Project location, The project and financial overview

Slides:



Advertisements
Similar presentations
COMPLEX Atlantic Palace, Varna
Advertisements

CONSTRUCTION OF SPORTS AND TOURISM CENTER DOLI – VAREŠ Vareš, April MUNICIPALITY VAREŠ.
Infinite Wakeboarding
Gambling zone «Siberian coin» Area of gambling and entertainment complex: 2,304.2 ha. Total investment amount: 667 mln. euro. One of 4 gambling zones.
Concept Plan Presentation October, THE OPPORTUNITY A large portion of the area between Peger Road and Denali School is under utilized public land.
Winter Park Hot Springs Resort & Spa Colorados premiere relaxation destination.
1. A vision to be most dynamic, innovative and reliable real estate corporate of India. Over 25 million sq. ft. of commercial space has been developed.
EUR 147,000 2 nd floor of 6 story building, 90 M2 3 room apartment on Mill Street 31, Riga, Center 3 bedroom apartment in the quiet Riga center. Autonomous.
Unique environmental vacation village in the Middle East.
United States and Canada Introduction. Colony A territory separated from but subject to a ruling power.
Business Park Project: Business Park Project: ‏ Logistic Park, Industrial Park, Gas Station, Shopping Center, Office Building, Restaurant and Motel ON.
Proposal of “Splendora Plaza” in Splendora, Texas Nov acres property in Splendora, Texas, with Beautiful US Route 59/69 frontage, will be developed.
DISHA DIRECT MANOR. 45 Completed Projects 16 Ongoing Projects 5 Customer Relationship Centers 1 International Office (Dubai) Professionals.
VALJEVO AS A TOURIST CENTRE by Marina Simic. Location  Valjevo is located in western Serbia on the rivers Kolubara, Gradac, Obnica and Jablanica 
Construction of resort hotel “DOLGAYA resort & spa” Presentation Project of LLC “Stak” Rostov-on-Don, Russia.
 Investment in residential real estate in touristic zone PROJECT DEVELOPMENT IN CROATIA.
Presented by ICG GLOBAL. Lots in Beautiful Northern Arkansas Excellent for Investment.
PANAIYUR Is a small hamlet, 45 Km  from the ancient Temple Town of Kanchipuram in Tamil Nadu. It is situated along the Bay of Bengal coast Easy connectivity.
MIAMI Miami (pronounced / 'mja mi / in Castilian) is an American city located insoutheastern Florida on the Miami River, between the Everglades and the.
Stuart Law – CEO Assetz plc and Assetz Fund Management Ltd Why Cyprus Why Cyprus Fund Investment Strategy Fund Investment Strategy Where to Invest Where.
FOR SALE. PAPHOS- APARTMENT, TOWN HOUSE M1 Prices From: € Excl. VAT (€ Incl. 5% VAT*, € Incl. 19% VAT**) *Reduced VAT rate of 5%
October 4, 2004 Detrich B. Allen City of Los Angeles Environmental Affairs Department 1 Siting New Development Detrich B. Allen General Manager Environmental.
A Mediterranean Resort by the Sea The Seaside city of Loutraki.
SARDINIA. I s M olas is the most important Sardinian Golf Resort located few minutes drive from the paradise beaches and inlets of the Sardinian south.
PROJECT: Construction of a tourist hotel and recreation center on the river Una Sarajevo Business Forum April god. Pension SARAJ Kulen Vakuf Bihac,
PROJECT: HOTEL BOSNALIJEK /OLYMPIC MT.BJELAŠNICA.
2008 Legislative Summary Utah APA Luncheon West Valley City March 10, 2008.
Land Use Study for the Community of Winchester July 9, 2012.
Presents. ESTABLISHED:1993 OWNERS:Mercedes Soler and Tomas Martinez FOCUS: Real State Ownership and Management and Developer of properties in Southeastern.
KLADANJ RESIDENTIAL & SPORTS CENTER Information Memorandum - Presentation to Investors - Sarajevo, may 2015.
