32853 Evaluation of Demand-Response Programs in the Competitive Electric Market Workshop 1 September 15, 2006 Shawnee Claiborn-Pinto.

Slides:



Advertisements
Similar presentations
QSE Managers Working Group Meeting Notes 9 April, 2010 Report to WMS 21 April, 2010 David Detelich - Chairperson.
Advertisements

NARUC-FERC Demand Response Collaborative Meeting NARUC Fall Meeting Anaheim, CA T. Graham Edwards President & CEO November 11, 2007.
Economic Criteria for Transmission Planning in the ERCOT Region Public Utility Law Seminar DeAnn Walker August 3, 2012.
Tiered Frequency Response Service Workshop On Demand-Response Programs in the ERCOT Market September 15, 2006 Mark W. Smith Smith Trostle LLP.
RenewElec October 21, 2010 Robert Nordhaus, David Yaffe Van Ness Feldman 1050 Thomas Jefferson Street, NW Washington, DC (202) FERC’s.
Floyd Trefny Director of Product Development Future of Demand Response In ERCOT A Presentation to the Workshop – September 15, 2006 Project Number
Retail Market Update June 5, New meter is requested for a specific customer’s location. 2.Application is filed by customer and/or the customer’s.
Energy Efficiency Implementation Project # Load Management Subcommittee Report to: ERCOT Demand Side Working Group August 8, 2008.
July 30, 2015 TAC Meeting Update to COPS Michelle Trenary August 12, 2015.
Small Renewable Generators Tony Marciano Public Utility Commission of Texas May 2, 2007 (512)
FERC’s Role in Demand Response David Kathan ABA Teleconference December 14, 2005.
1 RMS TAC Update March 6, Texas Test Plan Chair; Bill Bell Centerpoint Energy Vice Chair; Leanne Hayden Centrica COMET Chair; Terry Bates TXU.
ERCOT Demand Side Working Group Mary Anne Brelinsky Eagle Energy Partners.
1 Welcome to Load Participation Orientation Elev MenWomen Phones Info Presentation and other Load Participation information will be posted at:
Advanced Metering Implementation Team Update Christine Wright Public Utility Commission of Texas October 2008.
Demand Response Workshop September 15, Definitions are important Demand response –“Changes in electricity usage by end-use customers from their.
March 26, 2015 Technical Advisory Committee (TAC) Update to RMS Kathy Scott April 7, 2015 TAC Update to RMS 1.
Advanced Meter Settlement Background and NPRR. Overview PUC Rule (wholesale settlement) Project – Wholesale Settlement Project Filed Deployment.
RMS Update to TAC January 8, Voting Items From RMS meeting on 12/10/2008  RMGRR069: Texas SET Retail Market Guide Clean-up – Section 7: Historical.
Role of Account Management at ERCOT 2007 TAC Goal Input February 01, 2007.
NPRR XXX: PRR 307 Inclusion in Nodal…Part II. Questions Raised 06/26/06 Section 3 –COP (resource parameters) –CLR participation limits –Telemetry Requirements.
A Strawman for Discussion by Dottie Stockstill & Greg Ramon Special ERCOT Board Meeting June 24, 2003.
Long Term Solution Task Force TAC Report 5/5/07 Presented by: Bob Wittmeyer - LTSTF Co-Chair.
1 Market Evolution Program Long-Term Resource Adequacy Regulatory Affairs Standing Committee Meeting May 14, 2003.
Demand Response in Energy and Capacity Markets David Kathan FERC IRPS Conference May 12, 2006.
1 WMS Report TO TAC January In Brief Two Working Group Reports Two Working Group Reports Two Task Force Reports Two Task Force Reports One PRR.
1 RMS TAC Update April 3, Test Plan Flight Dates It is the practice of RMS to approved the dates for future testing flights. This enables new.
1 Energy Storage Settlements Consistent with PUCT Project & NPRR461 ERCOT Commercial Market Operations May 8, 2012 – COPS Meeting May 9, 2012 – WMS.
August 28, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott September 9, 2014 TAC Update to RMS 1.
Resource Adequacy Task Force (RATF) Update to WMS June 12, 2013.
DR issues in California discussed last year in March Historical DR in California: some background issues –Twenty years of programs/tariffs I/C and AC cycling.
Direct Load Control Update Betty Day Manager of Load Profiling and Data Aggregation February 25, 2003 Retail Market Subcommittee.
Load Resources Negative RRS Bidding in the Nodal Market Credit Working Group January 30, 2008.
Advanced Metering Rule Christine Wright Public Utility Commission of Texas June 6, 2007 Retail Market Workshop COMET WG Meeting.
