BUILDING MATERIAL BUILDING MATERIAL PALESTINE UNIVERSITY chapter No.#7 Mechanical Works Dr. Ali Ibrahim Tayeh.

Slides:



Advertisements
Similar presentations
1 Compliance & Credits: The Tools, The Rules and How They Affect Your HUD Multifamily Housing Project (Real Estate Assessment Center Inspections) Presented.
Advertisements

Typical Plumbing System
ACTIVE LEARNING PROCESS
Power Plant Engineering
Fired And Unfired Pressure Vessels
International Mechanical Codes Scald Protection. – Where a combination potable water-heating and space-heating system requires water for space.
Boiler Operation Procedures
Customer Service – International Dept. The thermal solar systems  Installation  Commissioning  Maintenance.
DRIP DISPERSAL SYSTEMS Problems and Solutions Presented by Keith Surface.
Installation. Indoor Unit Installation Typical Installation.
1 Lincolnshire Fire & Rescue Training Centre FIXED INSTALLATIONS DRY AND WET RISERS COMPETENCE STATEMENT 373.
Walls Ron Gatepain constructionsite.
Farmworker Housing Inspections Unit 3: Conducting the Inspection.
Plumbing System Albert Einstein was named an honorary member of the Plumbers and Steamfitters Union after publicly stating that he would become a plumber.
Understanding and Designing Plumbing Systems
Student Book © 2004 Propane Education & Research CouncilPage Performing Pressure Tests on Gas Distribution Lines Gas personnel must understand.
© 2009 Michigan State University licensed under CC-BY-SA, original at Facility Environment.
Unit 205: Cold water systems
CHAPTER 24 PIPING DRAWING Instructor: M.Yaqub. Chapter 24 piping week# Steel and Wrought Iron Pipe Common use for water, steam, gas and oil. Up.
Skilled Trades 1201 Residential Plumbing.
Installation. Indoor Unit Installation Typical Installation.
Sanitary Engineering Lecture 16
Fuel Oil Systems Fuel Oil Systems consist of: Storage Tanks Pumps
STEAM HEATING.
Hydronic Mechanical Controls
Facilities Management and Design Chapter 5 Water and Wastewater systems.
Kidde Engineered Fire Suppression System 25 bar Equipment Hardware Engineered for use with 3M™ Novec™ 1230 Fire Protection Fluid.
Griner Drilling Service
Plan 2 – Dead-end Seal Chamber Optional Jacket
GIDC DEGREE ENGINEERING COLLEGE BRANCH- CIVIL ENROLLMENT NO PATEL SHARADKUMAR KIRITBHAI SHARMA TANISHQ SHAH ASHIT.
Materials And Construction Technology Materials And Construction Technology PALESTINE UNIVERSITY Chapter No.#8 Mechanical Works Dr. Ali Ibrahim Tayeh.
Installation. Indoor Unit Installation Typical Installation.
1 HVACR116 – Trade Skills Plumbing, HVAC, Electrical Overview.
Chapter 18 Plumbing Plans.
Residential Construction Unit 5 Energy Efficiencies and Mechanicals Mr. Todzia.
SUPPORT FUNCTION 1-1. SBS installation will be done same time by product specialist Loading & Unloading will be taken care for safe handling of.
HVACR116 – Trade Skills Plumbing, HVAC, Electrical Overview.
INSTALLATION & COMMISSIONING. 5WSS Installation Hanging the Unit Hanging the Unit Location Considerations Location Considerations Refrigerant Piping Refrigerant.
By: Dakota White.  Slides  Elements  Project Description  Client Survey  Bubble Diagram  Design Sketches  Code Considerations  Habitat for Humanity.
111 Dr. Nihad Almughany University of Palestine Faculty of Applied Engineering and Urban Planning Dept. of Architecture 2nd Semester Building.
SANITARY ENGINEERING Planning, designing and installation of system for the collection, conveyance, treatment and disposal of the waste.
Cochran Boiler Specification:
Sprinkler Loads on Trusses
1  2008 Kaeser Compressors, Inc., USA (V2.2) “Specifications are subject to change without notice” Presenting... Kaeser Omega Blowers.
Unit 209: Drainage systems
Boiler Safety Valve Regulations
Ullrich, DESY Dubna GDE XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser 1 Water cooling XFEL Desingn of the XFEL water cooling.
Queen Anne Academic Center Prince George’s Community College 301 Largo Road Largo, Maryland By: Austin Heidelbaugh.
Course Content  Layout of distribution  networks, methods of water  distribution, storage capacity of ESR, and underground service reservoir.
Facilities Management and Design Chapter 5 Water and Wastewater systems.
Facility Environment 1.
VALVES IN PIPE LINES.
Under floor heating Designing underfloor heating (UFH) system must always comply with the system suppliers instructions.
}السلام عليكم ورحمة الله وبركاته{
Plumbing system fundamental and design course
Flash penetrations through roofs and walls.
ARAC/H/F Air-cooled water chillers, free-cooling chillers and heat pumps Range: kW.
Parul Institute of Technology
Electrical Gas Plumbing Heating & Cooling
Chapter 10 Sanitary Facilities and Equipment
Student CD for Commercial Refrigeration for A/C Technicians Chapter 12 Ice Machines.
Hot Water Systems Cylinders and Systems.
Common Requirements Taps and Valves.
Power Plant Engineering. Boilers Boilers Boiler is an apparatus to produce steam. Thermal energy released by combustion of fuel is used to make steam.
GENERALPIPINGREQUIREMENTS:. Designing and erecting an efficient piping system requires certain aspects/ requirements which could be found in our PME handbook…
February 2019.
Boiler Safety Valve Regulations
Full Service Plumbing Columbus, Ohio. plumbing The art and science of creating and maintaining sanitary conditions in a building used by humans. It is.
Presentation transcript:

BUILDING MATERIAL BUILDING MATERIAL PALESTINE UNIVERSITY chapter No.#7 Mechanical Works Dr. Ali Ibrahim Tayeh

MECHANICAL WORKS General Mechanical works must hve high control in order to prevent any damage. Mechanical works must hve high control in order to prevent any damage. Because its problem appear after some times. Because its problem appear after some times.

