WISP RFI for Applications response summary

Slides:



Advertisements
Similar presentations
North American Energy Standards Board Standards Development for Demand Side Management / Energy Efficiency September 30, 2009 Eric Winkler, Ph.D. Project.
Advertisements

Briefing on California ISO Dynamic Transfers Stakeholder Process For WECC Seams Issues Subcommittee Meeting May 4, 2010 Jim Price, Lead Engineering Specialist.
The Western Interconnection Synchrophasor Program (WISP ) Update Vickie VanZandt Joint Synchronized Information Subcommittee Salt Lake City August 10,
WESTERN ELECTRICITY COORDINATING COUNCIL OPERATIONS COMMITTEE June 18, 2009 Salt Lake City, UT Base Case Coordination System (BCCS) Request For Information.
Model Validation in Western Interconnection
Joint Synchronized Information Subcommittee JSIS.
1 NERC Update WECC OC Meeting June 19, Two Items Variable Generation Reliability Reports.
Reliability Subcommittee Report Vishal C. Patel Chair – Reliability Subcommittee March 2014.
Roadmap for Sourcing Decision Review Board (DRB)
Using Synchrophasors for Preventing Cascading Outages
OC Chair Items Don Watkins June 18-19, 2009 Operating Committee.
Introduction Build and impact metric data provided by the SGIG recipients convey the type and extent of technology deployment, as well as its effect on.
State of Indiana Business One Stop (BOS) Program Roadmap Updated June 6, 2013 RFI ATTACHMENT D.
DETAILED DESIGN, IMPLEMENTATIONA AND TESTING Instructor: Dr. Hany H. Ammar Dept. of Computer Science and Electrical Engineering, WVU.
Easy DCR Development Control Regulation Online Building Permission System.
Marianna Vaiman, V&R Energy
Idaho Power Update JSIS Meeting March 3, Infrastructure PMU installations: 24 PMU sites: 15 WISP PMU Installations: 5 WISP PMU sites: 3 WISP installations.
© ABB Power Technologies Messaging Standards Collaboration - Next Steps Network Management Anders Bjorkman Director of Technology.
and Trend for Smart Grid
Chapter 2 The Analyst As Project Manager In Managing Information Systems 2.3.
Reliability Software1 Reliability Software Minimum requirements & Best practices Frank Macedo - FERC Technical Conference July 14, 2004.
Introduction to Phasor Measurements Units (PMUs)
Duke Energy Carolinas Smart Grid Investment Grant Tim Bradberry Tim. NASPI Work Group Meeting October 12-13,
Requirements Engineering n Elicit requirements from customer  Information and control needs, product function and behavior, overall product performance,
California Independent System Operator Soumen Ghosh CAISO CONFIDENTIAL Created: 06/15/2008 State Estimator for CA ISO Market - Relevance and Readiness.
A sample Service Oriented Architecture for Integrating Government Lines of Business.
Business Intelligence Dr. Mahdi Esmaeili 1. Technical Infrastructure Evaluation Hardware Network Middleware Database Management Systems Tools and Standards.
CAISO Update JSIS Meeting March, Infrastructure 92 Connected PMUs 64 Substations 7 PDCs reporting (BPA, PG&E, SCE, SDG&E, APS, SRP and NVP) Redundant.
American Transmission Company Smart Grid Investment Grant Update Jim Kleitsch NASPI Work Group Meeting October 12-13,
1 The Effects of Integrating Wind Power on Transmission System Planning, Reliability, and Operations Phase 1 Preliminary Overall Reliability Assessment.
School Technology Solutions, LLC Technology Audits What's in it for you? 4 th Annual SW/WC Technology Conference March 11, 2010 Presenter: Lee Whitcraft.