1 TAC Report to the ERCOT Board February 16, 2005.
Emergency Interruptible Load Task Force Report to TAC November 3, 2006.
Protocol Revision Subcommittee Report to ERCOT Technical Advisory Committee December 5, 2002.
Craig Williams Market Interface Manager August 21, 2014 ISAS, Portland, OR.
August 27, 2015 Technical Advisory Committee (TAC) Update to RMS Kathy Scott September 1, 2015 TAC Update to RMS1.
Long Term Move-In Move-Out Development Strategy August 19, 2002 DRAFT.
Review of PUC Discussion on Nodal Market Adoption Technical Advisory Committee September 7, 2005.
Direct Load Control Update Betty Day Manager of Load Profiling and Data Aggregation February 25, 2003 Retail Market Subcommittee.
Retail Market Update August 6, Load Profile Guides In accordance with section § (e) (3) and PUCT Project 25516, Load Profiling and Load Research.
1 WMS Report TO TAC April In Brief Two Working Group reports Two Working Group reports Two Task Force Reports Two Task Force Reports BENA presentation.
TX SET Update to RMS Wednesday, May 9, Elimination of the Drop to AREP o RULEMAKING TO AMEND COMMISSION SUBSTANTIVE RULES CONSISTENT WITH §25.43,
February 2, 2016 RMS Meeting 1. * Reasons: * Per the ERCOT Board Report dated 8/5/14 there were 6.6M Advanced Metering System (AMS) Electric Service Identifiers.
RMS Update to TAC November 1, RMS Activity Summary RMGRR057, Competitive Metering Working Group Name Change (VOTE) Update on RMS Working Group and.
Role of Account Management at ERCOT 2006 TAC Subcommittee Review ERCOT Board February 21, 2006.
Lead from the front Texas Nodal 1 High-Level Overview of draft NPRR implementing PUCT Rule Posting Requirements January 8,
1 TAC Report to the ERCOT Board November 14, 2006.
Profiling Working Group 1 PWG Update Report By Ernie Podraza of Direct Energy ERCOT PWG Chair Ed Echols Of Oncor ERCOT PWG Vice Chair for COPS Meeting.
ERCOT Update on Day-Ahead Extract and other PUCT Posting changes DEWG Meeting 10/29/07 Matt Mereness.
Emergency Interruptible Load Service Paul Wattles ROS Subgroup Feb. 7, 2006.
Demand Side Working Group March 5, 2010 Mary Anne Brelinsky EDF Trading North America.
Reliability Deployments Task Force Update WMS Meeting WMS Chair created task force with the directive that the task force will address real-time.
Load Participation in Nodal Training Session Update DSWG December 7, 2007.
1 Energy Storage Settlements Consistent with PUCT Project & NPRR461 ERCOT Commercial Market Operations June 27, 2012 – ETWG Meeting.
1 TAC Report to the ERCOT Board July 18, TAC Summary 4 PRRs for approval (3 unanimous) 4 PRRs for approval (3 unanimous) 5 Nodal PRRs for approval.
1 Energy Storage Settlements Consistent with PUCT Project & NPRR461 ERCOT Commercial Market Operations November 2, 2012 – RCWG Meeting.
May 28, 2015 and June 30, 2015 Information Session TAC Meeting Update to COPS Michelle Trenary, July 15, 2015.
Profiling Working Group September 26, PWG Update Report By Ernie Podraza of Reliant Energy ERCOT PWG Chair for RMS Meeting September 26, 2003.
RMS Update to TAC June 7, RMS Activity Summary RMGRR052 File Naming Convention for Customer Billing Contact Information URGENT (Vote) RMS Procedures:
February 26, 2015 Technical Advisory Committee (TAC) Update to RMS Kathy Scott March 3, 2015 TAC Update to RMS 1.
Long-term Solution Task Force Ellis Rankin & Bob Wittmeyer Co-Chairs.
TAC Report to the ERCOT Board
Pilot Project Concept 30-Minute Emergency Response Service (ERS)
Pilot Project Concept 30-Minute Emergency Response Service (ERS)
ERCOT – Southern Cross Transmission ROS/WMS Working Group Assignments
Energy Storage Settlements Consistent with PUCT Project & NPRR461
North America Energy Standards Board
Presentation transcript:

32853 Evaluation of Demand-Response Programs in the Competitive Electric Market Workshop 1 September 15, 2006 Shawnee Claiborn-Pinto

History Docket ERCOT Protocols Approval ERCOT shall develop additional measures and refine existing measures, to enable load resources a greater opportunity to participate in the ERCOT markets. As many of these measures as possible should take effect by January 1, 2002, because existing Commission-approved tariffs addressing load resource participation in the markets will expire this year.

