1 Modeling Work Group WECC - TEPPC Technical Advisory Subcommittee Meeting August 20, 2009 Tom Miller Pacific Gas & Electric Status and Outlook.

Slides:



Advertisements
Similar presentations
Westar Energy Smart Grid
Advertisements

© 2008 Pearson Addison Wesley. All rights reserved Chapter Seven Costs.
WECC/TEPPC Response to DOE Funding Opportunity Status Update June 29, 2009 Bradley Nickell Renewable Integration and Planning Director.
WORKSHOP ON UTILITY WIND INTEGRATION STUDIES: MODELS AND METHODS Panel 6 – Base Load Unit Cycling Costs Gene Danneman P.E. June 24 & 25, 2010.
Briefing on California ISO Dynamic Transfers Stakeholder Process For WECC Seams Issues Subcommittee Meeting May 4, 2010 Jim Price, Lead Engineering Specialist.
1 Data Work Group WECC - TEPPC Technical Advisory Subcommittee Meeting San Francisco, CA November 28, 2007 Jamie Austin PacifiCorp Progress Report: 2007.
Pacific Gas and Electric Company Long Term Procurement Plan Proceeding Renewable Integration Model Results and Model Demonstration October 22, 2010 Workshop.
Planning for a Low-Carbon Future at San Diego Gas & Electric Rob Anderson Director of Resource Planning San Diego Gas & Electric Western Resource Planners.
Renewable Proposals Made at October Board. Proposal 1 Identify analyses needed to inform policy debates Coordinate WECC-wide info/analysis and coordinate.
LRS Report to PCC Wally Gibson, NWPCC Planning Coordination Committee Albuquerque, NM March 6-7, 2008.
1 NERC Update WECC OC Meeting June 19, Two Items Variable Generation Reliability Reports.
Heidi Pacini Staff Engineer Developing a Draft 2011 Study Program March 10, 2010 SWG Conference Call.
Illinois Climate Change Advisory Group (ICCAG) Modeling Sub-group An introduction to ENERGY 2020 April 26, 2007.
1 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt FactorsFactors.
1 Climate Change Policy and Regulatory Jurisdiction James Bushnell UC Energy Institute Comments drawn from Bushnell, Peterman, and Wolfram, Local Solutions.
Demand Resource Operable Capacity Analysis – Assumptions for FCA 5.
System Analysis Advisory Committee Futures, Monte Carlo Simulation, and CB Assumption Cells Michael Schilmoeller Tuesday, September 27, 2011.
1 The Impact of Buy-Down on Sell Up, Unconstraining, and Spiral-Down Edward Kambour, Senior Scientist E. Andrew Boyd, SVP and Senior Scientist Joseph Tama,
Announcements Homework 6 is due on Thursday (Oct 18)
Capacity Planning For Products and Services
NREL Wind Integration Workshop By Electric Power Systems, Inc. June 28-29, 2010.
Integrated Resource Planning: An overview Mark Howells & Bruno Merven Energy Research Centre Energy Research Centre University of Cape Town.
Transparent, Repeatable, Defendable, and Published Generation, Transmission & Nat Gas Network Co-Optimizations
California Roundup: Summary of DR Activity in California John Goodin Lead, Demand Response 2008 National Town Meeting on Demand Response June 3, 2008.
1 CPUC Avoided Cost Workshop Generation Avoided Costs.
0 NERC PC Issues Update WECC PCC Meeting NERC PC Issues Update WECC PCC Meeting John Simpson, Reliant Energy Planning Coordination Committee Spokane, WA.
Study Results Southwest Firmed Resource Option This slide deck contains results from the 2012 TEPPC Study Program related to the Southwest Firmed Resource.
SSG-WI System Model Data Requirements [PART 1] September 5, 2002 Las Vegas, NV.
Perfect Competition.
Model and Relationships 6 M 1 M M M M M M M M M M M M M M M M
Copyright © 2008 Pearson Addison-Wesley. All rights reserved. Chapter 10 A Monetary Intertemporal Model: Money, Prices, and Monetary Policy.
PSSA Preparation.
Essential Cell Biology
ENERGY VALUE. Summary  Operational Value is a primary component in the Net Market Value (NMV) calculation used to rank competing resources in the RPS.
CVP Cost Allocation Public Workshop – January 18, 2013 “PLEXOS Methodology and Assumptions”