PRESENTATION HOST CITY DONETSK. Donetsk – large industrial, scientific and cultural center of Ukraine. Population – Donetsk – business capital.
DUBAI BREEZE *HOUSE* *COMPOUND: DUBAI BREEZE*. *COMPOUND PLOT AREA : 20 FEDDAN*
Overview of the Lodging Industry
CREATING A HEALTHY TREND OF BEING ASSOCIATED WITH NATURE City life gives us wealth, comfort and living standard but at the cost of mental & physical.
Investment Project Century Tower, Larnaca, Cyprus.
Federation of Bosnia and Herzegovina Tourism in Federation of Bosnia and Herzegovina Sarajevo, February 2014.
Colorado Front Range Trail Corridor Plan Colorado Front Range Trail Corridor Plan.
14042 BICKY ROAD SE Affirm Board of Zoning Adjustment decision and conditions of approval Board of County Commissioners November 19, 2013.
“Diamond in the Rough”  Cabo Rojo, Puerto Rico “Diamond in the Rough” The Enchanted Island Cabo Rojo/Lajas, Puerto Rico.
Mountain View Bungalows - Hin lek Fai – Hua Hin TAILANDIA The Mountain View Bungalows were completed in a gated community in January 2011 with a total.
Proposal of “Splendora Plaza” in Splendora, Texas Nov acres property in Splendora, Texas, with Beautiful US Route 59/69 frontage, will be developed.
“Drushti Creators” presents you truly unique investment opportunity in developed N.A. plots adjacent to beautiful and picturesque lake, in the rapidly.
Zyuratkul National Park. Zyuratkul National Park, one of the most beautiful parks in South Ural, located in Catkinskom district of Chelyabinsk region,
Your new home in the mountains! Bad Kleinkirchheim - Austria.
Learning the Basics of Recreation Facilities 3 chapter.
B O S N I A A N D H E R Z E G O V I N A T U Z L A MUNICIPALITY SREBRENIK K A N T O N April, 2015 PROJECT: WINTER – SUMMER SPORT AND RECREATION CENTER WITH.
Organization of Agreement States August 19-20, 2013.
Location The park is located between the major centers of consumption in Russia Industrial Park MSB-Udomlya is located in the Tver region. The developed.
THE PLACE WHERE CARLAUNCHES ROCK. Drive in the island of the Sun Ibiza is the island of glamour, the sun, the wellbeing and the happy people. Longest.
Learning the Basics of Recreation Facilities
River Design Overlay. The purpose of the River Design Overlay is to: ◦govern form, function, design and use for properties located within the boundaries.
Ministry of Roads and Urban Development Urban Development & Revitalization Corporation of Iran (Holding) December
Green Roof Technology Green roof technology is a relatively new advancement that consists of an installation of a layer of vegetation placed over a waterproof.
TOURISTIC PRESENTATION OF THE DISTRICT OF BRCKO.
Russia. Tver region. Zavidovo. This is a unique place for medicine.
DISHA DIRECT MANOR. 45 Completed Projects 16 Ongoing Projects 5 Customer Relationship Centers 1 International Office (Dubai) Professionals.
PROVIDING ONE WITH BREATHTAKING MOMENTS….
Sarajevo Business Forum
Europe, Serbia, Novi Pazar
Ekvator Company Ltd. Banja Luka, B&H
Patagonia Dream An exceptional property in Patagonia located on a
Syllabus – Land Management
The Business of Leisure Investigating in Leisure and Tourism
LAND DEVELOPMENT INVESTMENT OPPORTUNITY ANTALYA, TURKEY
Bürgenstock Resort Lake Lucerne Opening Summer 2017
Regional cooperation and FDI inflow Docent dr. Maida Bećirović
HILTON HOTEL PODGORICA
CITY OF BIHAĆ BOSNIA AND HERZEGOVINA PROJECT: BUSINESS - TOURIST AIRPORT BIHAĆ International conference on regional market, statistics development.
Home is; Where the Game is
The private sector and recreation
Presentation transcript:

