Operating Transfer Capability Policy Committee Report Board of Directors Meeting April 21 & 23, 2004 Thomas A. Delawder OTCPC Chair Western Electricity.

Slides:



Advertisements
Similar presentations
2004 NERC, NPCC & New England Compliance Programs John Norden Manager, Operations Training, Documentation & Compliance August 31, 2003 RC Meeting.
Advertisements

Historical Hydro-Quebec Phase II Flow and Transfer Capability Limit Data Peter Wong, ISO New England Power Supply Planning Committee Meeting June 4, 2007.
NERC Policies Introduction
WECC Board of Directors April 21-23, 2004 Seattle, Washington WECC Procedure for Reporting of System Events Disturbance Reports Rod Maslowski OC Vice Chairperson.
WECC/TEPPC Response to DOE Funding Opportunity Status Update June 29, 2009 Bradley Nickell Renewable Integration and Planning Director.
Report of the Planning Coordination Committee WECC Board Meeting Albuquerque, NM December, 2007.
1 Sunrise Powerlink and Southwest Powerlink Reliability Performance Evaluation Double Line Outage Probability Analysis March 6, 2008.
1 Report of the Planning Coordination Committee Report to the WECC Annual Meeting April 20, 2006 Robert Jenkins, PCC Chair.
Remedial Action Scheme Reliability Subcommittee, RASRS WECC Operating Committee June 18-19, Gene Henneberg.
WECC - Addressing Commercial Practices Ed Beck Chair, Market Interface Committee.
The Western Electricity Coordinating Council Operating Transfer Capability Policy Committee Richard Ferreira April 30, 2009.
The Western Interconnection Synchrophasor Program (WISP ) Update Vickie VanZandt Joint Synchronized Information Subcommittee Salt Lake City August 10,
1 Report of the Planning Coordination Committee WECC Board of Directors Meeting April 21, 2006 San Diego, CA.
Report of the Planning Coordination Committee December 2006 WECC BOD Meeting Cabo Del Sol, Los Cabos.
1 Western Interconnection 2006 Congestion Assessment Study Prepared by the Western Congestion Analysis Task Force May 08, 2006.
Brenda Ambrosi Interchange Scheduling and Accounting Subcommittee Chair ISAS Presentation to the OC October 2013 Salt Lake City, UT.
THE HISTORY OF THE PACI AND PDCI
Composite Load Model Implementation Update Craig Quist, PacifiCorp January 23-25, 2013 TSS Meeting.
WECC TEPPC – March 25, 2010 Proposed Revisions to PCC Regional Planning Document 1 Proposed Revisions to Overview of Policies and Procedures for Regional.
Report of the Planning Coordination Committee WECC Board Meeting San Diego, CA April, 2009.
About the Operating Committee JGC Leadership Training Salt Lake City, UT May 15, 2008 Don Watkins – OC Chair (plus others)
WECC MIC Meeting Report on Operating Transfer Capability Policy Committee (OTCPC) Vancouver, BC October 24 & 25, 2007.
ACE Diversity Interchange (ADI)
California Transmission Planning Group Presentation to: WECC Transmission Expansion Planning Policy Committee June 16-17, 2010 TANC.
Ad Hoc Bulk Electric System Task Force Update RPIC February 19, 2009.
1 Bradley Nickell Director of Transmission Planning 10-Year Regional Transmission Plan WECC Overview September 2011.
Presentation to State Water Resources Control Board November 14, 2012 By Dave Modisette Executive Director California Municipal Utilities Association.
Reliability Subcommittee Report Vishal C. Patel Chair – Reliability Subcommittee March 2014.
Jerry Rust Chair - Underfrequency Load Shedding Criterion Team
RPEWG Present and Future Activities Boise, August 17, 2011 RPEWG Meeting 1.
Brett Wangen WECC RC WECC Winter 2011/2012 SOLs MIC Meeting - October 14, 2011.
Western Electricity Coordinating Council 1 WECC MIC Meeting Report on Operating Transfer Capability Policy Committee (OTCPC) Spokane June 26 & 27, 2008.
Western Electricity Coordinating Council 1 WECC MIC Meeting Report on Operating Transfer Capability Policy Committee (OTCPC) Marina Del Ray October 30.
Western Electricity Coordinating Council 1 WECC MIC Meeting Report on Operating Transfer Capability Policy Committee (OTCPC) Albuquerque March 6 & 7, 2008.
TransWest Express and Gateway South WECC Planning Coordination Committee David Smith, National Grid October 25-26, 2007 Vancouver, B.C.
North American Electric Reliability Council 1 Coordinate Operations Standard Jason Shaver Standard Drafting Team Chair September 29, 2005.
ColumbiaGrid Planning Update to PCC Marv Landauer October 7, 2014.
Review of BPA Voltage Control Conference
Stability analysis on WECC Systems with Wind Penetration and Composite Load Model Hyungdon Joo and Melissa Yuan Mentor Yidan Lu Professor Kevin Tomsovic.
Energy Gateway Gateway West Project Gateway South Project
FFSC Annual Meeting -- 1 Technical Committee Report  Three issues: Accounting for hedging transactions Update of Section IV Pending Changes to the Financial.
ISO Outlook Summer 2005 and Beyond Senate Energy, Utilities and Communications Committee February 22, 2005 Jim Detmers Vice President of Grid Operations.
The Western Interconnection The West has only one RTO/ISO, the California Independent System Operator, the most costly RTO in the US at $229.2 million.
Current Export Initiatives Jerry Mossing Exports Workshop February, 16,2006, Metropolitan Center, Calgary.
Out of Region Market Assumption Resource Adequacy Technical Committee December 1, 2011.
2015 IEPR Lead Commissioner Workshop Southern California Reliability University of California, Irvine August 17, 2015 Tom Doughty Director, State Regulatory.
Thomas Carr Western Interstate Energy Board ColumbiaGrid Planning Meeting August 1, 2013 Grid Tracker: A web-based tool to analyze historic transmission.
Renewable Energy Transmission Initiative 2.0 Plenary Group Meeting April 18, 2016 Sacramento, CA Thomas Carr Western Interstate Energy Board TEPPC’s Resource.
BPA Pacific DC Intertie (PDCI) Upgrade Project WECC Path Rating Process PDCI 3220 MW North to South Phase 1 Kick-off Meeting October 23, :00-4:00.
Northwest Coal Retirement Reduction Study Development of Base Case Assumptions and Scenarios PNUCC Meeting October 15,
Biennial Transmission Plan Studies Update - DRAFT April 6, 2011.
Northern Tier Transmission Group Report to Columbia Grid Planning Committee February 9, 2012 “To ensure efficient, effective, coordinated use & expansion.
Slide 1 B O N N E V I L L E P O W E R A D M I N I S T R A T I O N BPA Network Open Season 2013 Cluster Study ColumbiaGrid Planning Meeting May 2, 2013.
Kenneth Silver Los Angeles Department of Water & Power
Interchange Scheduling & Accounting Subcommittee
Kenneth Silver Los Angeles Department of Water & Power
Columbia Grid Wind Integration Study Team Dynamic Transfer Capability Studies Update 9/10/09.
Progress Report for the May 26th 17:31 Event
Proposal to Remove from Service the PV-COI RAS
Western Electricity Coordinating Council
Eleanor Ewry Base Case Coordination Subgroup Chair
Updates to the Path Rating Process for Approval by the PCC
Reliability Assessment Committee Reliability Workshop Priorities
Reliability Assessment Committee Reliability Workshop Priorities
Palo Verde-COI RAS Retirement
Proposal to Remove from Service the PV-COI RAS
Palo Verde-COI RAS Retirement
MAC Report Gas-Electric Interface Study
ColumbiaGrid Planning Update to PCC Marv Landauer October 7, 2014
NERC Planning Committee Update
Presentation transcript:

Operating Transfer Capability Policy Committee Report Board of Directors Meeting April 21 & 23, 2004 Thomas A. Delawder OTCPC Chair Western Electricity Coordinating Council

Approved Summer Study Plans The 2004 study plans were approved, as modified, for all four subregions. PDCI Update Planned outages and curtailment of the Pacific DC Intertie for converter valve replacement. Path 15 construction may impact deliveries to southern California from time to time. Operating Transfer Capability Policy Committee

Criteria to use Shunt Capacitors with Local Voltage Control for Imports into Southern California Study assumptions being re-evaluated due to the August 14, 2003 Eastern Interconnection disturbance. Insertion of shunt capacitors with a local voltage control scheme in southern California. Approved SCIT study committees recommendation of 12,800 MW. Previous limit was 14,500 MW. Further studies are being conducted to evaluate the ability to insert the remaining shunt capacitors. Operating Transfer Capability Policy Committee

Approved Spring Study Results and Recommended Spring OTC Limits Arizona – New Mexico Subregion COI-PV under frequency load drop arming scheme has been implemented. Actions are underway to implement the direct load tripping scheme. Palo Verde owners thanked the California ISO and BPA for study efforts to support resolution of the COI-PV interaction. Operating Transfer Capability Policy Committee

Northwest Subregion The subregion studied the NW – Montana path due to the availability of a thermal limiter that was not available last year. Rocky Mountain Subregion No studies were conducted and last summers OTC limits will be used for spring OTC limits. California – Mexico Subregion Approved the spring study results which included the SCIT OTC change. Operating Transfer Capability Policy Committee

Operating Practices Review Group Report Spring operating procedures were accepted. Operating procedures for the winter 2003/2004 season were implemented. New OTCPC Members Board Approval Item Two members from the board/executive level terms are up (Maude Grantham-Richards and Tom Delawder). Vickie Van Zandt – BPA and Dick Ferreira – TANC recommended as replacements. Vickie Van Zandt recommended for chair of the OTCPC. Operating Transfer Capability Policy Committee

Other New Members Planning Coordination Committee replacement Operating Committee replacement Future OTCPC Meetings The remaining 2004 meetings are as follows: April 28 and 29 (San Diego) – Meeting to approve the summer 2004 OTC limits and the winter 2004/2005 study plans. September 14 (Colorado Springs) – Meeting to approve the winter 2004/2005 OTC limits and the spring 2006 study plans. Operating Transfer Capability Policy Committee

Thanks for the memories!