Electron Cooling Commissioning Update Run II meeting May 12, 2005 L. Prost, Ecool Group.

Slides:



Advertisements
Similar presentations
Proton Beam Measurements in the Recycler Duncan Scott On Behalf of the Main Injector Group.
Advertisements

Paul Emma LCLS FAC April 16, Initial Experience with Injector Commissioning P. Emma, et al. Facilities Advisory Committee.
OTR MEASUREMENTS AND MODELING OF THE ELECTRON BEAM PARAMETERS AT THE E-COOLING FACILITY A. Warner 1, A. Burov 1, K. Carlson 1, G. Kazakevich 2, S. Nagaitsev.
1 Low-energy RHIC electron Cooler (LEReC) Update November 17, 2014.
NOvA meeting PIP Update W. Pellico. PIP Goals and Scope (Provided in 2011 – Directorate S. H. / DOE Talk ) Goals: Specific to the issues surrounding the.
The 2nd Tevatron Electron Lens and tests of a new electron gun in the framework of Beam-Beam Compensation project Yu. Alexahin, V. Kamerdzhiev, G. Kuznetsov,
Sergey Antipov, University of Chicago Fermilab Mentor: Sergei Nagaitsev Injection to IOTA ring.
Electron Cooling in the Recycler Ring Alexander Shemyakin (Fermilab/AD) May 31, 2005.
Pelletron Battle – Field Report All Experimenters’ Meeting August 15, 2011 L. Prost (for A. Shemyakin)
STRIPLINE KICKER STATUS. PRESENTATION OUTLINE 1.Design of a stripline kicker for beam injection in DAFNE storage rings. 2.HV tests and RF measurements.
Status of High Energy Electron Cooling at FNAL’s Recycler Ring XX th Russian Conference on Charged Particle Accelerators September 13 th, 2006 L. Prost,
Fermilab DC Cooler Experiences Lionel Prost MEIC Collaboration Meeting Spring 2015 (Topics: Ion Beam Formation and Cooling) 30 March 2015.
HESR 2 Electron Cooling Björn Gålnander The Svedberg Laboratory Uppsala University Midterm Review, DIRACsecondary-Beams December 8, 2006 GSI, Darmstadt.
Electron cooling of 8 GeV antiprotons at Fermilab’s Recycler: Results and operational implications June 5 th, 2006 L. Prost, Recycler Dpt. personnel Fermi.
3 GeV,1.2 MW, Booster for Proton Driver G H Rees, RAL.
INTRODUCTION  RECYCLER BPM – Original system not adequate to measure beam position precisely. It is being upgraded to meet the required physics precision.
Recycler Status and Plans Shekhar Mishra MID/Beams Division Fermilab AAC Review 2/4/03 Introduction to the Recycler Ring Recycler Improvements and status.
Run II PMG 2/16/06 Martens/Sims 1 Run II Upgrades Status February 2006.
AAC February 4-6, 2003 Protons on Target Ioanis Kourbanis MI/Beams.
October 4-5, Electron Lens Beam Physics Overview Yun Luo for RHIC e-lens team October 4-5, 2010 Electron Lens.
Electron cooling at the Recycler: Update and Cooling force characterization October 19 th, 2006 L. Prost, Recycler Dpt. personnel Fermi National Accelerator.
1 Flux concentrator for SuperKEKB Kamitani Takuya IWLC October.20.
1 EPIC SIMULATIONS V.S. Morozov, Y.S. Derbenev Thomas Jefferson National Accelerator Facility A. Afanasev Hampton University R.P. Johnson Muons, Inc. Operated.
Diagnostics for intense e-cooled ion beams by Vsevolod Kamerdzhiev Forschungszentrum Jülich, IKP, COSY ICFA-HB2004, Bensheim, October 19, 2004.
Alexei Fedotov, 02/02/12 1 Potentials for luminosity improvement for low-energy RHIC (with electron cooling) February 2, 2012.
Stability of the electron energy Recycler department meeting April 5 th, 2006 A. Shemyakin, M. Sutherland.
1 BROOKHAVEN SCIENCE ASSOCIATES Storage Ring Commissioning Samuel Krinsky-Accelerator Physics Group Leader NSLS-II ASAC Meeting October 14-15, 2010.
Overview of Electron Cooling Activities at FNAL Thomas Kroc Fermilab – Electron Cooling EIC 2004 March 15-17, 2004 Jefferson Lab.