Project location, The project and financial overview Neretva Elite Resort Project location, The project and financial overview

Project owner INTEGRAL-ELEKTRO Is the owner of the land and the project initiator It is experienced company in a construction field With a over 18 years of experience Some major projects in Sarajevo and all around B&H The project is in the initiation phase and it is based on the research for highest and best use

Site location Sarajevo Konjic Mostar 47 km from Sarajevo Airport to Konjic 20 minutes away from Konjic 53 km away from Mostar 2.5 hours away from the Croatian coast The Site is surrounded with a natural beauties 65% of Konjic area is covered with a forest Highway “corridor 5C is expected to be finished in next few year The travel duration from the location to major travel points (cities) will be reduced counted in hours The location is 20 minutes away from the future high way

The Site The road East

The River Neretva River is the one of the most beautiful rivers in Bosnia and Herzegovina In its first part of its flow the river water is drinkable From the Glavaticevo many recreational sports take place at the river, such as: Rafting: Kayaking Hiking Cycling There is a several sports clubs in Glavaticevo and Konjic Mountains in the area Bjelasnica mountain is a ski resort Prenj Visocica Igman Lakes in the area Boracko lake (natural lake) Jablanicko lake

The Site- legal issues The site is in the single private ownership of INTEGRAL-ELEKTRO Category of the site – for construction There is no legal limitations Under the Authority of Konjic municipality Obtain environmental permits in the final phase APPROVAL of municipality of Konjic-Mayor Drawing plan of “Nertva elit resort” Geology report

The Site The road East

The project

The Project Serenity and nature are united in offering unique experience Top-notch design 70 villas -Three types of villas Pedestrian zone along the river Recreation center Community center The Hotel Retail Area The whole resort is design as top-notch community where serenity and nature are united in offering unique experience. The accent is given to natural resources and beauty of what B&H can offer. Regardless to season, the resort design accommodates community’s needs, whether to escape from summer heat, or to enjoy in a white Bosnian winter. The community Resort is design as separate entity independent from the surrounding with the green fence; the community access is possible only via the control gate, what allows privacy to the community residents. The site is divided into 70 parcels allocated for individual villas, the community center with kindergarten and the mosque is located in the center of the community next to the small lake surrounded with a greenery. The recreation area, tennis court, football court, Volleyball court, Basketball court, Indoor and Outdoor poll, are located at the west site of the site next to the Resort entrance. The parking and rent-a-care (travel agent) and retail area are at the entrance of the resort from the left side while hotel with a restaurant is on the right side of the entrance. The recreation area covers more then 3000 sqm of total site. Pedestrian track and cycling track is designed along the river shore.

The Villa There is 70 villas Three types of villas Each villa consists of Residential area Garage Two paring spaces Backyard and front yard Sizes of the villa plot vary from the 450 to 750 sqm The idea behind design is “Strong Community” Peacefulness Nature Beauty Safe And the most important - water Villas Plot area Net Area sqm Total number of villas Type 1 450-750 120 20 Type 2 160 25 Type 3 200

The Villa type 1

The Villa Type 2

The Villa Type 3

SWOT analysis Strenght Weaknesses Opportunities Threats Natural resources   Perfect climatic conditions during the whole year Good position Distance to the Sarajevo airport Customers from GCC counties who bought property in BH have to register company in order to sign ownership of property. Increasing number of GCC guest Amazing location and easy travel to Bosnian touristic attractions The resort operation is a main generator of business developments Employments of local population Construction period to be longer than expected

Market Analysis There is a lack of the high-end developments such as the Resort. In last few years potential buyers are looking into investing in a similar projects. Most of the developments are taking place in Sarajevo while not many or not even one is undergoing in natural surrounding. Sarajevo is emerging market mostly for hotels and administrative building while Konjic is unexplored city for high investments. As a reference, number of touristic is increasing each year, especially during a summer period. Out of overall visitors to Bosnia and Herzegovina there is an increasing interest of visitors from GCC countries.  

Notes Financial structure is projected as an indicator of future costs and possible returns on a investment Projections are subject of change Full financial report can be issued upon written request Project operation structure can be issued upon the request and with a sole approval from the project owner Loans or mortgages are not included Initial Financial breakdown structure has a positive feedback All values are in Euros

Financial indicators