prevessin Alba SARRIÓ MARTÍNEZ.
F. Regis, LINAC4 – LBS & LBE LINES DUMP DESIGN.
Solid Targets for Neutron Spallation Sources Eric Pitcher Los Alamos National Laboratory Presented to: AHIPA Workshop October 20, 2009.
Investigation of a “Pencil Shaped” Solid Target Peter Loveridge, Mike Fitton, Ottone Caretta High Power Targets Group Rutherford Appleton Laboratory, UK.
Beam Instrumentation in Monolith Stephen Molloy PBI Taskforce Leader.
Superbeam target work at RAL Work by: Ottone Caretta, Tristan Davenne, Peter Loveridge, Chris Densham, Mike Fitton, Matt Rooney (RAL) EURONu collaborators:
SPL-SB and NF Beam Window Studies Stress Analysis Matt Rooney, Tristan Davenne, Chris Densham March 2010.
Mitglied der Helmholtz-Gemeinschaft Jörg Wolters, Michael Butzek Focused Cross Flow LBE Target for ESS 4th HPTW, Malmö, 3 May 2011.
GRAN SASSO’S HADRON STOP Temperature’s behaviour under specified beam conditions Barbara Calcagno.
M. Yoda, S. I. Abdel-Khalik, D. L. Sadowski, B. H. Mills and M. D. Hageman G. W. Woodruff School of Mechanical Engineering Correlations for Divertor Thermal-Hydraulic.
3 May th High Power Targetry Workshop - Malmö1/25 Free Surface and Splashing Simulation of a Windowless Target Concept for ESS Luca Massidda, Vincent.
BENE/EURISOL-DS Joint Meeting, CERN, SwitzerlandFebruary 22, Progress in the Liquid Mercury Multi-MW Target Design Studies Y. Kadi On behalf of.
Beam on Target Diagnostics Beam on Target Meeting 2013 March Tom Shea.
CDR2 – Coupler Mechanical Design NICOLAS MISIARA.
Task2: Liquid Metal Target Thermo hydraulic and structural analysis of the Eurisol liquid metal target Ashrafi-Nik M. * C.E.R.N, AB Department, ATB Group.
Packed Bed Target Design Concept (for EURONu) Tristan Davenne, Ottone Caretta, Peter Loveridge, Chris Densham (RAL); Andrea Longhin, Marco Zito (CEA Saclay)
Engineering studies for CN2PY secondary beam. LAGUNA-LBNO General Helsinki, 26/08/20141 F. Sanchez Galan (CERN) on behalf of the CERN Secondary.
Paul Scherrer Institut 5232 Villigen PSI EURISOL Town Meeting Pisa, March 30-April 2, 2009 / W. Wagner PAUL SCHERRER INSTITUT EURISOL Spallation Neutron.
Design for a 2 MW graphite target for a neutrino beam Jim Hylen Accelerator Physics and Technology Workshop for Project X November 12-13, 2007.
Materials – Status Report TAC-10 Yongjoong Lee Group Leader – Materials Target Division November 5, 2014.
Spoke section of the ESS linac: - the Spoke cryomodules - the cryogenic distribution system P. DUTHIL (CNRS-IN2P3 IPN Orsay / Division Accélérateurs) on.
The ESS Target Station Eric Pitcher Head of Target Division February 19, 2016.
Design and Optimisation of the ISIS TS1 Upgrade Target Dan Wilcox High Power Targets Group, RAL 6 th High Power Targetry Workshop, 12/04/2016.
The ESS Target Station F. Mezei ESS target division NPPatLPS, 2013.
THERMO-MECHANICAL DESIGN | PAGE 1 CEA Saclay 2015.
Irradiated T2K Ti alloy materials test plans
New nTOF target: Design Issues
ISIS TS1 Project: Target Design and Analysis
n_TOF Target HiRadMat Experiment Proposal (1704)
P. Sievers/CERN. A. Ushakov/Univ. Hamburg. S. Riemann/DESY-Zeuthen.
Tungsten Powder Test at HiRadMat Scientific Motivation
Beam Window Studies for Superbeams
STUDIES TOWARDS TARGET-HORN INTEGRATION Institute of Applied Mechanics
1- Short pulse neutron source
Neutron Detector Systems at ESS
EUROnu Beam Window Studies Stress and Cooling Analysis
Superbeam Horn-Target Integration
ESS Per Nilsson CFD Specialist
Status of AA3, AA1 and AA2 (In order of maturity)
SPL-SB and NF Beam Window Studies Stress Analysis
Presentation transcript:

Study of a new high power spallation target concept Yongjoong Lee ESS, Materials, Target Division 5th High Power Targetry Workshop May 20, 2014

Spallation Target at ESS 5 MW spallation source 5 MW (2.0 GeV/2.5 mA) proton beam 2.86 ms long beam pulse with 14 Hz repetition rate Rotating tungsten target: Helium cooled target with water cooled backup

Motivation Looking for a target concept that is based on simple design, with small number of standard type tungsten blocks in large dimensions. Looking for a target concept that is based on simple cooling flow patterns such that CFD simulations have better predictability. Demonstration of technical feasibility of a new target concept that is readily adaptable both for helium cooled and water cooled options.

Target configuration used for this study Five 40 cm long horizontal tungsten slabs with equal thickness 16 mm.

Beam power deposition TDR Baseline (2013): 5 MW (2.5 GeV/2.0 mA) double Gaussian beam with peak current density 53 uA/cm2 Target volume Deposited power [kW] Target I 820 Target II 1374 Target III 594 Total 2788

Flow analysis Helium cooled option Water cooled option 3 kg/s mass flow rate 3 bar operation pressure Total 363 tungsten slabs Water cooled option 99 kg/s mass flow rate 6 bar operation pressure Total 264 tungsten slabs

CFD: Transient helium flow analysis Helium Cooled Target Target Volume Max Temperature Pre-pulse Max Temperature Post-pulse Temperature Amplitude Target I 728.5 K 813.9 K 85.4 K Target II 736.0 K 818.8 K 82.8 K Target III 432.8 K 450.9 K 18.1 K Pressure Drop 97.0 kPa: Surface and time averaged

CFD: Transient water flow analysis Water Cooled Target Target Volume Max Temperature Pre-pulse Max Temp: Post-pulse (Bulk/Surface) Temperature Amplitude Target I 326.1 K 429.7 K/393.6 K 103.6 K Target II 334.3 K 428.9 K/402.3 K 94.6 K Target III 310.0 K 329.4 K/324.8 K 19.4K Pressure Drop 35.3 kPa: Surface and time averaged

Stress analysis: Helium cooled target Target Volume Max Principal Stress Pre-pulse Max Principal Stress Post-pulse Stress Amplitude Target I 168 MPa 194 MPa 26 MPa Target II 116 MPa 152 MPa 36 MPa

Stress analysis: Water cooled target Target Volume Max Principal Stress Pre-pulse Max Principal Stress Post-pulse Stress Amplitude Target I 23 MPa 113 MPa 90 MPa Target II 26 MPa 115 MPa 89 MPa

Dose rate calculated by FLUKA in kW Decay heat analysis Irradiation history: 5 years operation with 5000 hours per year beam on target at 5 MW Benchmark (MCNPX): 41.5 kW in bare W at time zero Dose rate calculated by FLUKA in kW Cooling time [s] 3600 7200 14400 28800 86400 He-cooled Naked W 32.7 20.0 18.6 16.9 14.7 9.9 He-cooled 0.5 mm Ta-clad W 39.3 25.9 24.3 22.7 20.7 16.1 H2O-cooled 0.5 mm Ta-clad W 42.9 29.4 27.9 26.2 24.2 19.6 D2O-cooled 0.5 mm Ta-clad W 39.9 26.6 25.0 23.4 21.4 16.8

Decay heat analysis: Thermal equilibrium Assumptions: Normalization factor in decay heat to make it total 47 kW Loss of coolant in the target and the monolith, with air ingression Simple tungsten disc surrounded by monolith shielding blocks with 2 cm air gap between them.

