WECC Board of Directors April 21-23, 2004 Seattle, Washington WECC Procedure for Reporting of System Events Disturbance Reports Rod Maslowski OC Vice Chairperson.

Slides:



Advertisements
Similar presentations
2004 NERC, NPCC & New England Compliance Programs John Norden Manager, Operations Training, Documentation & Compliance August 31, 2003 RC Meeting.
Advertisements

NERC Policies Introduction
Managing Compliance Related to Human Subjects Research Review Joseph Sherwin, Ph.D. Office of Regulatory Affairs University of Pennsylvania Fourth Annual.
NAESB Coordinate Interchange
Aviation Security Training Module 4 Design and Conduct Exercise II 1.
Business Transaction Management Software for Application Coordination 1 Business Processes and Coordination.
WECC/TEPPC Response to DOE Funding Opportunity Status Update June 29, 2009 Bradley Nickell Renewable Integration and Planning Director.
Remedial Action Schemes Reliability Subcommittee
1 WECC/AESO Membership and Coordinating Operating Agreement WECC Board of Directors Meeting December 2007 Diana Pommen Director Interjurisdictional Affairs.
Summary of Second Draft of the NERC Standard PRC Disturbance Monitoring and Reporting JSIS Meeting August 10, 2010 Salt Lake City, UT.
Definition of Firm Energy and Interruptible Transmission Two Issues Causing Problems for Business in the Western Interconnection.
Operating Reserves --- Again A Discussion Primer
WECC TRD/NERC TADS Webinar
Report of the Planning Coordination Committee December 2006 WECC BOD Meeting Cabo Del Sol, Los Cabos.
Remedial Action Schemes Application and Implementation Requirements & Performance Assessment Measures Vahid Madani Pacific Gas and Electric Co. Chair -
Report of the Operating Committee Don Watkins Operating Committee Chair April 28, 2009.
1 MSRATF Update to TSS (Modeling SPS and RAS Ad Hoc Task Force) Scope of Work Approval January 25, 2013 Joe Seabrook Puget Sound Energy.
About the Operating Committee JGC Leadership Training Salt Lake City, UT May 15, 2008 Don Watkins – OC Chair (plus others)
Underfrequency Load Shedding Report
Intra Hour Tagging/Oasis During System Contingencies The transmission tagging process was initially developed to solve an after the fact accounting issue.
Market Interface Committee Recent Regulatory Activities Philip Tice October 14, 2011.
1 NERC Update WECC OC Meeting June 19, Two Items Variable Generation Reliability Reports.
Status of NERC Standards Activity Joint Guidance Committee Meeting January 23-24, 2007 Steve Rueckert - WECC Director, Standards and Compliance.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
GOALS FOR TODAY Understand how to write a HACCP Plan
1 DOE Safety Committee Handbook. 2 Effective Safety Committee! Make it work for you!
Michigan Electronic Grants System Plus
0 - 0.
Addition Facts
Presented by: Guy Prescott Common Sense Safety, Inc. (530)
Reliability Subcommittee Report Vishal C. Patel Chair – Reliability Subcommittee March 2014.
Determining the Significant Aspects
Jerry Rust Chair - Underfrequency Load Shedding Criterion Team
Gene Henneberg RAS Criterion Drafting Team Chair WECC Reliability Subcommittee’s RAS Criterion Concerns 4/28/2011 San Diego, California.
RPEWG Present and Future Activities Boise, August 17, 2011 RPEWG Meeting 1.
Brenda Ambrosi ISAS Chair OC Update August 2012 Salt Lake City, UT.
NERC PC Issues Update WECC PCC Meeting John Simpson, RRI Energy Planning Coordination Committee Seattle, WA June , 2010.
W. Shannon Black Manager, Standards Processes Results Based Drafting 2013.
Visual 5.1 General Staff Functions Unit 5: General Staff Functions.
Functional Areas & Positions
BAL-001-TRE-1 Primary Frequency Response Update for Texas RE RSC
1 CM HOW-TO DETAILED DISCUSSION. 2 OBJECTIVE n Upon completion of this training you will demonstrate an understanding of how to perform a CM evaluation.
Addition 1’s to 20.
25 seconds left…...
Week 1.
1 PART 1 ILLUSTRATION OF DOCUMENTS  Brief introduction to the documents contained in the envelope  Detailed clarification of the documents content.
Revised Event Analysis Process Event Analysis Subcommittee (EAS) Process Update Team (EUT) Hassan Hamdar – FRCC Reliability Engineer, EAS Vice-Chair FRCC.
PER
1 PER-005 Update Impact on Operators System Operator Conference April and May 1-3, 2012 Columbia, SC Margaret Stambach Manager, Training Services.
Key Reliability Standard Spot Check Frank Vick Compliance Team Lead.
WECC and NERC Protection Criteria and Standards
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 1 Network Operating Committee (NOC) June 12 th, 2014.
SPS Mis-operation – DRAFT Proposal for ERCOT procedures.
Recommendations from 2011 Southwest Outage Heather Polzin, FERC Office of Enforcement Dave Nevius, Senior Vice President, NERC Member Representatives Committee.
Integration of Variable Generation Task Force Preliminary Conclusions and Actions.
NERC Event Analysis Update Member Representatives Committee Meeting October 28, 2008 Robert W. Cummings NERC Director of Event Analysis & Information Exchange.
Actions Affecting ERCOT Resulting From The Northeast Blackout ERCOT Board Of Directors Meeting April 20, 2004 Sam Jones, COO.
SPS policy – Information Presentation Presentation to ROS June 16, 2004.
Project System Protection Coordination Requirement revisions to PRC (ii) Texas Reliability Entity NERC Standards Reliability Subcommittee.
February 26, 2013 Board of Directors Meeting 2012 ERCOT Region Reliability Update.
COMPLIANCE UPDATE ERCOT ROS Meeting April 9, 2002.
Grid Operations Report To ERCOT Board Of Directors December 16, 2003 Sam Jones, COO.
Impacts and Actions Resulting from the August 14, 2003 Blackout Minnesota Power Systems Conference November 2, 2003.
ERCOT DYNAMICS WORKING GROUP Report to ROS August 16, 2007 Vance Beauregard, American Electric Power.
TEPPC Review Task Force January 11, Purpose Advise and make recommendations on Future potential future generation and load balance Adequacy of the.
MIC Committee Discussion
Impacts and Actions Resulting from the August 14, 2003 Blackout
MIC Committee Discussion
MAC Input on Section 4.9 Review
NERC Planning Committee Update
Presentation transcript:

WECC Board of Directors April 21-23, 2004 Seattle, Washington WECC Procedure for Reporting of System Events Disturbance Reports Rod Maslowski OC Vice Chairperson Pacific Gas and Electric Company

2 Overview Reporting trigger levels Disturbance report requirements Follow-up process

3 WECC Reporting Trigger Levels Level 1 (most severe) – System separation – System island – Generation loss greater than 2000 MW if it is a precipitating factor of a larger event

4 WECC Reporting Trigger Levels Level 2 (moderate severity) – Loss of firm load greater than 300 MW for larger systems or major damage – 200 MW or 50% for smaller systems – Voltage ±10% – Damage to equipment caused by acts of nature or sabotage – Frequency excursion

5 WECC Reporting Trigger Levels Level 3 (least severe) – Operating outside of MORC or accordance with operating procedures without taking corrective action – Unusual misoperation of equipment – Attempted physical or cyber sabotage with the intent to disrupt service – Abnormal system conditions that might be encountered

6 Other Reports Abnormal and emergency events – Reliability Coordinator RAS failure/misoperation

7 Member Reporting Requirements Same day reporting required Coordinate with Reliability Coordinator and other systems Preliminary report requirements – Describe events – Generation, lines, customers/load affected – UV, UF, RAS tripping – Restoration Typically 1-2 pages, typically reports per year (2004 YTD = 6) No approvals requested

8 Follow-up Disturbance Reporting Abbreviated or detailed reports OC and CMOPS chairs, WECC staff, WECC CEO collaborate on required report level – System impacts – Unique or unusual problems – Publicity and external interest

9 Abbreviated Report Ad Hoc Task Force investigates and prepares report – Led by system entity in which event occurred – Impacted neighboring systems invited to participate – Relay protection personnel and Reliability Coordinator involved Typically 3-5 pages, reports per year (2004 YTD = 0) Report completed within 6 weeks of event occurrence

10 Abbreviated Report Requirements Describe event Lines, load, customers affected Frequency and voltage excursions – Frequency below 59.6 – Voltage dip greater than 20% Restoration and returning system to normal Conclusions (statement of finding) and corresponding recommendations (required actions) – Assess performance with established operating criteria Performance Evaluation Checklist – 15 event categories (facilities, relaying, personnel, etc.) – Contribution to event and explanatory comments

11 Abbreviated Report Approved by Disturbance Task Force and CMOPS FYI to OC, unless of regional significance Available to WECC members, NERC, DOE, FERC, other utilities Summary provided when requested by others if approved by lead organization

12 Detailed Report Ad Hoc Task Force investigates and prepares report – TF chair from outside system where event occurred – Relay WG and Reliability Coordinator included on TF – Neighboring and impacted systems participate Typically pages, plus attachments, 0-2 reports per year (2004 YTD = 0) Report completed within 8 weeks of event occurrence (depending on severity)

13 Detailed Report Requirement Introduction – Describe event – TF participants – Cause and impact of event Conclusions and recommendations – Assess performance with established operating criteria – Must be a conclusion for each recommendation

14 Detailed Report Requirement Conditions prior to the event – Generation and T-line status – Interchange summary – Key voltages – Abnormal system conditions Description of event – Initiating event – Loss of generation and/or transmission – Voltage and frequency excursions – Customers and load affected – Performance of protection schemes – Restoration

15 Detailed Report Requirement Sequence of events – Chronological listing of relevant key actions Exhibits – Diagrams, maps, charts to support report Performance Evaluation Checklist – 15 event categories (facilities, relaying, personnel, etc.) – Contributions to event and explanatory comments

16 Detailed Report Board approval required, following Disturbance TF, CMOPS, and OC approval Available to WECC members, NERC, DOE, FERC, and other utilities Summary provided when requested by others if approved by lead organization

17 Learning and Improving Following Events Review and discussion with other members Follow-up on recommendations (corrective actions) – Tracked via WECC disturbance log – Updated 3 times a year – Managed by CMOPS – Currently 34 active items on log Disturbance Log – Being reviewed by NERC as an industry best- practice

18 In Summary Reporting – Timely and thorough – Allows for learning by others – Corrective actions identified and addressed Opportunities for Improvement – Completion of recommendations – Increasing trend of abbreviated reports