Electron energy stability: analysis from snapshot data and temperature stabilization Recycler Departmental Meeting May 21, 2008 A. Shemyakin 1.Analysis.
Highlights of the YAG measurements carried out October 9-13, 2007 Recycler Weekly Departmental Meeting October 10 th, 2007 L. Prost, A. Shemyakin, A. Warner,
The Stripping Foil Test Stand in the Linac4 Transfer Line
A simple formula for calculating the momentum spread from the longitudinal density distribution and RF form Recycler Meeting March 11, 2009 A. Shemyakin.
Overview of Booster PIP II upgrades and plans C.Y. Tan for Proton Source group PIP II Collaboration Meeting 03 June 2014.
Project X RD&D Plan Beam Transfer Line and Recycler Injection David Johnson AAC Meeting February 3, 2009.
F All Experimenters' Mtg - 2 Jun 03 Weeks in Review: 05/19/03 –06/02/03 Keith Gollwitzer – FNAL Stores and Operations Summary Standard Plots.
LDRD: Magnetized Source JLEIC Meeting November 20, 2015 Riad Suleiman and Matt Poelker.
Progress of Electron Cooling at the Recycler January 26 th, 2006 L. Prost, Recycler Dpt. personnel f Fermi National Accelerator Laboratory.
RF source, volume and caesiated extraction simulations (e-dump)
Updated Overview of Run II Upgrade Plan Beam Instrumentation Bob Webber Run II Luminosity Upgrade Review February 2004.
Developments of the FETS Ion Source Scott Lawrie.
Run II PMG 1/19/06 Pushpa Bhat 1 Run II Upgrades Status January 2006 Pushpa Bhat.
Main Injector Beam Position Monitor Upgrade: Status and Plans Rob Kutschke All Experimenters’ Meeting April 3, 2006 Beams-doc-2217-v3.
Status of the Accelerator Complex Keith Gollwitzer Antiproton Source Accelerator Division Fermilab 2009 Fermilab Users’ Meeting.
Beam Physics Issue in BEPCII Commisionning Xu Gang Accelerator physics group.
PSB H- injection concept J.Borburgh, C.Bracco, C.Carli, B.Goddard, M.Hourican, B.Mikulec, W.Weterings,
Electron energy stability (observations after the HV regulation repairs) Recycler Meeting April 30, 2008 A. Shemyakin.
12/16/03Tev BPM requirements1 Tevatron BPM requirements Mike Martens.
IoP HEPP/APP annual meeting 2010 Feedback on Nanosecond Timescales: maintaining luminosity at future linear colliders Ben Constance John Adams Institute,
Development of High Current Bunched Magnetized Electron DC Photogun MEIC Collaboration Meeting Fall 2015 October 5 – 7, 2015 Riad Suleiman and Matt Poelker.
PXIE Beam Instrumentation Status Update – Preparing for MEBT 1.1 Beam Vic Scarpine Feb. 9, 2016.
1 BROOKHAVEN SCIENCE ASSOCIATES Beam Stability Overview NSLS-II CFAC Meeting May 8, 2007 S. Krinsky.
H - ion source at the pre-acc R&D lab Update HINS Meson meeting January 20 th, 2011 L. Prost, C. Schmidt, D. Bollinger, R. Tomlin.
Cons Gattuso 2/23/10 Status/Changes to Pbar Transfer Program.
Weekly Review of Operation Recycler departmental meeting November 14 th, 2007.
Recycler Operation and studies Week Nov. 10- Nov Meiqin Xiao.
PXIE Ion Source & LEBT Commissioning Update Lionel Prost on behalf of A. Shemyakin, R. Andrews, B. Brooker, K. Carlson, J. Czajkowski, R. D’Arcy, B. Hanna,
Operation Status of the RF Systems and Taiwan Photon Source
Areal RF Station A. Vardanyan
Electron Cooling Simulation For JLEIC
Coupling Correction at the Australian Synchrotron
Task E - A0 and related activities
Task E - A0 and related activities
Strip-line Kicker R&D at KEK-ATF
The Cornell High Brightness Injector
Beam-Based Alignment Results
Advanced Research Electron Accelerator Laboratory
LCLS Injector/Diagnostics David H. Dowell, SLAC April 24, 2002
Linac Diagnostics Commissioning Experience
(Beam) Commissioning Plan
Optimization of JLEIC Integrated Luminosity Without On-Energy Cooling*
Presentation transcript:

