Practical Problems Experienced with Industrial DSM Projects Marius Kleingeld 15 August 2012.

Slides:



Advertisements
Similar presentations
International Civil Aviation Organization TECHNICAL CO-OPERATION BUREAU PROCUREMENT SECTION Procurement of Civil Aviation Goods and Services.
Advertisements

PROJECT MANAGEMENT & BUSINESS PLANNING PROCESS
Developed By: Performance Based Studies Research Group Performance Information Procurement System.
Major Accident Prevention Policy (MAPP) and Safety Management System (SMS) in the Context of the Seveso II Directive.
Roadmap for Sourcing Decision Review Board (DRB)
Ensure Vendor/Engineer of Choice Product Quality
Chapter 4 Scope Management
Impact of Business Analytics on Supply Performance: A Caribbean Perspective Inter-American Supply Chain Forum March 15-16, 2012 Presenter : Mushtaq Mohammed.
Module 11 Session 11.2 Visual 1 Module 11 Executing and Controlling the Work Session 11. 2: Managing Contracts.
1 A six-pack of major RFP problems A Best Practices Training CD by Michael Asner
1/14 Policies/Programmes to Promote the Development of ESCO 5 March, 2012 APERC Workshop, Kuala Lumpur Bing-Chwen Yang Team Leader Asia Pacific Energy.
Chapter 5 IT Processes Presented by Dr. Mohamed Sammouda.
Managing the Information Technology Resource Jerry N. Luftman
Pertemuan Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
KFUPM, Department of Construction Engineering and Management Summary of AN IMPLEMENTATION MODEL FOR DESIGN-BUILD (D-B) PROJECT DELIVERY SYSTEM BY : MOHAMMAD.
© The McGraw-Hill Companies, Software Project Management 4th Edition Managing contracts Chapter 10.
D. Keane June Internal Quality Audits (4.14) -ISO Requirements for Internal Audits -The Audit Process -Templates for Meeting Requirements.
Our Focus On Benefits Realisation >> Delivering Accelerated and Sustainable Business Benefits An introduction to our Project Definition & Benefits Templates.
Development plan and quality plan for your Project
Energy Performance Contracting Approach David Birr President Synchronous Energy Solutions.
Pre-Project Planning Lessons from the Construction Industry Institute Construction Industry Institute Michael Davis, P. Eng, PMP Ontario Power Generation.
1 PMIG PUBLIC SECTOR PROCUREMENT BEST PRACTICES & LESSONS LEARNED Kevin James Barrie Kroukamp.
Basel Accord IITRANSITIONSERVICES Business Integration Support FCM Management Limited Paris New York Toronto.
Risk Assessment – An Essential Standard
Software project management
QUALITY MANAGEMENT SYSTEM ACCORDING TO ISO
 A project is “a unique endeavor to produce a set of deliverables within clearly specified time, cost and quality constraints”
S/W Project Management
Pre-Project Activities Text Chapters 5 and 6. Pre-Project Activities 1.Contract Review 2.Development Plan 3.Quality Plan.
1 A Member of the Team Focus Group Integrated Management Systems Industry View 2 Michael Thompson BSc (Eng), FFICE, MCIWEM Roe Thompson Limited.
Commissioning of Federal Energy Savings Performance Contracts (ESPC) May 20, 2003 Doug Dahle National Renewable Energy Lab.
Chapter 1 Project Management Concepts
New Decade - New Challenges Annual Conference September 2010 Water Services Training Group 14 th Annual Conference New Decade – New Challenges 9 th September.
Industrial Engineering Roles In Industry
1 1 BRANCH: CORPORATE AFFAIRS 1. CORPORATE MANAGEMENT SERVICES To provide financial and strategic support services that enhance service delivery by the.
Free Powerpoint Templates Page 1 Free Powerpoint Templates How do we do it? Class 7.
