Standard Costs – Overview

Slides:



Advertisements
Similar presentations
McGraw-Hill/Irwin Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. Standard Costs: Direct Labor and Materials Chapter Twelve.
Advertisements

McGraw-Hill/Irwin Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights reserved. Chapter 9 Recording and Evaluating Conversion Process Activities.
Absorption Costing -Overview
CHAPTER 14 Cost Allocation, Customer Profitability Analysis, and
Using Budgets for Planning and Coordination
Cost Management Chapter 10 Static and Flexible Budgets
1 © 2012 John Wiley & Sons, Ltd, Accounting for Managers, 4th edition, Chapter 17 Budgetary Control.
© John Wiley & Sons, 2005 Chapter 11: Standard Costs and Variance Analysis Eldenburg & Wolcott’s Cost Management, 1eSlide # 1 Chapter 11: Standard Costs.
Using Variances under Standard Cost System
© Pearson Education Limited 2008 MANAGEMENT ACCOUNTING Cheryl S. McWatters, Jerold L. Zimmerman, Dale C. Morse Cheryl S. McWatters, Jerold L. Zimmerman,
C H A P T E R 9 Evaluating Personnel and Divisions.
1 PowerPointPresentation by PowerPoint Presentation by Gail B. Wright Professor Emeritus of Accounting Bryant University MANAGERIAL ACCOUNTING 10 TH EDITION.
1 TRADITIONAL PRODUCT COSTING METHODS Accounting Principles II AC Fall Semester, 1999.
23 Performance Evaluation Using Variances from Standard Costs
Standard Costs and Balanced Scorecard
1 Copyright  2010 & 2007 McGraw-Hill Australia Pty Ltd PPTs t/a Accounting: What the Numbers Mean 2e (revised) by Marshall, McCartney & Van Rhyn PowerPoint.
MANUFACTURING COMPANY: COST-VOLUME-PROFIT PLANNING AND ANALYSIS
© The McGraw-Hill Companies, Inc., 2005 McGraw-Hill/Irwin 17-1 JOB ORDER COST SYSTEMS AND OVERHEAD ALLOCATIONS Chapter 17.
Full Costs and Their Uses
© The McGraw-Hill Companies, Inc., 2008 McGraw-Hill/Irwin Financial & Managerial Accounting The Basis for Business Decisions FOURTEENTH EDITION Williams.
Chapter 12 – Standard Costs: Direct Labor and Materials
Budgeting and Standard Cost Systems Chapter 13. Budgeting A budget is a financial and quantitative plan for the acquisition and use of resources Use for.
© 2016 Pearson Education, Inc.
1 Profit and Cost Center Performance Evaluation CHAPTER 10 © 2012 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in.
Financial and Managerial Accounting
8-1 Fundamental Managerial Accounting Concepts Thomas P. Edmonds Bor-Yi Tsay Philip R. Olds Copyright © 2009 by The McGraw-Hill Companies, Inc. All rights.
CHAPTER 8 Performance Evaluation. The McGraw-Hill Companies, Inc. 2008McGraw-Hill/Irwin 8-2 Learning Objective LO1 To describe flexible and static budgets.
Chapter 23 Flexible Budgets and Standard Cost Systems
© 2013 Cengage Learning. All Rights Reserved. May not be scanned, copied, duplicated, or posted to a publicly accessible website, in whole or in part.
1 Module19 Assigning Indirect Costs: Activity-Based Costing (omit pp to 19-13)
@ 2012, Cengage Learning Performance Evaluation Using Variances from Standard Costs LO 4 – Computing Factory Overhead Variances.
Absorption Cost Systems Chapter Nine Copyright © 2014 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
Do other companies like BMW Group use manufacturing standards to guide performance at their plants? 1.Yes 2.No.
Copyright © 2012 The McGraw-Hill Companies, Inc. PowerPoint Authors: Susan Coomer Galbreath, Ph.D., CPA Charles W. Caldwell, D.B.A., CMA Jon A. Booker,
Managerial Accounting: An Introduction To Concepts, Methods, And Uses
MCS UNS chapter 6 :Variance Analysis
Standard Costs: Direct Labor and Materials
CHAPTER NINE Absorption Cost Systems. McGraw-Hill/Irwin © 2003 The McGraw-Hill Companies, Inc., All Rights Reserved. 9-2 Outline of Chapter 9 Absorption.
© 2012 Cengage Learning. All Rights Reserved. May not be copied, scanned, or duplicated, in whole or in part, except for use as permitted in a license.
Absorption Cost Systems Chapter Nine McGraw-Hill/Irwin Accounting for Decision Making and Control, 5/e © 2006 The McGraw-Hill Companies, Inc.,
ACC3200 STANDARD COSTING.
Chapter 16 Fundamentals of Variance Analysis.
AC239 Managerial Accounting Seminar 7 Jim Eads, CPA, MST, MSF Performance Evaluation Using Variances from Standard Costs 1.
IES 342 Industrial Cost Analysis & Control | Dr. Karndee Prichanont, SIIT 1 Cost Allocation: Service Departments & Joint Product Costs Chapter 12 Objectives:
Standard Costing and Variance Analysis
AC239 Managerial Accounting Seminar 7 Jim Eads, CPA, MST, MSF Performance Evaluation Using Variances from Standard Costs 1.
Chapter 17 Inventory & Control What we will cover: n Standard costs n Variance Analysis.
© The McGraw-Hill Companies, Inc., 2002 McGraw-Hill/Irwin Accounting Systems For Measuring Costs Chapter 17.
Chapter 17 Overhead Cost Management Flexible Budgets.
Chapter 23 Flexible Budgets and Standard Cost Systems.
Cost Allocation and Responsibility Accounting
Chapter Fifteen Performance Evaluation © 2015 McGraw-Hill Education.
Copyright © 2010 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Job Order Cost Systems and Overhead Allocations Chapter 17.
© John Wiley & Sons, 2011 Chapter 14: Measuring and Assigning Costs for Income Statements Eldenburg & Wolcott’s Cost Management, 2eSlide # 1 Cost Management.
Cornerstones of Managerial Accounting, 5e.
Financial & Managerial Accounting 2002e
Criticisms of Absorption Cost Systems: Incentive to Over-produce
COST ANALYSIS FOR CONTROL
CHAPTER 14 Cost Allocation, Customer Profitability Analysis, and
Cost Accounting and Reporting Systems
Activity-Based Costing and Activity-Based Management
Cornerstones of Managerial Accounting 2e Chapter Fourteen
Overhead and Marketing Variances
STANDARD COSTS AND VARIANCE ANALYSIS FOR DECISION MAKING
Foundations and Evolutions
Standard Cost Accounting Materials, Labor, and Factory Overhead
AMIS 3300 Chapter 9.
CHAPTER 14 Cost Allocation, Customer Profitability Analysis, and
Flexible Budgets, Variances, and Management Control: I
Presentation transcript:

Standard Costs – Overview 1. What are standard Costs. 2. Why do we set standard costs? 3. How do we set the standards? 4. Calculating Variances: DM and DL-Disaggregating variances into price and volume.-Difference between labor and direct materials.-How do we use variances in evaluating performance? 5. Calculating Overhead variances. 6. The incentives created when Standard cost systems are implemented

Standard Costs What are standard Costs? Standard costs are the expected costs of manufacturing the product. Standard Direct Labor Costs = Expected wage rate X Expected number of hours Standard Direct Materials cost = Expected cost of raw materials X Expected number of units of raw material. Standard overhead costs = Expected fixed OH + Expected Variable Overhead X Expected number of units to be produced.

Standard Costs What is a standard Cost system? A standard cost system is a method of setting cost targets and evaluating performance. Targets or expected costs are set based on a variety of criteria, and actual performance relative to expected targets is measured. Significant differences between expectations and actual results are investigated. Consistent with the themes developed throughout this class, standard cost systems are a means of helping managers with decision making and control.

Standard Costs Target Costing 1. The market place determines the selling price of the future product 2. The company determines the profit margin they desire to achieve on this product. 3. The difference between the selling price and the profit margin is the target cost

Standard Costs Why use a standard cost system? 1. Standards are important for decision making - How we produce our product. - How we price our product. - Contract billing 2. Monitor manufacturing - Large variances may indicative of problems in production. 3. Performance measurement - Deviations between actual and standards are often used as measures of a manager’s performance - Who sets the standard?

Standard Costs How do we set the standards? Theoretically the standard should be the expected cost of producing the product. General practice: 1. Prior years performance 2. Expected future performance under normal operating conditions. 3. Optimistic (Motivator)

Standard Costs Important considerations in setting standards: 1. Why are senior managers using standards? - Pricing - Performance measurement - Production decisions 2. What happens if managers fail to meet the standards? 3. Standards are supposed to represent the opportunity cost of production.

Standard Costs Consider the following information on Beer manufacturing:

Standard Costs

Standard Costs Raw Material Price Variance:

Standard Costs Raw Material Quantity Variance:

Standard Costs What do we do with the raw materials price variance? Who do we hold responsible? What do we do with the raw materials quantity variance?