Electron Cooling Commissioning Update Run II meeting May 12, 2005 L. Prost, Ecool Group

Electron Cooling Commissioning Update 2 Outline  Goal, design, plan, installation highlights…  Commissioning progress highlights  Some specifics of what has been achieved  What’s ahead, some important issues that remain  Conclusion

Electron Cooling Commissioning Update 3 People of Ecool  Recycler department head:  Sergei Nagaitsev  Recycler deputy department head:  Cons Gattuso  Ecool Project engineer:  Jerry Leibfritz  Ecool Safety officer:  Mike Gerardi  Electron cooling group:  Alexey Burov  Kermit Carlson  Grigory Kazakevich  Tom Kroc  Lionel Prost  Sasha Shemyakin (GL)  Mary Sutherland  Vitali Tupikov  Arden Warner  Recycler department personnel:  Valeri Balbekov  Dan Broemmelsiek  Jim Crisp  Martin Hu  Dave Johnson  Dave Neuffer  Bill Ng  Stan Pruss  Meiqin Xio  Other AD departments:  Brian Chase  Paul Joireman  Ron Kellett  Brian Kramper  Valeri Lebedev  Mike McGee  Jerry Nelson  Lucy Nobrega  Greg Saewert  Chuck Schmidt  Alexei Semenov  Sergey Seletskiy  Karl Williams

Electron Cooling Commissioning Update 4 Electron Cooling: Long. Rate Design Goal  Cooling needed: 30 eV-s per hour  To minimize the IBS rate, a 65-eV-s stack will be kept in a 4-μs long bunch; 95% of particles will have its energy offset ≤8 MeV.  For particles with ΔE ≈ 8 MeV the drag rate needs to be about 4 MeV/hr to cool 15 eV-s in 30 minutes.

Electron Cooling Commissioning Update 5 Performance goal for the long. equilibrium emittance: 54 eV-s

Electron Cooling Commissioning Update 6 Electron beam design parameters  Electron kinetic energy 4.34 MeV  Absolute precision of energy  0.3 %  Energy ripple500 V rms  Beam current 0.5 A DC  Duty factor (averaged over 8 h)95 %  Electron angles in the cooling section (averaged over time, beam cross section, and cooling section length), rms  0.2 mrad

Electron Cooling Commissioning Update 7 Commissioning challenge  Technical issues not fully resolved with prototype system at Wide Band  Poor reliability of operation at 4.3 MV  Insufficient quality of the cooling section magnetic field  High beam losses  Low-frequency electron beam motion  Inadequate protection system  Concurrently attain stable operation at 4.3 MV, 0.5 A with rms angular spread < 0.2 mrad in cooling section

Electron Cooling Commissioning Update 8 Commissioning guiding principles  Establish ‘some’ beam and verify optics (pulsed beam, first order)  Choice of a pulsed beam over low-current DC beam  Check polarities, calibration,… of all lenses and correctors  Increase beam intensity (pulsed → DC)  Low current loss to maintain recirculation  Make the beam cold (i.e. good understanding of the optics and beam control)  Only way to achieve cooling  Maintain hardware integrity (i.e. avoid drilling a hole !)  U-Bend mode to develop and test protection systems

Electron Cooling Commissioning Update 9 The commissioning project plan summary  On Feb 1, 2005 the Recycler starts to contribute to HEP luminosity (mixed-source operations).  This continues uninterrupted until about Apr 1,  On Feb 1, 2005 the effort switches over to the electron beam commissioning.  Pelletron and U-bend start-up  On Mar 15, 2005 start commissioning of the complete electron beamline.  Run electron beam in a pulsed mode  Pbar operations are uninterrupted  On Apr 4, 2005 start establishing a DC beam.  The Recycler beam may be interrupted  Investigate and correct MI ramp effects on the electron beam  Minimize the effects of the electron beam on the Recycler beam, start running pbar and electron beams concurrently  Establish a 500-mA dc electron beam by July 08, 2005