23220 (cont.)  In improving load resources’ ability to participate in the ancillary services markets, ERCOT should consider hiring an independent expert on load participation in competitive electricity markets to aid its efforts. In addition, ERCOT should consider creating a new standing subcommittee or work group dedicated to addressing load resource issues, in order that load resources can cost effectively participate in addressing issues that affect them

23220 (cont.)  The Commission is concerned that designing the markets for generation resources and requiring load resources to generally adhere to Protocols that were designed for generation resources, may unreasonably limit load resources’ participation in the ERCOT ancillary services markets.

Demand Side Task Force Created by WMS in June of 2001 First meeting of the Task Force was August 14, 2001 with over 100 attendees Responsible for refining Loads Acting as a Resource (LaaRs) and Balancing Up Loads (BULs) The first LaaR was Occidental Chemical on a pilot basis in early 2002 In May of 2002, systems were in place for LaaRs “BULs and LaaRs for Dummies” guide was drafted in 2002

Project In 2002, PUCT retained Christensen and Associates (C&A) to evaluate demand- response in ERCOT C&A produced a list of short and long term recommendations Commission staff met with DSWG to discuss the C&A recommendations, then issued a report evaluating the C&A recommendations considered best suited for the ERCOT market

Project No Status of Recommendations DLC customer profile: not implemented Customer, REP, and QSE survey: customer survey being developed Curtailment programs targeting load pockets: no action Evaluate metering policy: rulemaking pending Project Training sessions for customers and REPs: a training session was held in 2003 for former Interruptible Load participants and other C/I customers to explain opportunities for load participation in the new market Add a demand-side expert on ERCOT Staff: ERCOT has hired two demand-side staff persons

Project Status of Recommendations Change Protocols so that LaaRs and BULs may schedule their load resources through a REP/QSE other than their supply contract REP/QSE: no action Develop non-discriminatory measures of performance (loads and generators performances measured according to same rules): no action Adopt a nodal market design with day-ahead markets and locational pricing, and apply MCP to all resources: Nodal design has been adopted, locational pricing will not be applied to loads

History Late 2002/2003 ERCOT created a staff position dedicated to demand side issues a second position was later added Demand Side TF and Profiling Working Group worked together on Direct Load Control procedures, but the project was not implemented Demand Side TF developed procedures to allow interruptible loads to substitute for RMR contracts Cap on responsive reserve that could be provided by LaaRs was raised from 25%-50% October 2003 BUL qualification procedures were finalized (no BULs yet)

Docket Petition of Chaparral Steel Company, Structural Metals, Inc. and Nucor Steel Texas for the Adoption of a Rule to Implement Tiered Frequency Response Service Proposal would allow former instantaneous interruptible rate customers to participate in demand response programs and institute a service with a longer term commitment than a LaaR The petition was supported by ERCOT and Fox Smolen and Associates CPS, Reliant Retail, TXU Energy, Texas Competitive Power Advocates, TIEC, STEC, and TXU ED filed comments in opposition of the petition. “After considering the petition and comments received, the commission denies the petition. The issues raised in the petition will be addressed in a new project in which the commission will consider a range of potential issues associated with increasing demand participation in the ERCOT market.”

Generation Adequacy Rulemaking Emergency Load Response (ELR) was considered Other proposals were made “After reviewing stakeholder comments in response to this question, the commission believes that the ELR concept needs further stakeholder input and review before the commission decides how or even if it should be adopted as a backup resource-adequacy mechanism. As a result, the commission has decided not to adopt this subsection. The commission may further consider whether a resource-adequacy backstop is needed and, if so, how it should be structured as a part of Project No ”

Final Order Nodal Protocols While the Commission will not make any changes based on the recommendations suggested in this proceeding, the Commission recognizes that participation by loads is beneficial to the wholesale and retail markets and should be encouraged. Based on the recommended changes, the Commission is concerned that the protocols as adopted by this Order may not allow full participation by loads. Therefore, the Commission directs that a separate project be implemented to examine load participation in the new nodal wholesale market, including an examination of the issues that were raised in the current proceeding, as well as other methods of including and encouraging load participation in the ERCOT markets. Recommendations produced by this project will be examined by the Commission, ERCOT, and stakeholders, and if found to be feasible and implementable, future revisions to the protocols will be necessary.