MECHANICAL WORKS considerations MECHANICAL WORKS considerations We should take in our considerations Bath room accessories distribution   Accessories (such as grab bars, paper towel dispenser, seat cover dispenser, toilet tissue dispenser, soap dispenser, hand dryer, etc.) should not be appered by doors.   Bath room accessories distribution depend on accessories dimensions Structural factors   pipes must be taken in consecration when we design structural element for buildings as drop beams.

MECHANICAL WORKS considerations   water pipes must be prevented to locate near to footings or in the middle of buildings. Collector boxes   Collector boxes must be located in a suitable place enable the human move with more friability in order to be easier maintenance and easier insulation.

MECHANICAL WORKS considerations Fresh water and waste water pipes must check it after installed it. It is preferred to control any supplier by water switch. To prevent leakage losses or to make high control and easy maintenance. It is preferred to use a good kind of switch to prevent water leakage and brokenness.

MECHANICAL WORKS Valves   All valves shall be installed so that they are accessible for inspection and maintenance, and are fully operable.   Air vents shall be located at highest points in the lines.   No joints shall be made within walls, floors or ceiling thickness, or in inaccessible positions.   Drain valves shall be provided at the bottom of every riser and on the outlet side of branch isolating valves, and at all low undeniable points.

MECHANICAL WORKS Testing   The domestic hot and cold water service pipe work shall be tested with potable water to a pressure of 1 1/2 times the working head and maintained for two hours without further application of pressure, and without visible leakage or drop in indicated pressure.   In the event of the failure of any test the defect shall be located and repaired, and the test repeated.

MECHANICAL WORKS Testing   All pipe work shall be hydraulically tested as soon as is practicable after installation and before completion of shaft walls, access panels, suspended ceilings and application of insulation.   The pipe work shall be inspected and hydraulically tested to not less than 1 1/2 times the working pressure whichever is greater. The test shall be maintained for 2 hours without further application of pressure and without visible leakage or drop in indicated pressure.

MECHANICAL WORKS Pipe Sleeves   Where pipes pass through floors or walls, compatible pipe sleeves shall be supplied. Unless otherwise stated pipe sleeves shall be sized to provide 15 mm clearance around the pipe to be installed or, where the pipe is to be thermally insulated or otherwise covered, 15 mm clearance around the surface covering in order that the sleeve may be packed and sealed with mineral or glass wool sealed at both ends with water and fire retardant mastic. Particular attention should be given to necessary fire-stop approval materials.

MECHANICAL WORKS Pipe Sleeves   Sleeves shall be of the same material as the piping and shall be cut to the correct required length at site with due allowance for the thickness of plaster and/or other finishes.   Water protecting pipe sleeves through floors shall be supplied and fixed in the following locations: in floors provided with a waterproof membrane in plant rooms in kitchen areas

MECHANICAL WORKS Drainage System .  This system shall be installed to collect the foul drainage from sanitary and waste water items and convey this effluent to the external authority sewers. Also this system shall cover the storm water (rain water) drainage.   Drainage water can be grouped to three group: Clean water Rain water waste water

MECHANICAL WORKS Drainage System  Drainage water coming to its manholes by gravity generally  Some times we used pumps in order to getting water to manholes,in this case the reason to use pump is: Difference of level Difference of level This happen if the lowest level of pipes is lower than the bottom level of manholes, so we use pump to come over this problem and getting the water out.

MECHANICAL WORKS Drainage System Huge quantities Huge quantities Some times huge quantities of water cause discharge problem, so we use pump to come over this problem and getting the water out.

MECHANICAL WORKS EVAPORATORS Material The shell and tube plates shall be of steel and the water boxes/end covers of steel or cast iron. Water-box end covers shall be removable. Tubes shall be copper, aluminum brass or cupro-nickel. Supports of suitable materials shall be installed to prevent tube vibration Tests Refrigerant and water spaces shall be pressure tested at the manufacturers works in accordance with this specification.

MECHANICAL WORKS Roof isolation Roof isolation   To check roof isolation we must close all sewage or rain water pipe opening then pump a big water quantities to special datum and observe the change of water level with respect to datum level   Piping requiring to be thermally insulated or otherwise covered shall be so fixed as to permit the application of the covering around the full circumference and also leave adequate space between covered pipes.

MECHANICAL WORKS ELEVATOR ELEVATOR There are General spas faction should be taken in our consideration in order to get more safe elevators as:   Driving system.   Capacity (LOAD).   Power supply.   Motor capacity.   Stops and saftey.   Travel   Rate speed.   Door systems.   Door size.   Car Size.   Hoist way Size.

MECHANICAL WORKS END