Electron Cooling Commissioning Update 10 The commissioning project plan summary (cont’)  On July 11, 2005 start adjusting the electron beam parameters  500 mA dc beam is stable  Establish and adjust the beam trajectory in the cooling section  Measure the electron beam properties  The pbar beam is interrupted when electron envelope is measured.  By Sep 08, 2005 demonstrate the electron cooling  In Sep-Dec 2005 the Recycler continues to operate and contribute to the HEP luminosity.  The cooling rates are measured; electron cooling is optimized  Dec 31, 2005 – project ends. Plan assumed no major component failures and no lab wide shutdown in ‘05

Electron Cooling Commissioning Update 11 Major changes to the plan (so far)  Commissioning began ~1 month late  Increased number of shifts/week to compensate  Should not affect milestone for first observation of electron cooling of pbar  U-bend and full line are being commissioned in parallel  Partly because of late start of commissioning  Partly because of delays in getting DC beam permit  Higher number of shifts allows simultaneous progress

Electron Cooling Commissioning Update 12 Electron Cooling Installation Schedule/Highlights  5/04 – MI-31 Building Construction Complete  5/04 – R&D Operations at Wide Band Complete  6/04 – Disassembly/Move of Pelletron Begins  8/04 – 13-week Lab Wide Shutdown Begins (Pelletron Assembly Suspended)  In situ magnetic field measurements of the cooling section solenoids  11/04 – Lab Wide Shutdown Complete (Pelletron Assembly Resumes)  2/05 – Pelletron/E-Cool Installation Complete  3/05 – Commissioning Begins

Electron Cooling Commissioning Update 13 Electron cooling system setup at MI-30/31 Added section (includes additional pumping) Beam line accommodates both U- bend and vertical bend magnets Fast acting valves Magnetically shielded to protect e beam from fields imposed by the MI bus

Electron Cooling Commissioning Update 14 Electron cooling system setup at MI-30/31 Pelletron (MI-31 building) Cooling section solenoids (MI-30 straight section)

Electron Cooling Commissioning Update 15 Mechanical oscillations of the Pelletron  Mechanical vibrations in the Pelletron were greatly reduced between the Wide Band assembly and the current assembly at MI-31  May help reduce beam motion in accel/deccel tubes  May help HV stability (i.e. avoid full discharges) MI-31 assembly Wide Band lab assembly ~ 3 Hz: Chain transverse oscillations ~ 30 Hz: Rotating shaft

Electron Cooling Commissioning Update 16 Commissioning Milestones Highlights  Feb, 21 st – All vacuum work Complete  Feb, 22 nd – First HV on terminal  Feb, 25 th – Installation Complete  Mar, 2 nd – Stable 500 kV in air  Pulsed beam to first BPM  Mar, 7 th – All systems ready for commissioning  Charging system, gun, pulser work  Mar, 8 th – Stable 2.5 MV (tank pressurized w/ SF6) – Begin tubes conditioning  Mar, 10 th – First light on OTR (acceleration side)  Mar, 12 th – End of tubes conditioning (5 MV stable)  Mar, 17 th – 4.3 MeV, 0.5 A pulsed beam to collector (U- Bend mode, low losses)  Regulation system works properly  Mar, 21 st – Correctors to compensate dipole effects of Ecool on Recycler optics commissioned

Electron Cooling Commissioning Update 17 Commissioning Milestones Highlights (cont’)  Mar, 27 th – 4.3 MeV, 50 mA pulsed beam through cooling section  Correctors settings very different from calculations based on magnetic measurements  Mar, 28 th – Apr, 5 th : Shutdown (Pelletron tank opened)  Charging circuitry fixed  Updated gun lens power supply  Removed hard-wired -5 kV: Ready for DC beam  Apr, 7 th – 4.3 MeV, 35 mA DC beam to collector (U- Bend mode)  Apr, 12 th – Low intensity, 4.3 MeV pulsed beam to collector (full line)  Protection systems commissioned with pulsed beam  Apr, 20 th – First DC beam (few mA) in Recycler beam line  Apr, 27 th – 4.3 MeV, 350 mA pulsed beam to collector (full line)  Correctors settings based on magnetic measurements