Preliminary Analysis of the SEE Future Infrastructure Development Plan and REM Benefits.
2001 South First Street Champaign, Illinois (217) Davis Power Consultants Strategic Location of Renewable Generation Based on Grid Reliability.
National Renewable Energy Laboratory Innovation for Our Energy Future * NREL July 5, 2011 Tradeoffs and Synergies between CSP and PV at High Grid Penetration.
GE Energy Asia Development Bank Wind Energy Grid Integration Workshop: Issues and Challenges for systems with high penetration of Wind Power Nicholas W.
NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy operated by the Alliance for Sustainable.
Reaching the Next Level of the State’s Environmental Policy Goals Panel: Energy Procurement, Infrastructure and Policy: Climate Challenges Beyond 2020.
Base Case Draft – For Comment Rocky Mountain States Sub-Regional Transmission Study December 9, 2003.
NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy operated by the Alliance for Sustainable.
Jenell Katheiser Doug Murray Long Term Study Scenarios and Generation Expansion Update January 22, 2013.
Sixth Northwest Conservation & Electric Power Plan Draft Wholesale Power Price Forecasts Maury Galbraith Northwest Power and Conservation Council Generating.
NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy operated by the Alliance for Sustainable.
1 Pacific Northwest Hydro-Thermal System and RTO West Market Design FERC Market Design Workshop January 23, 2002.
Modeling Working Group Progress Report to TAS TEPPC Quarterly Meeting November 2-5, 2015 Tom Miller- MWG Chair W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Power Association of Northern California Maintaining Grid Reliability In An Uncertain Era May 16, 2011 PG&E Conference Center Jim Mcintosh Director, Executive.
The Role of Energy Storage as a Renewable Integration Solution under a 50% RPS Joint California Energy Commission and California Public Utilities Commission.
October 29, Organizational role of Short-Term Planning and Hydro Duty Scheduling Relationship to other groups in BPA Planning and analysis job.
SPP.org 1. Status Update for Reliability and Economic Assessments Stakeholder Meeting September 16, 2008 Austin, TX.
Monterey Plaza Hotel October 8-10, 2007
SPP.org 1. Final Report: Reliability and Economic Assessments Stakeholder Meeting December 1, 2008 Austin, TX.
Analysis of Demand Response Modeling in GridView Andy Satchwell and Sarah Smith Modeling Work Group December 21, 2015 The work described in this presentation.
Updated 1/28/2011. Renewables Integration Plans and Challenges March 8, 2011 Jay Caspary ·
SPP.org 1. Status Update for Reliability and Economic Assessments Stakeholder Meeting June 20 th, 2008 Austin, TX.
Long Term Study Resource Expansion Process: Study Findings and Lessons Learned Jenell Katheiser Doug Murray RPG May 21, 2013.
California Energy Action Plan December 7, 2004 Energy Report: 2004 and 2005 Overview December 7, 2004.
MWG Meeting March 7, 2016 W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Sixth Northwest Conservation & Electric Power Plan Draft Wholesale Power Price Forecasts Maury Galbraith Generating Resource Advisory Committee Meeting.
Multiscale energy models for designing energy systems with electric vehicles André Pina 16/06/2010.
Economic Planning Study June 23, In this presentation  Major changes from last meeting  Results: 2010, 2014, 2019  Finish analyst  Next steps.
Pan-Canadian Wind Integration Study (PCWIS) Prepared by: GE Energy Consulting, Vaisala , EnerNex, Electranix, Knight Piésold Olga Kucherenko.
WG3 Flexible Generation
Integrated Resource Plan 2016
GENESYS Redevelopment Strawman Proposal
MWG Recommended Hydro Improvement March 7, 2017
MWG Recommended Hydro Improvement March 7, 2017
Jim Mcintosh Director, Executive Operations Advisor California ISO
Presentation transcript:

1 Modeling Work Group WECC - TEPPC Technical Advisory Subcommittee Meeting August 20, 2009 Tom Miller Pacific Gas & Electric Status and Outlook

Todays Topics Inter-Regional Wheeling Cost Modeling Approval Item Hydro Modeling Task Force Update Review of Data-Set Enhancements for 2009 Study Cycle Modeling Needs for 2010 Study Cycle 2

Inter-Regional Wheeling Cost Modeling Approval Item

Background: Variable Wheeling Costs Proposal MWG presented investigative studies results at TAS Meeting May 27th Posted discussion paper and study results Received supporting comments and those opposing now take neutral position MWG recommends implementation of proposed Variable Inter-Regional Transmission Wheeling Cost Modeling 4

Highlights: Inter-regional Wheeling Costs THE PROBLEM: Inter-regional variable wheeling costs are currently modeled as zero cost in the TEPPC data set. From production simulation results performed for the 2008 Study Plan there is concern that Northwest imports into California may have been too high, which zero wheeling costs may have been a contributing factor. ECONOMIC MARGINAL HURDLE RATE: Wheeling costs act as a marginal hurdle rate between regions to mimic economic realities of transporting economy power form region to region or across multiple regions. IMPLEMENTATION: will be performed on the 2019 and 2029 cases currently being prepared for the 2009 Study Cycle MODELING: Inter-regional Wheeling Costs Modeling: PROMOD models 11 pools across WECC Wheeling costs are fully incorporated into PROMODs economic dispatch algorithm 5

Proposed Inter-regional Wheeling Costs Modeling 6 Wheeling rates derived from SSG-WI 2008 Base Case (2% Escalation) Further calibration work is expected as simulations are performed

Motion to Approve Variable Inter-regional Wheeling Costs are expected to improve economic dispatch and resulting power transfers between regions from PROMOD production simulations Questions? Motion: TAS approves implementation of variable inter-regional transmission wheeling costs using the methodology proposed by MWG starting with the 2019 and 2029 cases in the 2009 study program 7

Hydro Modeling Task Force Update

Hydro Generation Modeling Methods Historical Data Peak Shaving – shapes energy to peak loads Constant Generation – good for run of river Proportional Load Following – shapes monthly energy proportional to load Hydro Thermal Coordination – adjusts PLF results so more generation during high prices.

Canada All plants modeled using PLF except Peace River which used peak shaving. Converting Peace River to HTC for 2019 case. ~4000 MW capacity. W A C Bennett Dam across the Peace River

Northwest Methods in use. 7 % nonflexible 26 % historical 67 % PLF The 2019 study may model 3 formerly PLF plants (11,859 MW capacity) using HTC to facilitate wind integration Grand Coulee Dam across the Columbia River

California Most plants are modeled using historical data aggregated to preserve confidentiality then disaggregated to plant level (Irina Green). 23% of 2003 generation uses PLF We experimented with HTC for Big Creek with limited success. Will revisit HTC but most likely not for 2019 case. O'Shaughnessy Dam across the Tuolumne River

Western-Lower Colorado Historical data for all plants. Plants dont follow load (except Hoover) so we expect to stay with this approach. Hoover Dam across the Colorado River

Review of Data-Set Enhancements for 2009 Study Cycle

Expanding Needs Existing process: Transmission congestion Variable costs Limited Scenarios Expanding Process: Capital, On-going Fixed and Variable costs Renewable Integration Requirements and Costs Transmission and Distribution costs Transmission congestion and system reliability Data set for comprehensive load, resource and policy scenarios 15

