© 2009 The Williams Companies, Inc. All rights reserved. ______________ WECC November 12, 2012.

Slides:



Advertisements
Similar presentations
December 1-2, 2004 Energy Day Meetings 1 North American Energy Standards Board Wholesale Gas Quadrant Overview of Gas Day Standards December 2004.
Advertisements

© 2004 Dominion Dominion Proposal January 24, 2005.
NAESB Coordinate Interchange Version 1 Standard Revision 1, Draft 5 August, 2005.
Interchange Distribution Calculator Working Group (IDCWG) Update IDCWG October 12 th, 2011.
NAESB Coordinate Interchange
Business Practices Subcommittee Update February 2, 2010.
NAESB Strawman January 24-25, Problem Statement Enough generators must have fuel to meet peak load New England Cold Snap crisis heightened interest.
WECC Board of Directors April 21-23, 2004 Seattle, Washington WECC Procedure for Reporting of System Events Disturbance Reports Rod Maslowski OC Vice Chairperson.
Definition of Firm Energy and Interruptible Transmission Two Issues Causing Problems for Business in the Western Interconnection.
NAESB Coordinate Interchange Standard, Version 1 / 0
Operating Reserves --- Again A Discussion Primer
North American Energy Standards Board Upadate Presented by Bob Harshbarger.
WECC BAL-STD-002 Workshop February 6, 2008
Western Electricity Coordinating Council Market Interface Committee Report to the WECC Board of Directors December 6-7, 2007 Robert D. Schwermann MIC Chair.
Interchange Authority Recommendations Board of Directors Meeting December 7, 2007.
Intra Hour Tagging/Oasis During System Contingencies The transmission tagging process was initially developed to solve an after the fact accounting issue.
Presented to the WECC MIC June 15, 2007
Gas-Electric Coordination Update JGC Meeting August 23-24, 2012.
FERC Order minute Scheduling.
Course Material Overview of Process Safety Compliance with Standards
NREL Wind Integration Workshop By Electric Power Systems, Inc. June 28-29, 2010.
Tucson Area Reliability Mike Flores Control Area Operations Tucson Electric Power May 2000.
G 200 L 200 ISO NEW ENGLAND T H E P E O P L E B E H I N D N E W E N G L A N D ’ S P O W E R. COLD SNAP Overview of Proposed Options for Winter 2004/2005.
Andy Meyers Interchange Scheduling and Accounting Subcommittee Chair Discussion Item: Use of Emergency eTags January 2015 Salt Lake City, UT.
Nominations and Scheduling Questar Gas Company Annual Account Management Customer Meeting Will Schwarzenbach Director, Gas Supply.
GOP and QSE Relationship Jeff Whitmer Manager, Compliance Assessments Talk with Texas RE June 25, 2012.
ACTION PROPOSAL FOR FLYWHEEL ENERGY TECHNOLOGY Enhance future grid reliability, interoperability, & extreme event protection In 20 years, the flywheel.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 1 Network Operating Committee (NOC) June 12 th, 2014.
Determine Facility Ratings, SOLs and Transfer Capabilities Paul Johnson Chair of the Determine Facility Ratings Standard Drafting Team An Overview of the.
July 15, 2007 Prepared by the North American Energy Standards Board 1 North American Energy Standards Board NARUC Summer Session 2007 NAESB Update to NARUC.
®® QUESTAR GAS Transportation Balancing Susan Davis, Director, Account & Community Relations February 28, 2014 We develop, transport and deliver clean.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N WIAB WECC Interchange Authority Backup BY LOU MIRANDA BONNEVILLE POWER ADMINISTRATION TRANSMISSION.
NERC Congestion Management Congestion Management Option 3 Vendor Meeting Julie Pierce – NERC IDCWG Chair.
WECC Market Interface Committee Update WSPP Spring 2008 Meeting April 8, 2008 Robert D. Schwermann MIC Chair.
2013 Calendar Year Customer Survey Results
NGEIR Technical Conference Presentation May 16, 2006.
OASIS Overview Transmission Customer Forum May 8-9, 2008 Jim Viikinsalo May 8-9, 2008 Jim Viikinsalo.
Peak RCCo Performance Metrics Draft –November 2013.
1 New England Demand Response Resources: Present Observations and Future Challenges Henry Yoshimura Demand Resources Department ISO New England, Inc. Holyoke,
® July 30 th, 2014 Utah PSC Technical Conference.
OSC Meeting April 27, Transmission Cost Allocation Overview.
1 Bilateral Interconnection Agreement Model Presented to HAPUA Working Group 5 (ESI Services), Project 6 By Power Purchase Agreement Division Electricity.
ISO Outlook Summer 2005 and Beyond Senate Energy, Utilities and Communications Committee February 22, 2005 Jim Detmers Vice President of Grid Operations.
IAEC Reliability Webinar Presented by: Regi Goodale and Ethan Hohenadel December 11,
Florida’s Electric Capacity and Fuel Needs Presentation by: James Dean Florida Public Service Commission to the: House Utilities and Telecommunications.
Transmission Outage Process April Purpose In compliance with the Protocols and the Electric Reliability Council of Texas (ERCOT) Operating Guides,
NAESB WHOLESALE ELECTRIC QUADRANT BUSINESS PRACTICES SUBCOMMITTEE ACTIVITIES UPDATE TO JOINT ELECTRIC SCHEDULING SUBCOMMITTEE JANUARY 5, 2012 BY ED SKIBA.
Standards Review Subcommittee Update August 17, 2010.
After-the-Fact Workgroup Update Sheryl Welch ISAS Meeting January 12-13, 2016 Phoenex, AZ.
NAESB GEH Forum Dan Buckner Director of Fuels Origination and Strategic Development.
Market Implications and Considerations for Enhanced Scheduling Flexibility: Facts Observations Problems Solutions February 2016 Greg Lander– President.
Current Nodal OS Design 1.The NMMS database will have an OWNER and an OPERATOR designation for each piece of equipment in the model. The OWNER and OPERATOR.
PRR 503 Coordination of Resources Due to TSP Section Management of Transmission Forced Outage or Maintenance Outages.
©2003 PJM 1 Presentation to: Maryland Public Service Commission May 16, 2003.
ROMANIA NATIONAL NATURAL GAS REGULATORY AUTHORITY Public Service Obligations in Romanian Gas Sector Ligia Medrea General Manager – Authorizing, Licensing,
California Senate Energy, Utilities and Communications Committee Oversight Hearing May 10, 2016 Southern California Edison Colin Cushnie Vice President,
RELIABILITY COORDINATOR TOPICS 2006 FRCC SYSTEM OPERATOR SEMINAR.
Energy Day Strawman Proposal
Transmission Outage Coordination
Grid Integration of Intermittent Resources
Phil O’Donnell, Manager Operations and Planning Audits
Pseudo-tie business procedure
Review of After-the-Fact (ATF) Tagging Criteria Scheduler’s Meeting May 24, 2016 Raymond will ask the audience what their expectations are in regard to.
After-the-Fact Workgroup Update Sheryl Welch
Review of After-the-Fact (ATF) Tagging Criteria Scheduler’s Meeting May 24, 2016 Raymond will ask the audience what their expectations are in regard to.
Phil O’Donnell, Manager Operations and Planning Audits
Two-Tier Firm Curtailment Overview
NERC Congestion Management
WIAB WECC Interchange Authority Backup
Pseudo-tie business procedure
Presentation transcript:

© 2009 The Williams Companies, Inc. All rights reserved. ______________ WECC November 12, 2012

© 2009 The Williams Companies, Inc. All rights reserved. 2 Notices The Gas Industry Standards Board (GISB) set standards with respect to notices back in 1996 Critical and non-critical notices were required to be posted on the Transportation Service Providers (TSP) designated website These notices were also to be provided to affected parties choice of Electronic Notice Delivery mechanism(s) The notices describe the conditions and specific responses required from the affected parties GISB defined 12 notice types covering maintenance, intraday bumping, operational flow orders (OFO) etc.

© 2009 The Williams Companies, Inc. All rights reserved. 3 Notices GISB was replaced by the National Energy Standards Board (NAESB) and Order 587-V expanded the notice categories and the parties to receive critical notices TSP are required to provide critical notices to Balancing Authorities (BA) and/or Reliability Coordinators (RC) and Power Plant Gas Coordinators (PPGC)

© 2009 The Williams Companies, Inc. All rights reserved. 4 Notices - Definitions The PPGC was defined as the entity(ies) having responsibility for natural gas requirements and coordinating deliveries to meet those requirements at natural gas-fired electric generating facility(ies) The BA is the term used to describe the responsible entity that integrates resource plans ahead of time, maintains load- interchange-generation balance within the BA area, and supports interconnection frequency in real time. The RC is the term used to describe the entity that is the highest level of authority who is responsible for the reliable operation of the bulk electric system, has the operating tools, processes and procedures, including the authority, to prevent or mitigate emergency operating situations in both next day analysis and real time operations.

© 2009 The Williams Companies, Inc. All rights reserved. 5 Notices - Definition Critical notices pertain to information on TSP conditions that affect scheduling or adversely affect scheduled gas flow Non-critical notices pertain to general information When notices are sent via the subject line must be in the following order separated by commas: (1) Critical, (2) Notice Type Abbreviation(s), (3) the Notice Effective Date in YYYYMMDD format, (4) the name or abbreviation of the TSP and (5) the TSPs D-U-N-S Number A critical notice from Northwest Pipeline GP would look like Critical,Weather, ,NWP,XXXXXXX This subject line tells the receiver that it is a critical notice related to weather events potentially affecting operations (hurricanes, freeze-offs, etc) effective November 20 th on Northwest Pipelines system

© 2009 The Williams Companies, Inc. All rights reserved. 6 Notices - Definition An example of the notice types are: Capacity Constraint – capacity constraint resulting from situations other than an Operational Flow Order, Curtailment or Force Majeure Capacity Discount – TSPs firm capacity that is being offered at a rate that is below the maximum tariff rate Customer Services Update – general customer service information, e.g. calendars, customer events/presentations, weekend/holiday coverage, availability of invoices, etc. Gas Quality – notice of gas quality issues/warning/information Intraday Bump – notice of bumping scheduled interruptible transportation transactions Maintenance – scheduled repair or maintenance to system/segment facilities or equipment which may impact services Operational Flow Order – order issued to alleviate conditions which threaten or could threaten the safe operations or system integrity of the TSP system or to maintain operations required to provide efficient and reliable firm service

© 2009 The Williams Companies, Inc. All rights reserved. 7 Notices Notices are posted on the TSP designated website and ed at parties request Notices are posted with as much lead time as possible allowing parties to make any necessary changes In most instances a notice must be posted prior to a TSP engaging in a conversation with parties on a one-to-one basis TSP Gas Control departments communicate daily with interconnecting TSP concerning routine day-to-day operations

© 2009 The Williams Companies, Inc. All rights reserved. 8 QUESTIONS?