Synchrophasor Measurement Implementation in ERCOT
© 2011 New York Independent System Operator, Inc. All Rights Reserved. Smart Grid Investment Grant Project Update Jim McNierney Enterprise Architect New.
Requirements Analysis
© New York Independent System Operator, Inc. All Rights Reserved. Michael Swider Manager – Research & Development New York Independent System.
Agenda Teams Responsibilities Timeline Homework and next steps.
Synchrophasor: Implementation,Testing & Operational Experience
FirstEnergy / Jersey Central Power & Light Integrated Distributed Energy Resources (IDER) Joseph Waligorski FirstEnergy Grid-InterOp 2009 Denver, CO November.
Page 0 Eastern Interconnection Phasor Demonstration Enhanced Wide-Area Visibility In the Eastern Interconnection for Reliability Management Transmission.
V&R Energy’s Project under PRSP: Grid Operator’s Monitoring & Control Assistant (GOMCA) Marianna Vaiman, V&R Energy JSIS Meeting.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Gathering Network Requirements Designing and Supporting Computer Networks – Chapter.
1 Application of Synchrophasor Technology To CREZ System CREZ Technical Conference January 26, 2010 Navin Bhatt American Electric Power.
IT Requirements Management Balancing Needs and Expectations.
CASE STUDY Disturbance event comparing PMU and SE voltage angle difference in ERCOT Prakash Shrestha Operations Engineer Advanced Network Application.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Gathering Network Requirements Designing and Supporting Computer Networks – Chapter.
Lead from the front Texas Nodal 1 TPTF Update for TAC March 8, 2007 Trip Doggett.
Dec UtilityAMI OpenHAN TF Requirements Working Group Specification Briefing January 2008.
Page 1 TAC Program and Projects Update March 6, 2003.
Evaluate Phase Pertemuan Matakuliah: A0774/Information Technology Capital Budgeting Tahun: 2009.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N BPA - WISP Project NASPI Work Group Meeting October 12-13, 2011 Scott Lissit – Project Manager,
Onsite Quarterly Meeting SIPP PIPs June 13, 2012 Presenter: Christy Hormann, LMSW, CPHQ Project Leader-PIP Team.
Demand Response Analysis and Control System (DRACS)
Section 4.9 Work Group Members Kris Hafner, Chair, Board Member Rob Kondziolka, MAC Chair Maury Galbraith, WIRAB Shelley Longmuir, Governance Committee.
Imagination at work. Paddy McNabb Senior Engineer January 2016 Grid Stability Applications Wide Area Monitoring System.
Discovery Across Texas: Technology Solutions for Wind Integration in ERCOT Using Synchrophasor Technology for Wind Integration and Event Monitoring in.
2017 WECC JSIS Report March 21, 2017.
ISO-NE Synchrophasor Related Projects
Sample Fit-Gap Kick-off
SCE Utility Update JSIS Meeting March, 2015.
Presented by United Arab Emirates
Peak’s Synchronized Measurements and Advanced Real-time Tools (SMART) Working Group (initiated in Oct-2017) Focus on operationalizing Synchrophasor tools.
NASPI PMU Data Application Classification
1 Stadium Company Network. The Stadium Company Project Is a sports facility management company that manages a stadium. Stadium Company needs to upgrade.
Coordinate Operations Standard
2017 WECC JSIS Report March 21, 2017.
WISP Follow on Reporting.
NASPI PMU Data Application Classification
Selecting a Health Care
M. Kezunovic (P.I.) S. S. Luo D. Ristanovic Texas A&M University
Assigned to the WEQ OASIS and BPS Subcommittees
Presentation transcript:

WISP RFI for Applications response summary 11 respondents ABB Areva Black & Veatch Cooper Power Systems Electric Power Group (EPG) Harris Corporation InStep OSISoft & SISCO SAIC Siemens Space-Time Insight

What and Where Documents: Contacts: Individual responses Application RFI response data Application RFI response summary Contacts: WISP Project Manager for Applications Scott Woodbury, swoodbury@bridgeenergygroup.com WISP Technical Architect Dan Brancaccio, dbrancaccio@bridgeenergygroup.com WECC Lead Applications Architect Kirk Stewart, kstewart@wecc.biz Detailed responses in WISP SharePoint: http://www.wecc.biz/awareness/WISP/Program%20Folders/Program%20Management/Vendor%20Selection/Applications/RFI/

Functional Scope of the Applications RFI Real-time data display for wide area visualization Display options of all PMU and calculated values Frequency and frequency rate of change X/Y 2-dimensional RMS voltage Polar chart of phase angle RMS current (line) X/Y/Z 3-dimensional Phase angle State values of alarms Positive sequence voltage Grid text in rows and columns Positive sequence current Alarm management Calculation and real-time display for wide area visualization Set warning and alarm thresholds or limits Path flow Playback and archive of alarm Reactive capacity/reserves Set alarm prioritization / levels Voltage stability Capture of events based on alarms Oscillation energy Visualization of alarm status in real-time Mode meter Power system performance and post event analysis Percent damping Post event analysis Monitor real-time PMU and calculated data for alarms Power system performance baseline Frequency Power system performance analysis System wide model validation RMS current Generation model validation High voltage DC intertie Load model validation System model verification Export of data in common formats

Overall Response Statistics Respondent Yes Percent of total ABB 90.0 86% Areva 101.5 97% Cooper Power Systems 73.5 70% EPG 102.5 98% InStep 87.0 83% OSIsoft 101.0 96% SAIC Siemens 82.0 78% Space-Time Insight 102.0

Review Objectives Understand the functionality of the synchrophasor applications available on the market Determine the maturity of the synchrophasor application space Understand the level of engineering and testing necessary to meet WISP business requirements Collect info on the functional boundaries of the synchrophasor applications and determine the optimal suite/mix of applications Collect info to establish the optimal architecture for the integration (data, messaging, etc.) of the synchrophasor applications Collect information needed to plan and execute the next steps of the vendor qualification and selection process Identify vendor’s application architecture to support continued planning of WECC IT infrastructure Review vendor approaches to meeting application availability, security, and interoperability requirements

Review Findings The application space for synchrophasor applications is maturing quickly and solutions exist that address the majority of the WISP requirements Strong feasibility of finding a synchrophasor based situational awareness / visualization application that meets the requirements of the WISP program Five (5) of nine (9) responses answered Y to over 95% of the questions Most applications are not fully SOA compliant Refinement of the technical architecture will impact the suite of applications to be selected in the RFP process Refinement of the data architecture will impact the integration requirements Need vendor meetings for further discovery Finalize the technical architecture and integration approach Determine the optimal suite of applications Complete the Statement of Work (SOW) for the Request for Proposal (RFP)

Notes on Questions Question B61: Does the application have functionality to run RMA to locate historical occurrences of patterns? Only two (2) respondents answered yes to this question (OSISoft and InStep) The importance of this functionality should be evaluated for the RFP Question [C4]: Does the application have an API designed to meet the NASPI to Phasor Gateway specification? Four (4) of the respondents had partial responses to this question, but all of them said further information on the design is required by NASPI before it can be included in their commercial offering Siemens appears to be more focused on the NASPI phasor gateway.

Notes on Questions Question [C11]: Is the application designed to handle redundant data streams of IEEE C37.118-2005 streaming data? Of the nine (9) respondents five (5) responded yes to this question Question [C12]: Is the application designed to have availability of 99.999%? The requirements around question C11 and C12 regarding system redundancy and availability should be investigated further for the RFP This response is also dependent on the hardware and operating system used to support the application

Next Steps Schedule vendor demonstrations / meetings Conduct PDC and Apps vendor review meetings together Demo of product capabilities, architecture and integration Interested members of TAC sub-groups may participate Vendors to be invited to these meetings AREVA, EPG, Siemens SEL and Space-Time-Insight Develop the Scope of Work for the RFP Draft the Scope of Work Incorporate input from the Bus. Req. Spec. Review the Scope of Work with the TAC Applications Sub-Group Submit Scope of Work for TAC review Add SOW to the RFP and send to Vendors