Standard Costs Direct Labor Wage Variance: There is a $1100 unfavorable wage variance

Standard Costs Direct Labor Efficiency Variance: There is a $1000 unfavorable Efficiency variance

Arrow Industries (problem 12-3) See the exercise “Arrow Industries”: Problem 12-3 in Zimmerman, Jerold L. Accounting for Decision Making and Control (4th Edition). McGraw-Hill/Irwin, 2002, pp 624-5.

Howard Binding (Problem 12-16) See the exercise “Howard Binding”: Problem 12-16 in Zimmerman, Jerold L. Accounting for Decision Making and Control (4th Edition). McGraw-Hill/Irwin, 2002, pp 630.

Standard Costs There are three types of overhead variances that are commonly computed in standard cost systems. Before we describe each of these variances we need to do a brief review on overhead. 1. Overhead consists of both fixed costs and variable costs. 2. Overhead is allocated to the product using an activity base. Thus overhead variances can occur for three reasons 1. the activity base estimate is different than the actual activity base. 2. The amount spent for fixed overhead differs from the standard. 3. The amount spent on variable overhead (the rate per unit) differs from the standard.

Standard Costs Overhead spending variance This variance is designed to measure how much overhead was actually incurred compared to the overhead that should have been incurred at the actual volume for the activity base. Spending variance = Actual overhead – budgeted fixed costs – budgeted variable overhead allocation rate * actual activity base.

Standard Costs Overhead efficiency variance This variance is a measure of the effect of the difference in the amount of an activity base incurred compared to the expected amount of the activity base. Using additional machine hours or direct labor hours causes additional variable overhead Efficiency variance = Variable overhead allocation rate * ( actual activity base – budgeted activity base)

Western Sugar (Problem 13-9) See the exercise “Western Sugar”: Problem 13-9 in Zimmerman, Jerold L. Accounting for Decision Making and Control (4th Edition). McGraw-Hill/Irwin, 2002, pp 660-1.

Overhead volume variance Standard Costs Overhead volume variance The overhead volume variance measures the cost or benefits of using less or more than expected capacity. Volume Variance = Fixed Overhead *(Budgeted volume – actual volume) budgeted volume If budgeted volume = actual volume, then you have derived no extra benefits or costs associated with capacity. When budgeted volume is less than expected volume, then the fixed costs associated with providing capacity are greater than expectations

Standard Costs When standards are used to measure performance, then the manager has an incentive to insure production costs come in below standards. Consider the following good and bad incentives: Direct Material Price standards create the incentive to purchase materials in large volume to get price discounts. Direct Material Price standards create the incentive to reduce the quality of the material purchased. Standards create the incentive for cross monitoring. When managers are held responsible for costs that are outside of their control, they will monitor other managers to ensure they meet standards. Managers also have the incentive to control costs so long as they do not exceed the standard. No incentive to reduce costs below standard.

Standard Costs What controls can you implement to discourage the harmful incentives and encourage the productive incentives? Just-in-time inventory System of Quality Control Engineering specifications Controllability of Costs Non-linear reward system for cost reduction.

Activity Based Costing How do we use Activity Based Costing? 1. Costs are accumulated in activity centers (a.k.a. Cost Centers such as order processing or special components) 2. Managers select an activity base for the center to apply the cost to the product. Multiple cost drivers in the firm Use non-financial measures to reduce the tax on production activities. Four Basic types of Cost Drivers: Unit level Batch Level Product Level Production Sustaining Costs   3. Costs are allocated to the product as the product passes through the activity center.

Activity Based Costing What are the benefits of using Activity Based Costing Systems? 1. More costs are traced to the product. 2. Activity Based Costing Requires managers to obtain a better understanding of: How costs are consumed by individual products. The different activities that produce products. The indirect costs associated with these activities. How indirect costs relate to cost drivers. 3. Product costs are more accurate. Proponents argue that having more accurate costs will help in decision making

Activity Based Costing Key Points regarding Activity Based Costing: Useful for developing a more accurate measure of the cost of multiple products with different levels of manufacturing sophistication and different volumes of production. Managers must recognize that overhead varies by factors other than volume of production for the product. The managers ability to successfully identify these cost drivers will ultimately determine the usefulness of an ABC costing system.

Activity Based Costing What are the costs of implementing an Activity Based Cost system? Updating the accounting system and maintaining an ABC system requires additional time and money. Managers select cost drivers in their activity centers. There is a tradeoff between decision making and control. While ABC systems may more accurately measure costs, they ignore the benefits of a multi-product production strategy. Generally ABC system demonstrate that low volume products are more costly to produce than high volume products. This is a very costly method to derive this result.