Electron Cooling Commissioning Update 18 Commissioning Milestones Highlights (cont’)  May 3 rd – 4.5 MeV, 750 mA DC beam to collector (U- Bend)  Low magnetic flux configuration  Preparation for ‘long run’…  … but full discharge occurrences increase  May 4 th – First beam size measurements in cooling section (pulsed beam)  Recycler empty

Electron Cooling Commissioning Update 19 Tubes conditioning  Pelletron is divided into 6 sections  Each section was conditioned to 1.2 MV  All sections together were conditioned to 5 MV (the operation voltage is 4.32 MV)  Conditioning took 5 days (elapsed time)  Detail for individual sections:  Other info:  First vacuum activity began at 0.55 – 0.75 MV for individual sections  A Java Final State Machine was used for conditioning  Conditioning was interrupted several times for some beam related studies at low energy

Electron Cooling Commissioning Update 20 Tubes conditioning - Sections 1-3 (example)

Electron Cooling Commissioning Update 21 High Voltage Stability  Reliable operation at 4.3 MV  Partly due to added section  Wide Band vs MI-31 Pulsed beam, 3 hours: Multiple discharges Pulsed and DC beam, 6 hours: No discharge Intentional Pulsed beam

Electron Cooling Commissioning Update 22 Protection system  Fast acting valves between Pelletron and Recycler ring (on Supply and Return lines)  Activated if pressure rises on the Pelletron side (as a result of a full discharge for instance)  Monitor several dozen signals with the Pelleron Mode Controller (Java Application)  Signals include: - All BLMs - Capacitive pickups (CPOs) (e.g.: for terminal voltage discharges)  When one channel is ‘out of tolerance’ - Gun is closed (i.e. beam extraction is interrupted) - Trip flag is up (need operator to reset before re-establishing beam) - All signal waveforms are saved in the buffer (512 ms long over a time window that includes the trip)  Both the Fast acting valves’ logic and the Pelletron Mode Controller were tested  Improvements were made (increase response speed, more devices recorded, adjusted limits,…)

Electron Cooling Commissioning Update 23 Protection system (cont’)  To avoid full discharges and/or damaging the tubes, it is important to shut off the gun as fast as possible  Right now, it takes about ~1 ms to close the gun after the beam permit has been taken off  Faster circuit will be installed during next shutdown Yellow: Fast CPO Cyan: Beam permit White: Cathode current transformer ~1 ms Gun closes Permit removed

Electron Cooling Commissioning Update 24 Diagnostics  YAG crystal, OTR monitors throughout the beam line  Beam size (shape), distribution  Used to compare to optics models  1 multi-wire scanner  Beam size and shape after 180° bend  Removable apertures in the cooling section  Between each of the ten cooling section solenoid  Beam size and angle  BPMs  Between each of the ten cooling section solenoid + 16 in other beam lines (accel, supply, return, transfer, decel)  Can measure both pulsed and DC beam  Capable of monitoring both electrons AND pbars

Arden Warner, AD/Recycler/Electron Cooling OTR Detectors for the Medium Energy Electron Cooler  Detector characteristics  5 µm foil  Lower current limit 20mA  Resolution 50 µm  Applications  Real-time charge density distribution and beam size measurements  Measurement of beam initial conditions in the acceleration section  Beam ellipticity measurements  Beam temperature measurements with pepper-pot Beam Image from OTR at full current (acceleration tube exit) Beam profile versus Lens current on acceleration side

Electron Cooling Commissioning Update 26 Recirculation in U-Bend mode – Short run  700 mA DC beam re-circulating with low losses (5-10 minutes without discharges) Green: Bias current Cyan: Collector pressure Blue: Acceleration tube current Red: Needle current Relative current loss at 0.5 A: ~6e -6

Electron Cooling Commissioning Update 27 Beam in cooling section (i.e. in Recycler ring)  Pulsed beam transported through the full line with low loss and low ‘spatial oscillations’ in cooling section  Correctors settings in cooling section based on magnetic measurements made in-situ during installation Cooling section Horizontal displacement Vertical displacement BPM intensities (correspond to ~50 mA)