16 Modeling Efforts

Highlights of Modeling Hydro and Thermal Modeling enhancements improve operational flexibility attributes Combined-cycle mid-range dispatch Hydro PLF allows shaping to load HTC allows market response to marginal costs, which helps mitigate congestion Fuel and Hydro sensitivities reveal impacts to system across a range of conditions Demand Response Programs provide peak shaving Variable Wheeling Costs create hurdle rate for more plausible inter-regional power transfer 17 Collectively, these modeling improvements are expected to improve production simulations with better estimates of variable costs, congestion and CO-2 emissions

Modeling Needs for 2010 Study Cycle and Beyond

19 Modeling Frontiers GHG Hydro Dispatch Renewables Transmission Congestion Demand TEPPC- CONGESTION AND ECONOMIC SCREENING STUDIES Dynamic Hydro Modeling? Hydro-Thermal Optimization? How do we forecast congestion? Improve Modeling to support congestion metrics Load-Wind-Hydro Correlation? Intermittency? Ancillary Services Modeling? Energy efficiency? Plug-in Hybrids? Price Responsive DRP? CHP? GHG Adders?

Potential Modeling Frontiers 20 Anticipate need for close coordination between TAS Work Groups, Sub- regional Planning Groups and PCC to strive for consistent data and modeling assumptions

21 Comments & Questions? Please send any comments, concerns and/or questions to Tom Miller

22

Reference Slides 23

Wheeling Costs do Impact to Economic Dispatch 24 California Native Generation Increases and Imports Decrease NWPP and AZNWNV Generation Decreases

Southern California Imports 25 Wheeling Cost Impacts: Imports into Southern California decrease closer to historical levels Note: Scale much larger than COI and PDCI

Wheeling Costs Impacts Imports Flows PDCI 26

Wheeling Costs Impacts Imports Flows PACI 27

28

29

How Hurdle Rate Works PROMOD Economic Dispatch PROMOD optimizes in two steps: First with each pool meeting its own load and then with pool-to-pool interchange available This two step algorithm is only for purposes of being able to measure which generators ramp up to provide exports and which generators back down to receive imports, within each area and pool. The price used in solving the interchange is internal to the optimization (not a clearing price from the first step), basically the pool reference price. If pool A has a reference price of 60 $/MWh and pool B has a reference price of 50 $/MWh, and interchange is enabled between the pools, pool-to-pool interchange will occur up to: the point where the reference prices balance, the point where the reference price difference is equal to the hurdle rate. Since the pool-to-pool interchange is being solved within the security constrained economic dispatch, transmission constraints will also restrict the amount of pool-to- pool energy 30

Proposal for DRP Modeling Objective: to model DRP as supply resources based on forecasts reported to LRS for 2019 and Proposed Modeling Methodology: high cost combustion turbine as proxy for DRP Limit dispatch to 100 hours per year WECC Wide DRP amounts to be derived & consistent with sub-regional DRP programs reported to LRS 31

Hydro Sensitivities 32

HOLD SLIDES 33

34 Our Challenge Provide Economic intelligence needed by project developers: – demand side services, new resources, or new transmission Key drivers & Uncertainties Purpose: Inform decision-making about feasibility of economic transmission expansion Transmission Expansions Require Long-lead times (8-10 years) Assess benefits and costs of transmission expansion Expansion Plans run to Investigate effectiveness of transmission expansions for reducing congestion costs Analytical objectives Identify the critical few variables that really matter Identify potential interactions that drive results Scope full range of possible conditions

2009 Study 1. Near-term (2012) to investigate congestion sensitivity to gas prices and hydro conditions 2. Medium-term (2019) to investigate potential congestions under different incremental resource portfolios 3. Long-term (2029) to investigate transmission overlay options. 35

36 Renewables Re-Dispatch shared by thermal and hydro dispatchable resources Deeper penetration of intermittent resources may require additional ancillary services Regulation Load Following Back-up reserves Correlation between load and wind production important in peak periods

37 Water Conditions

38 Future Work Focus: MWG efforts aligned to WECC Expansion Transmissions Studies Tool Assessment for Future Congestion and Economic Metrics Alignment of SWG and DWG efforts Study Planning Cycle Advance Modeling Techniques Advance Data Requirements Advance Studies