S10 CONS5Q25 Lara Tookey. Review of estimators workings Decision on what margin to apply Bid submission details Submit your Tender.
EARTO – working group on quality issues – 2 nd session Anneli Karttunen, Quality Manager VTT Technical Research Centre of Finland This presentation.
GBA IT Project Management Final Project - Establishment of a Project Management Management Office 10 July, 2003.
CEN rd Lecture CEN 4021 Software Engineering II Instructor: Masoud Sadjadi Phases of Software.
Certification and Accreditation CS Phase-1: Definition Atif Sultanuddin Raja Chawat Raja Chawat.
M&V Part 1: D.O. Review. 1-2 Your Instructor Mark Stetz, P.E. Ø Worked with FEMP since Ø Serves as FEMP’s M&V Specialist. Ø Contributed to FEMP.
Prepared by the (Institute of Industrial Engineers – Industry Advisory Board)
Commissioning of New and Existing Buildings Alexander P. Boucher, P.E., CEM, LEED BD+C.
Getting the Best from your relationship with Providers and Clients Negotiating in a Localisation context.
An overview of Demand Side Management (DSM) Implementation in RSA Morore Mashao ESKOM - DSM.
State Diamond Trader Strategic Plan 2012/13. Introduction The State Diamond Trader (SDT): Has been in operation for 5 years Has 92 registered clients.
African Regional Director
Alpha Contracting Sole Source Negotiations between Government and Industry (13 CFR (c)(2))
Development through partnership Infrastructure Delivery Management Toolkit: 2010 Edition Delivery Process 2: Project Management 1.
An international supplier of products, equipment and services to the Drilling, Mining, Resource and Construction sectors.
January 2013 Action Plan Skills Building: Module 4 Implementing and Evaluating the Action Plan.
Introduction to the Project Cycle Jane Ebinger Senior Energy Specialist Sustainable Development Department The World Bank.
Safe roads, Reliable journeys, Informed travellers “how the HA is addressing the needs of safety in future maintenance and construction within the design.
Improving performance, reducing risk Dr Apostolos Noulis, Lead Assessor, Business Development Mgr Thessaloniki, 02 June 2014 ISO Energy Management.
URBACT IMPLEMENTATION NETWORKS. URBACT in a nutshell  European Territorial Cooperation programme (ETC) co- financed by ERDF  All 28 Member States as.
Contract management 1. Acquiring software from external supplier This could be: a bespoke system - created specially for the customer off-the-shelf -
ENERGY MARKET REFORMS, R&D & INNOVATION, AND CHALLENGES: TURKISH EXPERIENCE Selahattin Murat ŞİRİN Expert Energy Market Regulatory Authority TURKEY.
Step 1 in the evaluation process No Returnable Document/ Schedule File AFile BFile C Basic Compliance Tenderer’s tick box √ All mandatory requirements.
SHE Requirements Clarification Meeting Date:17 November 2014 Compiled: Nompumelelo Kaule.
 SOFTCON SYSTEMS PVT. LTD. (SSPL) offers unique, creative and practical automation solutions in the field of Process & Power on an LSTK / EPC basis with.
Presenter: Igna Visser Date: Wednesday, 18 March 2015
A six-pack of major RFP problems
THE VALUE (SUPPLY) CHAIN STRETCHES FROM THE BEGINNING OF YOUR SUPPLIER’S SUPPLY CHAIN THROUGH ALL OF YOUR PROCESSES THAT CREATE VALUE FOR YOUR CUSTOMERS.
SACPCMP CONSTRUCTION MANGEMENT SUMMIT
Energy Savings Performance Contracts & Energy Service Companies
Project Name: Project No.: XXX ESCo Addition Model XXX
Training module EPC facilitators A role to play Add date.
How Small Developers and EPC Contractors Can Add PPA Financing to their Arsenals John Langhus, VP Business Development Midwest Solar Expo 2019 New Energy.
HOME AFFAIRS IDENTIFICATION SYSTEM (hanis)
Presentation transcript:

Practical Problems Experienced with Industrial DSM Projects Marius Kleingeld 15 August 2012

Introduction Industrial Demand Side Management (DSM) projects reduced demand by 576 MW from 2003 to % of Eskom Integrated Demand Management (IDM) expenditure in 2011 incurred in industrial sector Industrial DSM projects present unique challenges Specific problems of industrial ESCOs not widely known Hamper new entrants, inexperienced ESCOs, reduce savings

Phases: Industrial DSM Project Phase 1: DSM Investigation  ESCO markets DSM, obtains letter of intent  Detail investigation, measurements, designs, costing  ESCO drafts proposal, submits to client & Eskom Phase 2: Proposal Approval  Internal client funding application  Process proposal through Eskom-IDM PEC, CIC and Procurement  Sign Eskom and client contracts, baseline reports Phase 3: Implementation  ESCO & client scope, tenders, orders, manage installations  Various milestones such as equipment delivery, factory acceptance testing (FAT), cold/hot commissioning Phase 4: Performance Assessment  Performance of project is assessed over three months  Measurement and Verification (M&V) issues savings reports Phase 5: Maintenance  Project handed over to client  Client maintains project to continue savings

Client PEC CIC Procurement ESCO M&V Client + ESCO Implementation Project Approval Process  Can it work?  Will it be sustainable?  Costs?  MW reduction targets  Capital  Payback  Risk  Profit  Safety & health  Production  Maintenance  Independent measurements  Savings reporting  Costs & commercial issues  Discounts  SD&L  Risk  Capital Investment required

DSM Investigation Establish correct baseline  Use metering or portable power loggers  Verify measured energy readings: simulated results / alternatives e.g. log sheets  Always use safety margins Confirm that planned results are viable  Not submit new technologies – experiment first  ESCO must familiarise itself with client operations and requirements  Verify: simulations, calculations and tests  Client cooperation essential Other risks  DSM interventions often seen as threat to job security e.g. pump attendants  Highlight additional benefits to counter resistance e.g. increased safety

Secure Financing Funding approvals  Timing of client & Eskom funds  Delay - client budget problems  Delay - Eskom contract variances  Stacks of paperwork - assist client  Additional requirements e.g. SD&L  Process: up to 24+ months Funding availability  Present scenario (MYPD2) ends March 2013  Previously (MYPD1) Eskom-money ran out – ESCOs without new projects for more than 12 months  Clients also experience reductions in capital spend  Difficult to plan ESCO business with such interruptions and uncertainty Be prepared for “hit rate” <100%

Measure Analysis Cost Proposal Risk R&D technology Client (e.g. safety) DSM proposals do not allow for red “investments” ESCO Process

ESCO skills requirements Multi-disciplinary skills needed May be problematic for small ESCOs – contract experts

Implementation: Client Document trail  Client signs scope document, specifying preferred suppliers, equipment, procedures, etc.  Ensure site personnel and head-office personnel communicate with each other, and agree with all aspects of project  Ensures continuity with personnel changes  Prevent scope creep and cost escalations  Allow for scope changes e.g. new head office standard etc.

Implement: Safety & Access Safety and health not negotiable  Client induction requirements may change  Unforeseen incidents e.g. accidents and site closures  Additional costing must be absorbed Limited access  Project work areas may be restricted  Some work e.g. mine shaft work limited to client personnel  Limitations due to operation, maintenance schedules Solution  Resource planning  Risk assessments

Implement: Subcontractors Sub-contractor issues  Aim for contract extensions e.g. delay tactics  Limited communication and feedback, not attending meetings  Failure to adhere to safety measures Client issues  Unnecessary holdups  Placing additional orders on same sub-contractor Solution: performance-based contracts with penalties

Performance Assessment #1/2 Savings targets: Performance Assessment (PA)  Test evaluation conditions before official start of PA  ESCO representatives to be present semi-permanently on-site during PA Manage PA process  Feedback and corrective actions  Beware of sabotage (Client held to minimum of PA performance or proposal)

Performance Assessment #2/2 System changes between proposal submission and implementation e.g. production increases Duplicate measurements – do not rely exclusively on Eskom M&V

Maintaining Savings Projects often underperform quickly after ESCO hands- over to client  Client personnel have other focus e.g. safety, production  Savings not linked to personnel performance indicators  Personnel have limited knowledge of savings technologies  Shortage of skilled maintenance personnel Solution: Maintenance  ESCO contract  Performance-based  Continuous training

Manage Client Perceptions (1/2)

Manage Client Perceptions (2/2)

Conclusion Cost comparison  Modern power plant: ± R26 million/MW  Industrial DSM projects: ± R5 million/MW => 5 times less Increase industrial DSM activities  More ESCOs involved  Additional MW-savings  Save Eskom and client costs