Decay heat analysis: Temperatures at thermal equilibrium Coolant Decay Heat at time zero Decay heat at thermal equilibrium Time to reach thermal equilibrium Max. temperature at thermal equilibrium Helium 47 kW 37 kW 40 min 912 K Water 62 kW 38 kW 270 min 928 K

Exothermic heat analysis Tungsten and tantalum oxidation: exothermic process W + O2 -> WO2, dH = -589.7 kJ/W-mol W + 1.5*O2 -> WO3, dH = -842.9 kJ/W-mol Ta + 1.25*O2 -> 0.5*Ta2O5, dH = -1023.0 kJ/W-mol Literature survey on tungsten and tantalum oxidation in air led to the estimation that the exothermic heat generated on the target surface will reach 10 kW at 800 C.

Thermomechanical properties under flat proton beam profile New accelerator baseline at ESS: Rastered beam scanning a rectangular surface on beam window: dx = 140 mm, dy = 32 mm Beam parameters changed from 2.5 GeV/2.0 mA to 2.0 GeV/2.5 mA, giving the peak current density on target 55.8 uA/cm2

Evolution of target configuration – V2 Minimizing tungsten volume: No visible neutronic penalty by reducing the W slab length from 40 cm to 30 cm and the W slab total thickness from 80 mm to 70 mm Reduced W slab size reduces decay heat in W by more than 10 %. Optimizing temperature and stress configurations in W volume. No through going proton beam shall be allowed!

CFD: Transient flow analysis – V2 Helium Cooled Target: 3 kg/s @ 6 bar Target Volume Max Temperature Pre-pulse Max Temperature Post-pulse Temperature Amplitude Target I 697.30 753.47 56.17 Target II 714.59 800.82 86.23 Pressure Drop 49 kPa: Surface and time averaged Water Cooled Target: 99 kg/s @ 6 bar Target Volume Max Temperature Pre-pulse Max Temp: Post-pulse Temperature Amplitude Target I 320.11 K 411.76 K 91.65 K Target II 320.31 K 417.21 K 96.90 K Pressure Drop 34 kPa: Surface and time averaged

Stress analysis: Helium and water cooled targets –V2 Helium Cooled Target Target Volume Max von-Mises Stress Pre-pulse Max von-Mises Stress Post-pulse Stress Amplitude Target I 99 MPa 93 MPa -6 Mpa (30 Mpa) Target II 68 MPa 125 MPa 57 Mpa (60 Mpa) Water Cooled Target Target Volume Max von-Mises Stress Pre-pulse Max von-Mises Stress Post-pulse Stress Amplitude Target I 10 MPa 70 MPa 60 MPa Target II 12 MPa 104 MPa 92 MPa

Thermal and mechanical analysis: Beam entrance window Each of the 33 sectors could be considered as an 150 kW spallation target. Maximum Temperatures in Beam Window Pre-pulse Post-pulse Temp. Amplitude Helium Cooled Target 457.87 K 485.71 K 27.84 K Water Cooled Target 321.63 K 351.49 K 29.86 K Maximum Stresses in Beam Window Pre-pulse Post-pulse Stress Amplitude Helium Cooled Target 210 MPa 280 MPa 70 MPa Water Cooled Target 123 MPa 153 MPa 30 MPa

Max. Post-pulse tensile stress Conclusions The feasibility of the target concept based on sectorized horizontal slabs is demonstrated, both for helium cooled and water cooled options at 5 MW proton beam power. Coolant Number of W slabs Max. Post-pulse temp. Max. Post-pulse tensile stress Max. temp. at LOCA Helium 3 kg/s @ 6 bar 495 bare W blocks 801 K (528 C) 125 MPa < 639 C Water 99 kg/s @ 6 bar 495 Ta clad W blocks 417 K (144 C) 104 MPa < 655 C The exothermic heat generated from the oxidation of tungsten and tantalum could reach 10 kW at high temperatures above 700 C. There are relatively small number of tungsten blocks in three standardized shapes. The post pulse peak equivalent stress in the beam window is below 300 MPa both for helium cooled and water cooled options.

Outlook Next steps: Thermal and mechanical optimization Target vessel optimization Analysis of non-axisymmetric flux distribution Analysis of dynamic effects of the beam rastering Down to earth engineering and prototyping Special thanks to Eric Pitcher, Per Nilsson and Thomas McManamy

Thank you for your comments and feedback! Open discussions Thank you for your comments and feedback!