Electron Cooling Commissioning Update 28 Optics measurements  Understanding the beam line’s optics (supply line in particular) is primordial in order to gain the beam envelope control necessary to achieve cooling  Principle: Differential trajectories measurements (good for linear optics only)  Method: - Take reference orbit - Apply kick and measure betatron motion of the beam - Repeat 4 times (+ ‘energy kick’ for dispersion) - Check reference orbit  Preliminary measurements:  Determine that all lenses and correctors are hooked up correctly and/or identify problems  Exercise/commission differential orbit measurement programs  Calibration of power supplies  Help achieving clean transport of the beam

Electron Cooling Commissioning Update 29 Supply line optics: Data vs OptiM  After various problems were found and fixed, and several iterations for calibration purposes, measurements (with pulsed beam) are mostly consistent with OptiM calculations Supply line

Electron Cooling Commissioning Update 30 Preliminary energy measurements  For cooling, the electron beam and pbar bunches energies need to be ‘aligned’, thus measuring the electron beam absolute energy is critical (<0.3 %)  Principle: Measure the Larmor frequency of the beam oscillations in the cooling section solenoid (via differential trajectories measurements)  So far, measurements indicate that the energy is lower than expected by ~3%  Correlated by ‘optimum’ bends settings found  Awaits more precise measurements with DC beam

Electron Cooling Commissioning Update 31 Preliminary total angles  Except for dipole offsets, no attempts were made to minimize the angles (at this stage)

Electron Cooling Commissioning Update 32  DC beam commissioning in the full line  Beam line optics Needs to be analyzed and adjusted to establish design beam size and rms angular spread  Energy stability Energy fluctuation is estimated by analysis of a BPM signal from a high- dispersion region  Establish 0.5 A DC beam  Observe electron cooling  The energies are aligned within 0.3 %  Effect of electron cooling is observed by longitudinal Schottky monitor What’s next ?

Electron Cooling Commissioning Update 33 Interference with the Recycler’s work for luminosity  Effects of ECool bends and cooling section field on the pbar dynamics in RR- Corrected and tested  Effects of the e–beam space charge on pbar dynamics in RR- supposed to be negligible  Changes in the pbar lifetime caused by a pressure rise in the cooling section- is negligible according to measurements in WB. Also, fast isolation valves installed and tested  Drag force- many e- beam measurements can be done either at low electron currents or at the electron energy shifted by 1%  Measurements of DC beam dimensions in CS and measurements with the YAG/OTR downstream of the cooling section- no pbars in RR  If above is correct, the electron cooling tune-up may be done with Recycler being emptied between the TeV shots and pbar shots from the Accumulator

Electron Cooling Commissioning Update 34 Some Remaining Outstanding Issues  Recirculation for long runs (i.e. hours) is not established  Full discharges cannot be prevented (so far)  Main injector beam loss trips our loss monitors  Temporary fix: increase protection system limits but…  … beat the purpose  Need MI people to work on reducing losses and/or additional shielding  OTR cameras in MI-30 tunnel damaged by radiation  Beam motion with MI ramps  Prevents recirculation high intensity beam  Additional magnetic shielding will be installed

Electron Cooling Commissioning Update 35 MI losses (mostly detected on the return line)  Losses appear to be related to slip stacking  First attempts to reduce them were not successful Green: C90 loss monitor Red: R06 loss monitor Blue: R04 loss monitor Cyan: MI beam current Original trip level for DC beam operation

Electron Cooling Commissioning Update 36 MI ramp induced beam motion  Stray fields from the MI bus and/or QCL alter the beam orbit in the return line (mostly)  Induces losses downstream Beam loss spikes on the QCL negative slope 1 Hz repetition rate (random w.r.t. MI ramp)

Electron Cooling Commissioning Update 37 Summary  Achieved stable high voltage regulation (with beam) at designed Pelletron energy (4.3 MV)  Achieved DC electron beam in the Recycler beam line (35 mA)  Achieved ‘stable’ (i.e. minutes) high intensity (i.e. 750 mA) DC beam in U-Bend mode  Implemented and tested (in U-Bend mode) all protection systems  Interference with Recycler operation was minimal  Will increase now  Although the commissioning started later than originally planned, we still expect to observe cooling of pbar by September 8, 2005.